2407 Walton Avenue
Bronx, NY 10468BBL 2-03188-0077Map
Owner of record: Selimovic, Mirsad
2407 Walton Avenue is a walk-up apartment building built in 1901 in Bronx, 10468. It has 3 residential units across 3 floors. The owner of record is Selimovic, Mirsad. HPD has recorded 65 housing violations here, most recently on September 3, 2026. 28 of the 50 most recent violations are still open.
- HPD violations
- 65
- DOB violations
- 3
- ECB violations
- 11
- HPD complaints
- 38
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 65
- BHazardous
Properly repair with similar material the broken or defective fire retardant material at west wall at public hall, 2nd story
Sep 3, 2026
Open — Nov certified on time - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wiring at west wall at public hall, 2nd story
Sep 3, 2026
Open — Nov certified on time - BHazardous
Properly repair or replace the broken or defective celing light fixture in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from east at south
Apr 30, 2026 · Apt 2
Open — Nov certified late - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Apr 30, 2026 · Apt 2
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Apr 30, 2026 · Apt 2
Open — Nov certified late - BHazardous
Properly repair or replace the broken or defective counter balance at lower window sash in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Apr 30, 2026 · Apt 2
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Apr 30, 2026 · Apt 2
Open — Nov certified late - BHazardous
Properly repair or replace the broken or defective ceiling light fixture in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Apr 30, 2026 · Apt 2
Open — Nov certified late - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Mar 30, 2026 · Apt 2
Open — Nov certified late - BHazardous
Provide an adequate supply of gas to the fixtures at stove in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Mar 30, 2026 · Apt 2
Open — Nov certified late
Show 40 more ↓
- BHazardous
Provide a safe and adequate supply of electric service to the fixtures , in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Mar 30, 2026 · Apt 2
Open — Nov certified late - BHazardous
Properly repair or replace the broken or defective counter spring balance at 1st window from north at west in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Mar 30, 2026 · Apt 2
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color north wall behind stove in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Mar 30, 2026 · Apt 2
Open — Nov certified late - ANon-hazardous
Properly repair the source and abate the evidence of a water leak over ceiling at closet in the private hallway located at apt 2, 2nd story, 1st apartment from east at south
Mar 30, 2026 · Apt 2
Open — Nov certified late - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in closet in the private hallway located at apt 2, 2nd story, 1st apartment from east at south
Mar 30, 2026 · Apt 2
Open — Nov certified late - BHazardous
Provide a safe and adequate supply of electric service to the fixtures , at public hall, 2nd story
Mar 30, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective south handrail at front stoop , 1st story
Mar 30, 2026
Closed — Violation dismissed - BHazardous
South wall created from floor to ceiling at private hallway creating en1, es1 & es3 rooms for living creating illegal class ''a'' apt at the upper level located at apt 2, 2nd story, 2nd apartment from south at west
Mar 30, 2026 · Apt 2
Open — Nov certified late - BHazardous
File plans or restore to legal condition of said alteration south wall created from floor to ceiling at private hallway at lower level located at apt 2, 2nd story, 2nd apartment from south at west
Mar 30, 2026 · Apt 2
Open — Nov certified late - BHazardous
File plans or restore to legal condition-altered-plumbing fixtures where illegal, properly seal pipe connections behind walls, under floor at created kitchen/bathroom at upper level located at apt 2, 2nd story, 2nd apartment from south at west
Mar 30, 2026 · Apt 2
Open — Nov certified late - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas range with oven installed at upper level in illegally created kitchen located at apt 2, 2nd story, 2nd apartment from south at west
Mar 30, 2026 · Apt 2
Open — Nov certified late - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tile in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Mar 30, 2026 · Apt 2
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 24, 2025
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling approx 6 sq ft, south wall approx 4 sq ft and north wall approx 2 sq ft in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Mar 7, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective escutcheon plate at steam riser top in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Mar 7, 2024 · Apt 2
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2f, 2nd story, 1st apartment from east at south
Oct 24, 2022 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair the broken or defective 2nd lower sash window spring balance at west wall in the kitchen located at apt 2f, 2nd story, 1st apartment from east at south
Oct 24, 2022 · Apt 2F
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Oct 24, 2022 · Apt 2F
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Oct 24, 2022 · Apt 2F
Open — Nov sent out - BHazardous
Abate the nuisance consisting of slide bolt lock with eye on interior door in the entrance located at apt 2f, 2nd story, 1st apartment from east at south
Oct 24, 2022 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair the broken or defective 2nd lower sash window spring balance at east wall in the 1st room from east at south located at apt 2f, 2nd story, 1st apartment from east at south
Oct 24, 2022 · Apt 2F
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of discarded refrigerator with door intact, at public hall, 1st story
Apr 29, 2022
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Mar 30, 2022 · Apt 2
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jul 15, 2021
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Jul 14, 2021 · Apt 1
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Jul 14, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures no gas at gas range in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Jul 14, 2021 · Apt 1
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 5 sq ft ceiling in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Jul 14, 2021 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Jul 14, 2021 · Apt 1
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 14, 2021
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
Jul 14, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story
Jul 14, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jul 14, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 14, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 2nd entire apartment from east located at apartment 1, 1st story, 1st apartment from south at west
Jul 14, 2021 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom located at apt 1, 1st story, 1st apartment from south at west
Jul 14, 2021 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approx 5 sq ft ceiling in the bathroom located at apt 1, 1st story, 1st apartment from south at west original violation 14437948 issued 14-jul-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jul 14, 2021 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Replace with new the broken or defective concrete treads ( total =3 ) at stoop
May 22, 2017
Closed — Violation closed
DOB building violations · 3
- Construction other optional
The department of buildings intends to revoke the approvals and permits issued in connection with the application# 220487505 pursuant to sections 28-104.2.10 and 28-105.10.1 of administrative code.
Sep 20, 2022
Dob violation - dismissed - Construction other optional
The department of buildings intends to revoke the approvals and permits issued in connection with the application# 220487505 pursuant to sections 28-104.2.10 and 28-105.10.1 of administrative code.
Sep 20, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 30, 2015
Dob violation - active
ECB violations · 11
- Class - 2
Failure to conduct or file a final inspection of permitted work with the department. noted: at time of inspection - 2nd & 3rd flrs were observed converted into class 'a' apts with completed plumbing & partition
Apr 30, 2026 · Penalty $6,250
Active - Class - 2
W/o a permit. noted: 1. at cellar - full height partition walls erected throughout to create an apt at rear & bthrm; 2. cmu block wall erected at exposure 1 apprx 6 1/2' x 12' with swing door, plexi glass roof,
Apr 30, 2026 · Penalty $6,250
Active - Class - 1
Residence converted from a 2 to 4 family dwelling. noted: at time of inspection - class 'a' apts observed created & occupied at cellar, 1st, 2nd & 3rd flrs. each with 3 pc bthrm; kitchen with gas stove, residen
Apr 30, 2026 · Penalty $70,000
Active - Class - 1
Failure to maintain building in code compliant manner. noted: at time of inspection - 1. cement front entry steps observed with a broken bottom tread creating a fall hazard; 2. rain leader at exposure 1 missing
Apr 30, 2026 · Penalty $12,500
Active - Class - 2
Contrary to dob/official records which indicates 2 class 'a' apts: at time of inspection - 3rd flr front rm was observed created & occupied as a sro with key lock at rm entry door, bed, toiletries, freezer, per
Apr 30, 2026 · Penalty $620
Active - Class - 1
W/o a permit. noted: at cellar - water & waste lines installed for a 3 pc bthrm; residential sink at kitchen area. gas line installed for stove., obtain permit
Apr 30, 2026 · Penalty $12,500
Active - Class - 1
W/o a permit. noted: electrical wiring installed: 1. at cellar for addl't lights, outlets, switches; 2. disconnect boxes for split units installed attached to exposure 1 exterior wall; air handlers throughout i
Apr 30, 2026 · Penalty $12,500
Active - Class - 1
Work w/o a permit. work noted: observed 2 illegal apt cellar & 3 fl cellar has a gas stove sink w/water lines & a 3pc bathroom w/water linesfull partition walls a waste line also 2 electrical panels brand new
Jul 28, 2016
Resolve - Class - 1
Occupancy contrary to that allowed by the c of o or bldg dept records.work noted: observed 2 illegal class'a'apt tje cellar has a studio apt w/a full kitchen & a 3pc bathroom w/2 means of egress & 3 floor apt
Jul 28, 2016
Resolve - Class - 1
Occupancy in contrary to that allowed by c/o or dob records. occupied illegal class "a" apt created at cellar and an illegal conversion at 3rd sty. 3rd sty is to be used in conjunction with 2nd sty as a duplex
Jul 8, 2015 · Penalty $2,400
Active
Show 1 more ↓
- Non-hazardous
Work w/o a permit-cellar-erected sheetrock partition to create boiler room, storage room and laundry. remedy: obtain permits-plumbing,electrical,construction or restore premises to prior legal condition.
Oct 21, 2005
Resolve
Complaints
- Plumbing
Water supply
Aug 3, 2026 · Apt 2NDFLO
Close - Appliance
Electric/gas range
Aug 3, 2026 · Apt 2NDFLO
Close - Heat/hot water
Entire building
Jul 2, 2026 · Apt BLDG
Close - General
Cooking gas
Jul 2, 2026 · Apt BLDG
Close - General
Cooking gas
Aug 17, 2022 · Apt 2F
Close - Appliance
Electric/gas range
Nov 10, 2021 · Apt 2F
Close - Paint/plaster
Wall
Jul 3, 2021 · Apt 1
Close - Heat/hot water
Entire building
Jul 3, 2021 · Apt 1
Close - General
Cooking gas
Jul 3, 2021 · Apt 1
Close - Heat/hot water
Entire building
Apr 23, 2021 · Apt 2F
Close
Show 28 more ↓
- Heat/hot water
Apartment only
Mar 2, 2021 · Apt 1
Close - Heat/hot water
Entire building
Feb 13, 2021 · Apt 1
Close - General
Cooking gas
Feb 8, 2021 · Apt 1
Close - Heat/hot water
Entire building
Feb 8, 2021 · Apt 1
Close - General
Cooking gas
Jan 21, 2021 · Apt 1
Close - Heat/hot water
Entire building
Jan 21, 2021 · Apt 1
Close - Heat/hot water
Entire building
Jan 19, 2021 · Apt 1FL
Close - Heat/hot water
Entire building
Jan 11, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 9, 2021 · Apt 1
Close - Heat/hot water
Apartment only
Jan 9, 2021 · Apt 1
Close - Heat/hot water
Apartment only
Oct 26, 2020 · Apt 1
Close - Appliance
Electric/gas range
Oct 26, 2020 · Apt 1
Close - Door/window
Window frame
Apr 23, 2017 · Apt A2
Close - Door/window
Window pane
Apr 23, 2017 · Apt A2
Close - Door/window
Window pane
Jun 17, 2016 · Apt A2
Close - Flooring/stairs
Floor
Jun 17, 2016 · Apt A2
Close - Unsanitary condition
Pests
Jun 17, 2016 · Apt A2
Close - Door/window
Window frame
Jun 17, 2016 · Apt A2
Close - Appliance
Refrigerator
Jun 17, 2016 · Apt A2
Close - Heat/hot water
Entire building
Jun 17, 2016 · Apt A2
Close - Heat/hot water
Entire building
Jul 14, 2015 · Apt 1
Close - Electric
Power outage
Jul 14, 2015 · Apt 1
Close - Heat/hot water
Apartment only
Jul 6, 2015 · Apt 1
Close - Heat/hot water
Entire building
Jul 6, 2015 · Apt 1
Close - Electric
Power outage
Jul 6, 2015 · Apt 1
Close - Heat/hot water
Apartment only
Jul 4, 2015 · Apt 1
Close - Electric
Power outage
Jul 4, 2015 · Apt 1
Close - Electric
Power outage
Jun 29, 2015 · Apt A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1901
- Floors
- 3
- Residential units
- 3
- Building area
- 2,220 ft²
- Lot area
- 1,896 ft²
- Zoning
- R8
- Community board
- 205
- Council district
- 14
- Block / lot
- 3188 / 77
- Assessed value
- $44,220
- Landmark / historic district
- No
HPD registration #714585, last renewed Apr 30, 2026.
Questions about 2407 Walton Avenue
Who owns 2407 Walton Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Selimovic, Mirsad.
Does 2407 Walton Avenue have violations?
Yes. NYC HPD has recorded 65 housing violations at this property.
Is 2407 Walton Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2407 Walton Avenue built?
City records list 1901 as the year it was built.
How many apartments are in 2407 Walton Avenue?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.