roofy

114 Field Place

Bronx, NY 10468BBL 2-03172-0022Map

Owner of record: West 3 Equities Corp.

114 Field Place is a walk-up apartment building built in 1916 in Bronx, 10468. It has 27 residential units across 5 floors. The owner of record is West 3 Equities Corp.. HPD has recorded 304 housing violations here, most recently on May 17, 2026. 38 of the 50 most recent violations are still open.

HPD violations
304
DOB violations
8
ECB violations
1
HPD complaints
567

What to know

Concern
14 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 17, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 304

  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, 1st window frame from west at north wall in the 3rd room from north at west located at apt 42, 4th story, 1st apartment from south at west

    May 17, 2026 · Apt 42

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 4th room from north located at apt 42, 4th story, 1st apartment from south at west

    May 17, 2026 · Apt 42

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 3rd room from north at east located at apt 42, 4th story, 1st apartment from south at west

    May 17, 2026 · Apt 42

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st window frame from south at west wall in the bathroom located at apt 42, 4th story, 1st apartment from south at west

    May 17, 2026 · Apt 42

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 42, 4th story, 1st apartment from south at west

    May 17, 2026 · Apt 42

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the kitchen located at apt 42, 4th story, 1st apartment from south at west

    May 17, 2026 · Apt 42

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish glaze at bathtub in the bathroom located at apt 42, 4th story, 1st apartment from south at west

    May 17, 2026 · Apt 42

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 42, 4th story, 1st apartment from south at west

    May 17, 2026 · Apt 42

    Open — Notice of issuance sent to tenant
  • A

    Properly repair with similar material the broken or defective vinyl tiles at floor in the 3rd room from north at west located at apt 42, 4th story, 1st apartment from south at west

    May 17, 2026 · Apt 42

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north located at apt 42, 4th story, 1st apartment from south at west

    May 17, 2026 · Apt 42

    Open — Nov sent out
Show 40 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall, 1st door frame from north at east wall in the 3rd room from north at west located at apt 42, 4th story, 1st apartment from south at west

    May 17, 2026 · Apt 42

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the 4th room from north located at apt 42, 4th story, 1st apartment from south at west

    May 17, 2026 · Apt 42

    Open — Nov sent out
  • A

    Properly repair the source and abate the evidence of a water leak the ceiling in the 4th room from north located at apt 42, 4th story, 1st apartment from south at west

    May 17, 2026 · Apt 42

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the south wall, north wall in the 3rd room from north at east located at apt 42, 4th story, 1st apartment from south at west

    May 17, 2026 · Apt 42

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the north wall in the bathroom located at apt 42, 4th story, 1st apartment from south at west

    May 17, 2026 · Apt 42

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall, south wall in the kitchen located at apt 42, 4th story, 1st apartment from south at west

    May 17, 2026 · Apt 42

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 53, 5th story, 1st apartment from east at south

    May 17, 2026 · Apt 53

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 53, 5th story, 1st apartment from east at south

    May 17, 2026 · Apt 53

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective spring balance at lower and upper sashes at window in the 2nd room from east located at apt 53, 5th story, 1st apartment from east at south

    May 17, 2026 · Apt 53

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective wood door at entrance in the 1st room from east located at apt 53, 5th story, 1st apartment from east at south

    May 17, 2026 · Apt 53

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective mortise lock at door in the 1st room from east located at apt 53, 5th story, 1st apartment from east at south

    May 17, 2026 · Apt 53

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl ..... in the bathroom located at apt 53, 5th story, 1st apartment from east at south

    May 17, 2026 · Apt 53

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in waste line at washbasin at west wall in the bathroom located at apt 53, 5th story, 1st apartment from east at south

    May 17, 2026 · Apt 53

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 42, 4th story, 1st apartment from south at west

    May 17, 2026 · Apt 42

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Jan 29, 2026

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 31, 3rd story, 2nd apartment from south at west

    Jan 29, 2026 · Apt 31

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 31, 3rd story, 2nd apartment from south at west

    Jan 29, 2026 · Apt 31

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department north wall at public hall, 6th story

    Oct 12, 2025

    Closed — Violation dismissed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at public hall, 6th story

    Oct 12, 2025

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective broken glass at s2 lower sash window from east at public hall, 6th story

    Oct 12, 2025

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 6th story

    Oct 12, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 24, 2nd story, 2nd apartment from north at east

    Oct 1, 2025 · Apt 24

    Open — Not complied with
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 2nd apartment from south at west

    Nov 30, 2024 · Apt 1

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of scolding hot water temperature 137 degrees in the entire apartment located at apt 1, 1st story, 2nd apartment from south at west

    Nov 30, 2024 · Apt 1

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Nov 30, 2024

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at window frame from west at north wall in the 3rd room from north at east located at apt 24, 2nd story, 2nd apartment from north at east original violation 17217463 issued 23-aug-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Aug 23, 2024 · Apt 24

    Open — Not complied with
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st window frame from east at south wall in the 4th room from north located at apt 24, 2nd story, 2nd apartment from north at east

    Aug 23, 2024 · Apt 24

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 24, 2nd story, 2nd apartment from north at east

    Aug 23, 2024 · Apt 24

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 24, 2nd story, 2nd apartment from north at east

    Aug 23, 2024 · Apt 24

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at 1st window frame from west at north wall in the 3rd room from north at east located at apt 24, 2nd story, 2nd apartment from north at east

    Aug 23, 2024 · Apt 24

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the kitchen located at apt 24, 2nd story, 2nd apartment from north at east

    Aug 23, 2024 · Apt 24

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the foyer located at apt 24, 2nd story, 2nd apartment from north at east

    Aug 23, 2024 · Apt 24

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 3rd room from north at west, the 3rd room from north at east located at apt 24, 2nd story, 2nd apartment from north at east

    Aug 23, 2024 · Apt 24

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the kitchen located at apt 24, 2nd story, 2nd apartment from north at east

    Aug 23, 2024 · Apt 24

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall, east wall, south wall in the kitchen located at apt 24, 2nd story, 2nd apartment from north at east

    Aug 23, 2024 · Apt 24

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the north wall in the 4th room from north located at apt 24, 2nd story, 2nd apartment from north at east

    Aug 23, 2024 · Apt 24

    Open — Nov sent out
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes bicycles at north balcony at fire escape, 5th story

    Aug 23, 2024

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the foyer located at apt 24, 2nd story, 2nd apartment from north at east

    Aug 23, 2024 · Apt 24

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood door in the bathroom located at apt 24, 2nd story, 2nd apartment from north at east

    Aug 23, 2024 · Apt 24

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 24, 2nd story, 2nd apartment from north at east

    Aug 23, 2024 · Apt 24

    Open — Nov sent out

DOB building violations · 8

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed

ECB violations · 1

  • Class - 2

    Work w/o a permit.noted:in apt 1 @ 1st fl erected full height partitions creating additional illegal room.according to nyc bc any rearrangenement of any parts of a bldg affecting light or ventilation requires d

    Aug 18, 2014 · Penalty $800

    Active

Complaints

  • Unsanitary condition

    Pests

    Aug 4, 2026 · Apt 42

    Close
  • Paint/plaster

    Ceiling

    Aug 4, 2026 · Apt 42

    Close
  • Paint/plaster

    Wall

    Aug 4, 2026 · Apt 42

    Close
  • Door/window

    Door

    Aug 4, 2026 · Apt 42

    Close
  • Water leak

    Slow leak

    Aug 4, 2026 · Apt 42

    Close
  • Paint/plaster

    Wall

    Aug 4, 2026 · Apt 42

    Close
  • Plumbing

    Bathtub/shower

    Aug 4, 2026 · Apt 42

    Close
  • Flooring/stairs

    Floor

    Aug 4, 2026 · Apt 42

    Close
  • Flooring/stairs

    Floor

    Aug 4, 2026 · Apt 42

    Close
  • Door/window

    Window frame

    Aug 4, 2026 · Apt 42

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Jun 5, 2026 · Apt 53

    Close
  • Heat/hot water

    Apartment only

    May 19, 2026 · Apt 53

    Close
  • Water leak

    Damp spot

    Apr 21, 2026 · Apt 42

    Close
  • Plumbing

    Bathtub/shower

    Apr 9, 2026 · Apt 53

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 9, 2026 · Apt 30THIR

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 3, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 28, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 24, 2026 · Apt 31

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 8, 2025 · Apt 33

    Close
  • Heat/hot water

    Entire building

    Dec 8, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 8, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 8, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 8, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 12, 2025 · Apt 6A

    Close
  • Heat/hot water

    Entire building

    Oct 12, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 12, 2025 · Apt 3

    Close
  • Heat/hot water

    Entire building

    Apr 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 29, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 29, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 29, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 3, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 18, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 8, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 8, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 8, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 8, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 22, 2024 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1916
Floors
5
Residential units
27
Building area
22,368 ft²
Lot area
6,300 ft²
Zoning
R8
Community board
205
Council district
14
Block / lot
3172 / 22
Assessed value
$737,550
Landmark / historic district
No

HPD registration #207731, last renewed Sep 24, 2025.

Questions about 114 Field Place

Who owns 114 Field Place?

The owner of record in NYC Department of City Planning PLUTO data is West 3 Equities Corp..

Does 114 Field Place have violations?

Yes. NYC HPD has recorded 304 housing violations at this property.

Is 114 Field Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 114 Field Place built?

City records list 1916 as the year it was built.

How many apartments are in 114 Field Place?

It has 27 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.