2047 Ryer Ave
Bronx, NY 10457BBL 2-03156-0072Map
Owner of record: Gw Ryer LLC
2047 Ryer Ave is an elevator apartment building built in 2024 in Bronx, 10457. It has 131 residential units across 12 floors. The owner of record is Gw Ryer LLC. HPD has recorded 146 housing violations here, most recently on October 9, 2026. 49 of the 50 most recent violations are still open.
- HPD violations
- 146
- DOB violations
- 5
- ECB violations
- 34
- HPD complaints
- 218
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 146
- ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Oct 9, 2026
Open — Violation open - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Oct 9, 2026
Open — Violation open - ANon-hazardous
Cleanse to the satisfaction of this department the 3rd story public hall , 3rd story
Oct 9, 2026
Open — Violation open - ANon-hazardous
Cleanse to the satisfaction of this department the 1st story public hall , 1st story
Oct 9, 2026
Open — Violation open - BHazardous
Remove all encumbrances consisting of garbage at compactor closet, 9th story
Oct 1, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at hopper chute at compactor closet, 6th story
Oct 1, 2026
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Oct 1, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor
Oct 1, 2026
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of observed flies at public hall stairs, 6th story
Oct 1, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 6b, 6th story, 1st apartment from west at north
Oct 1, 2026 · Apt 6B
Open — Nov sent out
Show 40 more ↓
- BHazardous
Refit door at entrance in the bathroom located at apt 6b, 6th story, 1st apartment from west at north
Oct 1, 2026 · Apt 6B
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at compactor closet, 9th story
Oct 1, 2026
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of observed flies at public hall, 9th story
Oct 1, 2026
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the floor at public hall, 9th story
Oct 1, 2026
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of observed flies in the entire apartment located at apt 6d, 6th story, 2nd apartment from east at south
Oct 1, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 6d, 6th story, 2nd apartment from east at south
Oct 1, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Refit door at closet at north wall in the 1st room from east located at apt 6d, 6th story, 2nd apartment from east at south
Oct 1, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 6d, 6th story, 2nd apartment from east at south
Oct 1, 2026 · Apt 6D
Open — Nov sent out - CImmediately hazardous
Remove all obstructions from water closet wasteline at water closet in the bathroom located at apt 6d, 6th story, 2nd apartment from east at south
Oct 1, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door in the bathroom located at apt 6b, 6th story, 2nd apartment from south at west
Sep 27, 2026 · Apt 6B
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of flies at public hall, 1st story
Sep 27, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Sep 27, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Sep 27, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective latch set and its assemblys at street door at public hall, 1st story
Sep 27, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [latch set ] at street door at public hall, 1st story
Sep 27, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [hinge] hopper door at refuse room at public hall, 6th story
Sep 27, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, and west wall in the bathroom located at apt 6b, 6th story, 2nd apartment from south at west
Sep 27, 2026 · Apt 6B
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the ... at compactor closet, 9th story
Sep 26, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door at public hall, 1st story
Sep 26, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch and its assembly at buildibg entrance door at public hall, 1st story
Sep 26, 2026
Open — Nov sent out - BHazardous
Properly secure the loose 7th light from south at ceiling at public hall, 1st story
Sep 26, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retarded materials at ceiling at public hall, 1st story
Sep 26, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper door at compactor closet, 9th story
Sep 26, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of debris at public hall, 2nd story
Sep 26, 2026
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the floor at compactor closet, 8th story
Sep 26, 2026
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of flies at public hall, 1st story
Sep 26, 2026
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 9c, 9th story, 1st apartment from south at west
Sep 26, 2026 · Apt 9C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Sep 26, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the house hold garbage bags and cardboard boxes at floor at compactor closet, 11th story
Sep 23, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet, 12th story
Sep 23, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of bicycle at public hall stairs, 12th story
Sep 23, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the household garbage bags and cardboard boxes at floor at compactor closet, 12th story
Sep 23, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at compactor closet, 9th story
Sep 23, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the household garbage bags and cardboard boxes at floor at compactor closet, 9th story
Sep 23, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the house hold garbage bags and cardboard boxes at floor yard
Sep 23, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household rubbish at public hall, 3rd story
Sep 18, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective locking device at door in the entrance located at apt 4b, 4th story, 1st apartment from south at west
Sep 18, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the household garbage bags, recycling, heavy duty garbage bags , cardboard boxes and recycling at floor at compactor closet, 10th story
Sep 10, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembley at building entrance door at public hall, 1st story
Sep 10, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet, 9th story
Sep 10, 2026
Open — Nov sent out
DOB building violations · 5
- Emergency none
1) remove vegetation and loose rocks.2) install steel netting along the entire rock outcropping. steel netting to be held in place by rock anchors
Aug 1, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Plumbing none
The department of buildings intends to revoke all plumbing approvals permits under plumbing application #240153089 due to suspension of li ense.stop all plumbing work immediately except to make site safe
Jul 21, 2017
Dob violation - dismissed
ECB violations · 34
- Class - 2
Class 2 items: : elevator hall call button at the floor does not illuminate and requires repairapplicable asme a17.1 operating-device requirements low weighing device is not connected to the elevator contro
Sep 14, 2026 · Penalty $625
Active - Class - 2
Responding to a 311 complaint, upon inspection found the device was out of service. remedy; repair then contact nycdob, for re-inspection
Apr 2, 2026 · Penalty $3,125
Active - Class - 2
Work does not conform to approved construction documents and/or approved amendments. noted: at time of inspection - mechanical vents were observed installed in kitchen(ettes) throughout building contrary to app
Jun 12, 2025
Resolve - Class - 2
12 story nb active site.i arrived onsite at 7:50am. observed active work without site safety present ssc reg#2609 arrived at 9:10am. also observed unsafe conditions onsite issued partial swo & 5 oath elevator &
Feb 12, 2025 · Penalty $2,530
Resolve - Class - 2
12 story new building active site. observed building in height approx. 115 feet. inspection on elevators onsite 2 interior elevators were not in a working state of readiness as per code bc3003.1.3. request to c
Feb 12, 2025 · Penalty $625
Resolve - Class - 1
12 story 115 ft nb active construction site.observed dry temporary standpipe not in state or readiness as per code. standpipe was not fully painted red as per 3303.7.7.2 ground level also air pressure gauge on
Feb 12, 2025 · Penalty $5,000
Resolve - Class - 2
12 story new building active site. observed worker using/painting yellow supported scaffolds in unsafe manor at ground level exp#1 missing guardrails. also 2 frames scaffolding with missing mudsills, screw jack
Feb 12, 2025
Resolve - Class - 2
12 story new building active site. observed temporary construction equipment in place at exp#1 approximately 8 ft high & 60-80 feet. permit #x00977425. upon research on bis/dob now records show permit expired o
Feb 12, 2025 · Penalty $625
Resolve - Class - 2
A 12 story new building active site. 4-5 trades doing interior work including electrical/painting/housekeeping approximately 30-40 worker's onsite. observed work contrary to shed plans pg eq-002.00 permit#x0103
Dec 16, 2024
Resolve - Class - 2
A 12 story new building active site. 4-5 trades doing interior work including electrical/painting/housekeeping approximately 30-40 worker's onsite. upon inspection of site observed multiple location/floor fire
Dec 16, 2024 · Penalty $625
Resolve
Show 24 more ↓
- Class - 2
28-103.8 failure to maintain embeded safety straps installation inspection log book onsite.as noted:at time of inspection on an active jobsite for a proposed 12 story building concrete const-in-place already at
Nov 7, 2024
Resolve - Class - 2
Failure to provide means and method by pe for concrete repairs as noted:at time of inspection at an active jobsite for a proposed 12 story building concrete const-in-place already at the bulkhead to the cellar
Nov 7, 2024 · Penalty $1,250
Resolve - Class - 1
At time of inspection observed active construction site working on all floors. upon inspecting standpipe system notice no pressure readings at 12 floor or 5 floor. standpipe not in state of readiness. upon requ
Oct 7, 2024 · Penalty $5,000
Resolve - Class - 2
At time of inspection observed active jobsite currently doing concrete pouring. observed concrete trucks being clean up and water going to street sewer. upon requesting dep permit none was provided.
Oct 7, 2024 · Penalty $2,500
Resolve - Class - 2
At time of inspection observed active jobsite. observed concrete pump partially blocking sidewalk. no 5 feet of clearance provided on active pedestrian walkway. observed a member of the public on a wheelchair s
Oct 7, 2024 · Penalty $625
Resolve - Class - 2
3307.4.7 work or storage zones.i noticed at a proposed 12 story building a storage zone adjacent from sidewalk shed without proper protection. storage zone is missing 4 ft barrier and mesh to protect the pedest
Sep 19, 2024 · Penalty $2,400
Resolve - Class - 1
Proposed 12 story building at 9th fl working deck.i noticed pieces of metal pin wedge component used for securing form boards to pour concrete on the backyard used by tenants of 265 east burnside ave neighborin
Sep 19, 2024 · Penalty $10,000
Resolve - Class - 1
3309.17(7) site specific engineered enclosure system at exposure 2 of a proposed 12 story building at 9th fl. enclosure system from engineer didn't meet requirement as per code, resulting in no proper protectio
Sep 19, 2024
Resolve - Class - 1
At a proposed 12 story building at 9th fl.upon reviewing approved site safety plan, i noticed jobsite conditions doesnt reflect plan.missing pipe scaffold at exposure 2 for neighboring building 2401 ryer ave &
Sep 19, 2024 · Penalty $2,500
Resolve - Class - 1
3308.6.1.4.1 in lieu.at a proposed 12 story building at 9th fl working deck.i noticed pipe scaffold below the 8th floor level and deck not even with the building at the work level.this creates a unsafe situati
Sep 19, 2024 · Penalty $5,000
Resolve - Class - 1
At time of inspection of 12 story new building in progress observed missing overhead protection of adjoining property at 265 east burnside ave bronx as per site safety plan. stop all work above 1st floor at cor
Sep 5, 2024 · Penalty $10,000
Resolve - Class - 2
At time of inspection of 12 story new building observed construction damage and debris in rear yard of 265 east burnside ave. bx from 2047 ryer ave bx causing hazardous conditions.provide protection
Sep 5, 2024 · Penalty $5,000
Resolve - Class - 2
Bc 3304.4.4 guardrails: at time of inspection i observed guardrail system inadequately maintained ( loose and wobbly ) around excavation pit as required with workers inside. for worker safety code stipulates th
May 7, 2024
Resolve - Class - 1
Bc 3310.4 site safety monitoring program: at time of inspection i observed active construction work in progress at new proposed 12 story building at excavation phase. upon request to see site safety plan and si
Mar 7, 2024 · Penalty $5,000
Resolve - Class - 2
Due to field conditions rock overhang outcrop removal exceeds permitted removal limits. temporary protection on site not included in dob approved plans. no license engineer on site., conform work to approved co
Jan 11, 2023 · Penalty $625
Resolve - Class - 1
Observed excavation work in progress at test pit without engineer on sitestop all work entire site provide and maintain engineer on site while excavation work in progress
Jun 9, 2022 · Penalty $2,500
Resolve - Class - 1
Observed orientation log was no site specific as required.provide and maintain site specific orientation for all workers
Jun 9, 2022
Resolve - Class - 1
Observed excavation pit with missing guardrails, no bracing and no shoring creating a hazardous fall conditionprovide and maintain protection at excavation pit as required. guardrails , bracing and shoring
Jun 9, 2022 · Penalty $5,000
Resolve - Class - 2
Observed missing information panel with contactors name and number and emergency contact info as well also no permit posted.provide and maintain project info panel with all contacts and numbers
Jun 9, 2022 · Penalty $620
Resolve - Class - 2
Temporary construction fencing permit# x00139513 expired on 04/05/20., renew permit
Nov 19, 2021 · Penalty $625
Resolve - Class - 1
Failure to provide notification prior to commencement of demolition (24-48 hours to dob). note: at the time of inspection observed an excavator on demolition site. 3story building almost full demolished, only
Jul 16, 2019 · Penalty $2,500
Resolve - Class - 1
Mechanical equipment use of demolition w/o proper permit: work with out permit. note: at the time of inspection observed an active demo site. one worker operating a excavator (mechanical equipment) and other
Jul 16, 2019 · Penalty $625
Resolve - Class - 1
No site safety plan. note: at the time of inspection observed a excavator on demolition site. one worker operating excavator and other work er working in front of excavator.construction superintendent came,ask
Jul 16, 2019 · Penalty $625
Resolve - Class - 1
Noted added 2 story extension to bldg and added additional ktcn to create 2family residence from original 1family 2 story extension has appx 16'x16' footprint also added at side and rear a 1story extension appx
Dec 9, 2011 · Penalty $1,600
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Oct 8, 2026 · Apt 10H
Open - Plumbing
Water supply
Oct 7, 2026 · Apt BLDG
Close - Safety
Fire escape
Oct 7, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Oct 7, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Oct 7, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Oct 7, 2026 · Apt 11C
Open - Flooring/stairs
Floor
Oct 7, 2026 · Apt 11C
Open - General
Ventilation system
Oct 7, 2026 · Apt 11C
Open - Unsanitary condition
Mold
Oct 7, 2026 · Apt 11C
Open - Elevator
Maintenance
Oct 7, 2026 · Apt BLDG
Open
Show 40 more ↓
- Unsanitary condition
Garbage/recycling storage
Oct 7, 2026 · Apt BLDG
Open - Unsanitary condition
Garbage/recycling storage
Oct 7, 2026 · Apt BLDG
Open - Unsanitary condition
Mold
Oct 7, 2026 · Apt 12D
Open - Unsanitary condition
Pests
Oct 7, 2026 · Apt 12D
Open - Unsanitary condition
Garbage/recycling storage
Oct 7, 2026 · Apt 3G
Open - Plumbing
Bathtub/shower
Oct 7, 2026 · Apt 3G
Open - Appliance
Refrigerator
Oct 7, 2026 · Apt 3G
Open - Unsanitary condition
Pests
Oct 7, 2026 · Apt 3G
Open - Unsanitary condition
Pests
Oct 7, 2026 · Apt 3G
Open - Paint/plaster
Wall
Oct 7, 2026 · Apt 3G
Open - Unsanitary condition
Pests
Oct 7, 2026 · Apt 3G
Open - Unsanitary condition
Pests
Oct 7, 2026 · Apt 3G
Open - Plumbing
Toilet
Oct 6, 2026 · Apt 6C
Open - Unsanitary condition
Pests
Oct 6, 2026 · Apt PUBLIC
Close - Plumbing
Bathtub/shower
Oct 6, 2026 · Apt 4N
Open - Unsanitary condition
Garbage/recycling storage
Oct 6, 2026 · Apt PUBLIC
Close - Door/window
Door
Oct 6, 2026 · Apt 6C
Open - Unsanitary condition
Pests
Oct 6, 2026 · Apt 3J
Close - Unsanitary condition
Garbage/recycling storage
Oct 5, 2026 · Apt 4N
Open - Unsanitary condition
Garbage/recycling storage
Oct 3, 2026 · Apt 8B
Open - Unsanitary condition
Pests
Oct 3, 2026 · Apt 8B
Open - Unsanitary condition
Pests
Oct 3, 2026 · Apt 8B
Open - Unsanitary condition
Garbage/recycling storage
Oct 3, 2026 · Apt BLDG
Close - Elevator
Maintenance
Oct 1, 2026 · Apt 3J
Open - Unsanitary condition
Pests
Oct 1, 2026 · Apt 3J
Open - Unsanitary condition
Garbage/recycling storage
Oct 1, 2026 · Apt 3J
Open - Elevator
Maintenance
Sep 30, 2026 · Apt 3G
Open - Unsanitary condition
Pests
Sep 30, 2026 · Apt 3G
Open - Unsanitary condition
Garbage/recycling storage
Sep 30, 2026 · Apt 3G
Open - Unsanitary condition
Garbage/recycling storage
Sep 28, 2026 · Apt BLDG
Close - Plumbing
Bathtub/shower
Sep 28, 2026 · Apt 4N
Open - Unsanitary condition
Garbage/recycling storage
Sep 25, 2026 · Apt 4N
Close - Unsanitary condition
Garbage/recycling storage
Sep 24, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 24, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 24, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 23, 2026 · Apt 9C
Close - Unsanitary condition
Pests
Sep 23, 2026 · Apt 6B
Close - Plumbing
Bathtub/shower
Sep 23, 2026 · Apt 6B
Close - General
Bell/buzzer/intercom
Sep 23, 2026 · Apt 6B
Close - Water leak
Heavy flow
Sep 23, 2026 · Apt 6B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2024
- Floors
- 12
- Residential units
- 131
- Building area
- 94,044 ft²
- Lot area
- 14,231 ft²
- Zoning
- R8
- Community board
- 205
- Council district
- 15
- Block / lot
- 3156 / 72
- Assessed value
- $7,454,700
- Landmark / historic district
- No
HPD registration #229286, last renewed May 16, 2025.
Questions about 2047 Ryer Ave
Who owns 2047 Ryer Ave?
The owner of record in NYC Department of City Planning PLUTO data is Gw Ryer LLC.
Does 2047 Ryer Ave have violations?
Yes. NYC HPD has recorded 146 housing violations at this property.
Is 2047 Ryer Ave rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2047 Ryer Ave built?
City records list 2024 as the year it was built.
How many apartments are in 2047 Ryer Ave?
It has 131 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.