roofy

254 East 184 Street

Bronx, NY 10458BBL 2-03151-0028Map

Owner of record: 254 East 184 Street HDFC

254 East 184 Street is a walk-up apartment building built in 1916 in Bronx, 10458. It has 24 residential units across 5 floors. The owner of record is 254 East 184 Street HDFC. HPD has recorded 266 housing violations here, most recently on May 20, 2026. 25 of the 50 most recent violations are still open.

HPD violations
266
DOB violations
3
ECB violations
4
HPD complaints
149

What to know

Concern
12 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 20, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 266

  • B

    Provide an unlockable slide bolt or hook at bulkhead door that allows re-entry from roof to public hallway , 5th story

    May 20, 2026

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules deffective in the entire apartment located at apt 1d, 1st story, 1st apartment from north at east

    May 20, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations deffective in the entire apartment located at apt 1d, 1st story, 1st apartment from north at east

    May 20, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroom located at apt 2e, 1st story, 1st apartment from north at east

    May 20, 2026 · Apt 2E

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinly floor tiles in the kitchen located at apt 2e, 1st story, 1st apartment from north at east

    May 20, 2026 · Apt 2E

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinly floor tiles in the foyer located at apt 2e, 1st story, 1st apartment from north at east

    May 20, 2026 · Apt 2E

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2e, 1st story, 1st apartment from north at east

    May 20, 2026 · Apt 2E

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3d, 3rd story, 2nd apartment from north at east

    May 20, 2026 · Apt 3D

    Open — Nov certified late
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at intermediate landing at public hall stair, 1st story

    May 13, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at roof door at bulkhead, 5th story

    May 13, 2026

    Open — Nov certified late
Show 40 more ↓
  • C

    Remove the illegal fastening consisting of panic bar installed at roof door that does not allow re-entry from roof to public hall at bulkhead, 5th story

    May 13, 2026

    Open — Nov sent out
  • B

    Provide an unlockable knob or slide bolt at roof door that does allow re-entry from roof to public hall at bulkhead, 5th story

    May 13, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at intermediate landing at public hall stair, 1st story

    May 13, 2026

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4d, 4th story, 2nd apartment from north at east

    Feb 18, 2026 · Apt 4D

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling and the west wall in the 5th room from north located at apt 2c, 2nd story, 1st apartment from south at west

    Sep 12, 2025 · Apt 2C

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the 4th room from north located at apt 2c, 2nd story, 1st apartment from south at west

    Sep 12, 2025 · Apt 2C

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north located at apt 2c, 2nd story, 1st apartment from south at west

    Sep 12, 2025 · Apt 2C

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and the ceilings in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west

    Sep 12, 2025 · Apt 2C

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the south wall and the ceiling in the kitchen located at apt 2c, 2nd story, 1st apartment from south at west

    Sep 12, 2025 · Apt 2C

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall and the ceiling in the kitchen located at apt 2c, 2nd story, 1st apartment from south at west

    Sep 12, 2025 · Apt 2C

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles above the sink in the kitchen located at apt 2c, 2nd story, 1st apartment from south at west

    Sep 12, 2025 · Apt 2C

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the upper and lower metal cabinets at the north wall and the south wall in the kitchen located at apt 2c, 2nd story, 1st apartment from south at west

    Sep 12, 2025 · Apt 2C

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 1b, 1st story, 2nd apartment from south at west

    Apr 25, 2025 · Apt 1B

    Open — First no access to re- inspect violation
  • B

    Abate the nuisance consisting of excessive storage of material consisting of household items in the 3rd room from north located at apt 1b, 1st story, 2nd apartment from south at west

    Apr 25, 2025 · Apt 1B

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at roof bulkhead south and west walls

    Apr 25, 2025

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at south and west walls

    Apr 25, 2025

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at south wall intermediate landing at public hall stairs, 3rd story

    Apr 25, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the south wall intermediate landing at public hall stairs, 3rd story

    Apr 25, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the south and west walls

    Apr 25, 2025

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of bicycle and stroller at public hall, 1st story

    Apr 25, 2025

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 1b, 1st story, 2nd apartment from south at west

    Apr 25, 2025 · Apt 1B

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1b, 1st story, 2nd apartment from south at west

    Apr 25, 2025 · Apt 1B

    Closed — Violation closed
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at front yard

    Mar 28, 2025

    Closed — Violation closed
  • C

    Make safe by properly repairing the structural defect horizontal cracks & backwork 8th window from east at north exterior wall, 4th story (building front)

    Feb 8, 2024

    Closed — Violation closed
  • B

    Make safe by properly repairing the structural defect vertical & horizontal cracks at 8th, 9th and 10th window from east at north exterior wall, 4th story (building front)

    Feb 8, 2024

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective exposed (lintel) at 11th window from east at (building north exterior wall, 2nd story) e 184th st.

    Feb 8, 2024

    Open — Not complied with
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. 3wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    May 5, 2022 · Apt 1A

    Open — First no access to re- inspect violation
  • B

    Trace and repair the source and abate the visible mold condition... approximately 2 sq. ft. at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from south at west original violation 14830280 issued 10-feb-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Feb 10, 2022 · Apt 1A

    Closed — Violation dismissed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1a, 1st story, 1st apartment from south at west

    Feb 10, 2022 · Apt 1A

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... approximately 2 sq. ft. at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from south at west

    Feb 10, 2022 · Apt 1A

    Closed — Violation closed
  • C

    Code: arrange and make self-closing the doors ... in the entrance located at apt 1a, 1st story, 1st apartment from south at west

    Feb 10, 2022 · Apt 1A

    Closed — Violation closed
  • A

    Cleanse to the satisfaction of this department the mold at grout around the bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from south at west

    Feb 10, 2022 · Apt 1A

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, south wall, 1st window frame from north at east wall in the 2nd room from east at south located at apt 1a, 1st story, 1st apartment from south at west

    Feb 10, 2022 · Apt 1A

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective rusted metal base cabinet at sink in the kitchen located at apt 1a, 1st story, 1st apartment from south at west

    Feb 10, 2022 · Apt 1A

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall in the 3rd room from east at north located at apt 1a, 1st story, 1st apartment from south at west

    Feb 10, 2022 · Apt 1A

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 1st door frame from north at east wall, 1st riser from east at south wall, east wall, west wall, 1st window frame from south at west wall in the 3rd room from east at north located at apt 1a, 1st story, 1st apartment from south at west

    Feb 10, 2022 · Apt 1A

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the foyer located at apt 1a, 1st story, 1st apartment from south at west

    Feb 10, 2022 · Apt 1A

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 1st door frame from north at east wall in the foyer located at apt 1a, 1st story, 1st apartment from south at west

    Feb 10, 2022 · Apt 1A

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st medicine cabinet from south at west wall, chair rails at east wall, chair rails at west wall, 1st riser from east at south wall, south wall, east wall, west wall in the bathroom located at apt 1a, 1st story, 1st apartment from south at west

    Feb 10, 2022 · Apt 1A

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall in the 3rd room from east at south located at apt 1a, 1st story, 1st apartment from south at west

    Feb 10, 2022 · Apt 1A

    Open — First no access to re- inspect violation

DOB building violations · 3

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 17, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed

ECB violations · 4

  • Class - 2

    At time of inspection of a 5-story building, i observed sidewalk shed erected around during my inspection i noticed sidewalk shed has no contact information panel. this create a hazardous situation for first re

    Oct 8, 2025 · Penalty $6,250

    Active
  • Class - 2

    At time of inspection of a 5-story occupied building sidewalk shed erected around building upon review dob now and bis system permit expired since 12/06/2024 and has not renew as per code required.permit numbe

    Oct 8, 2025 · Penalty $6,250

    Active
  • Class - 1

    At time of inspection observed exterior brick facade wall instate of disrepair conditions with horizontal cracks above 3rd, 4th & 5th floor window lines on exposure # 01. also observed a vertical cracks on fron

    Feb 9, 2024 · Penalty $1,250

    Active
  • Class - 2

    Failure to maintain bldg in code compliant manner. observed: apt #3d has walls in the hallway buldging out also bathroom ceiling & walls arebuldging out & the living room ceiling plaster is falling down a 2'x3'

    Jan 4, 2017 · Penalty $250

    Active

Complaints

  • Safety

    Smoke detector

    Jun 25, 2026 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Dec 13, 2025 · Apt 1D

    Close
  • Heat/hot water

    Apartment only

    Jan 22, 2025 · Apt 1D

    Close
  • Heat/hot water

    Apartment only

    May 13, 2024 · Apt 1D

    Close
  • Electric

    Power outage

    Feb 8, 2024 · Apt 3D

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 6, 2022 · Apt BLDG

    Close
  • Plumbing

    Basin/sink

    Apr 28, 2022 · Apt 1A

    Close
  • Paint/plaster

    Wall

    Apr 28, 2022 · Apt 1A

    Close
  • Plumbing

    Radiator

    Apr 28, 2022 · Apt 1A

    Close
  • Paint/plaster

    Wall

    Apr 28, 2022 · Apt 1A

    Close
Show 40 more ↓
  • Paint/plaster

    Wall

    Apr 28, 2022 · Apt 1A

    Close
  • General

    Cabinet

    Apr 28, 2022 · Apt 1A

    Close
  • Paint/plaster

    Wall

    Jan 25, 2022 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Nov 7, 2019 · Apt 3E

    Close
  • Heat/hot water

    Apartment only

    Nov 4, 2019 · Apt 3E

    Close
  • Heat/hot water

    Apartment only

    Nov 3, 2019 · Apt 1D

    Close
  • Electric

    Power outage

    Jul 17, 2019 · Apt 2E

    Close
  • Paint/plaster

    Ceiling

    Dec 17, 2018 · Apt 3E

    Close
  • Unsanitary condition

    Mold

    Dec 17, 2018 · Apt 3E

    Close
  • Paint/plaster

    Ceiling

    Dec 17, 2018 · Apt 3E

    Close
  • Paint/plaster

    Ceiling

    Dec 17, 2018 · Apt 3E

    Close
  • Water leak

    Damp spot

    Dec 17, 2018 · Apt 3E

    Close
  • Paint/plaster

    Ceiling

    Dec 17, 2018 · Apt 3E

    Close
  • Electric

    Outlet/switch

    Dec 17, 2018 · Apt 3E

    Close
  • General

    Cabinet

    Dec 17, 2018 · Apt 3E

    Close
  • Unsanitary condition

    Pests

    Dec 17, 2018 · Apt 3E

    Close
  • Water leak

    Heavy flow

    Dec 17, 2018 · Apt 3E

    Close
  • Paint/plaster

    Wall

    Oct 16, 2018 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Mar 1, 2017 · Apt 4E

    Close
  • Paint/plaster

    Wall

    Mar 18, 2016 · Apt 4A

    Close
  • Paint/plaster

    Wall

    Mar 18, 2016 · Apt 4A

    Close
  • Paint/plaster

    Wall

    Mar 18, 2016 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Feb 22, 2016 · Apt 2C

    Close
  • Heat/hot water

    Apartment only

    Feb 19, 2016 · Apt 2C

    Close
  • Heat/hot water

    Apartment only

    Jan 8, 2015 · Apt 1D

    Close
  • Heat/hot water

    Entire building

    Dec 14, 2014 · Apt 1C

    Close
  • General

    Cabinet

    Aug 27, 2013 · Apt 3A

    Close
  • Plumbing

    Basin/sink

    Aug 27, 2013 · Apt 3A

    Close
  • General

    Ceramic-tile

    Aug 27, 2013 · Apt 3A

    Close
  • General

    Cabinet

    Aug 27, 2013 · Apt 3A

    Close
  • Plumbing

    Bathtub/shower

    Aug 27, 2013 · Apt 3A

    Close
  • Plumbing

    Water supply

    Aug 27, 2013 · Apt 3A

    Close
  • General

    Floor

    Aug 27, 2013 · Apt 3A

    Close
  • General

    Floor

    Aug 27, 2013 · Apt 3A

    Close
  • General

    Doors

    Aug 27, 2013 · Apt 3A

    Close
  • Plumbing

    Basin/sink

    Aug 27, 2013 · Apt 3A

    Close
  • Plumbing

    Basin/sink

    Aug 27, 2013 · Apt 3A

    Close
  • General

    Floor

    Aug 27, 2013 · Apt 3A

    Close
  • Paint/plaster

    Ceiling

    Aug 27, 2013 · Apt 3A

    Close
  • Paint/plaster

    Wall

    Aug 27, 2013 · Apt 3A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C6)
Year built
1916
Floors
5
Residential units
24
Building area
20,955 ft²
Lot area
5,184 ft²
Zoning
R8
Community board
205
Council district
15
Block / lot
3151 / 28
Assessed value
$518,400
Landmark / historic district
No

HPD registration #203152, last renewed Aug 11, 2025.

Questions about 254 East 184 Street

Who owns 254 East 184 Street?

The owner of record in NYC Department of City Planning PLUTO data is 254 East 184 Street HDFC.

Does 254 East 184 Street have violations?

Yes. NYC HPD has recorded 266 housing violations at this property.

Is 254 East 184 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 254 East 184 Street built?

City records list 1916 as the year it was built.

How many apartments are in 254 East 184 Street?

It has 24 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.