260 East 188 Street
Bronx, NY 10458BBL 2-03147-0050Map
Owner of record: St. Barnabas Hosital
260 East 188 Street is a hospital / health built in 1922 in Bronx, 10458. The owner of record is St. Barnabas Hosital. HPD has recorded 1 housing violation here, most recently on January 11, 2018.
- HPD violations
- 1
- DOB violations
- 68
- ECB violations
- 21
- HPD complaints
- 28
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- BHazardous
Properly repair with similar material the broken or defective terracotta floor tiles at building entrance door
Jan 11, 2018
Closed — Violation dismissed
DOB building violations · 68
- Construction other optional
Emergency work order: as noted at time of inspection an active occupie d parking structure consisting of 4 levels, observed cracked,spalled c oncrete-rusted metal causing immediate hazard to vehicular and pedestr ian traffic. remendy:owner to retain qpsi to direct and supervise the immediate installation of safety measures at unsade areas and provide
Oct 9, 2026
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 8, 2025
Dob violation - active - Construction other optional
Missng/damagd expansn joint btwen frnt&rear sectns,waterleak by expnsn jnt,rustd steel framng,minor2moderate spallng conc deck surface,rusted rebar,clogd watr drains,holes,cracks on parkng deck. remedy:retain lic rdp 2 evaluate entire bldg,file repair drwgs 2 correct stucture,file4 wrk permit by 7/28,start wrk by 8/25/23
May 24, 2023
Dob violation - dismissed - Construction other optional
The occupied parking structure with conc. framing observed to be in the state of disrepair. cracks, conc. spalling & exposed steel reinf. observed on conc. beams/slabs @ various lvls/locations. water damage observed on the underside of slabs @ various drain locations.
Apr 26, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 16, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 27, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 15, 2021
Dob violation - dismissed - Construction other optional
Ftm bldg safe condn-approx 40'x25' underside of basement concrete slab dlaminated/spalled w/expsd&corrod rbar.1fl ramp dlamnatd undersid slab apprx 10'x10'fndtn wall w/expsd rbar.roof prkg w/crcks,exposd rebar&no apprx 10'x10'fndtn wall w/expsd rbar.roof prkg w/crcks,exposd rebar&no steel ovr openg.ownr-rtain nyspe-evalu entire structr&prepr/file rpair
Jul 8, 2021
Dob violation - dismissed
Show 40 more ↓
- Construction other optional
Observed spalling concrete along with rotted i beams and rebar through out
Jun 27, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 5, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 5, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 26, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 26, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 13, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 13, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 8, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 8, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 18, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 8, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 31, 2014
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2013
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 28, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 13, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 13, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 15, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 15, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 29, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 2, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 2, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 15, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 15, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2005
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 2005
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Nov 19, 2004
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 21, 2004
Dob violation - dismissed - Elevator elevatorrequired
2p2268
Aug 7, 2002
Dob violation - resolved - Elevator elevatorrequired
2p3967
Aug 7, 2002
Dob violation - resolved
ECB violations · 21
- Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure documenting the conditions of psid#x0000432 by the august 1,2024 deadline.to date,the department has
Oct 1, 2024 · Penalty $2,500
Resolve - Class - 1
Failure to comply with the commissioner's order in dob violation vio23-01261, dated 4/26/2023. respondent was required to submit an engineer's report concerning structurally deficient conditions. as of 10/11/20
Oct 11, 2023 · Penalty $2,500
Resolve - Class - 2
Observed at cellar, exit signs defective, open drainpipes leaking, water damage under concrete slabs, ceiling with spalling concrete, rusted structural beams missing fire spray, above ramp to 1st floor several
Apr 26, 2023 · Penalty $310
Resolve - Class - 1
Failure to maintain building in code compliant manner.note:basement parking garage ceiling has several areas of spalling concrete with exposed rebar.remedy:repair and/or replace.
Oct 28, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation #35582595z issued 8/5/21 and to file certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain building in co
Sep 23, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to maintain bldg in codecompliant manner note in bsmt of parking garage ceiling has several areas where concretes spalling&fallen tofl.spalling areas expose rebar&qdecking repair &/or replace
Aug 5, 2021 · Penalty $3,125
Resolve - Class - 1
Failure to maintain bldg in codecompliant manner.noted:due to water infiltration rebar,qdeck rotting causing spalling of fireproofing,concrete in several locations thruout ramps@bsmt to cellar level creating ha
Jun 27, 2021 · Penalty $6,250
Resolve - Class - 1
Door restrictor missing. cease used. provide. re-inspection required. brake tag in machine room missing. provide.
Mar 25, 2021 · Penalty $1,280
Resolve - Class - 2
Failure to file annual certification that cooling tower 1000000907 hasbeen inspected,tested,and disinfected and that a maintenance plan has been devloped and implemented,by november,1,2016.rem:file annual certi
Jun 20, 2017 · Penalty $1,000
Active - Class - 2
59m07,98m07,56m07. 59m07-provide missing 1 year brake test tag. 98m07-provide missing 5 year test tag. 56m07-provide hoist rope covers.
Mar 23, 2016 · Penalty $500
Resolve
Show 11 more ↓
- Class - 2
02x07,64m07. 02x07-provide phone service. 64m07-provide hoist machine device #.
Mar 23, 2016 · Penalty $250
Resolve - Class - 2
28-bb-5,99-bb-5,59-t-15,68-b-7
Feb 24, 2016 · Penalty $250
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. cracks/missing/displaced fire protective coating on steel support beams & columns. at various locations throughout. steel i beams missing fire proof coating.
Jan 15, 2014
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner noted: grating on sidewalk which belongs to ventilation well approx 10'deep has collapsed.ert ws told said grating collapsed injuring pedestrian.rmdy:make area
Dec 29, 2012 · Penalty $1,000
Resolve - Class - 2
10b07,67x10,71x10,71q03: 10b7;provide a second gibb for car door code requires 2 gibbs for each door panel. 67x10;repair communication in car telephone.
Jan 9, 2012 · Penalty $500
Resolve - Class - 2
Failure to maintain bldg in code complaint manner noted fire proofing is missing around i beam at cellar level on the south side of the parking garage.remedy repair and or replace fire proofing
Dec 1, 2009 · Penalty $500
Active - Class - 2
03m11.67x10.69m7.70o2.71x10.71q3.81m7.03m11 replace missing handrail in cab 67x10 repair communication in car telephone
Jul 22, 2009
Resolve - Non-hazardous
03x1003m1134q0340t0771q03. 03x10 repair communication in car (telephone) 03m11 replace handrail in car 34q03 install box cover for electrical box in motor room 71q03 install cover for electrical box under car.
May 27, 2008 · Penalty $350
Resolve - Non-hazardous
Failure to maintain bldg. concrete slab @ upper level & ramp has exposed rebar & areas of missing, loose, cracked concrete (at various areas) remedy: maintain building and make all necessary repairs.
Feb 1, 2008 · Penalty $180
Active - Hazardous
No permit for sidewalk chute. noted:sidewalk chute located northeast section of bldg remedy:obtain permit
May 21, 2001
Resolve - Non-hazardous
No permit for sidewalk chute. located northeast section of bldg. correction:obtain permit for sidewalk chute.
Jul 26, 2000 · Penalty $2,500
Resolve
Complaints
- Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2024 · Apt BLDG
Close
Show 18 more ↓
- Heat/hot water
Entire building
Jan 9, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 21, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 19, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 4, 2022 · Apt BLDG
Close - Water leak
Heavy flow
Oct 9, 2021 · Apt K
Close - Unsanitary condition
Pests
Sep 5, 2018 · Apt 4D
Close - Water leak
Slow leak
Sep 5, 2018 · Apt 4D
Close - Water leak
Slow leak
Sep 5, 2018 · Apt 4D
Close - Plumbing
Basin/sink
Sep 5, 2018 · Apt 4D
Close - Heat/hot water
Apartment only
Jan 3, 2018 · Apt 5FL
Close - Heat/hot water
Entire building
Mar 15, 2017 · Apt BLDG
Close - Heating
Heat related
Nov 29, 2013 · Apt NA
Close - Plumbing
Water-leaks
May 16, 2013 · Apt 1D
Close - Plumbing
Water-leaks
May 16, 2013 · Apt 1D
Close - General
Mold
May 16, 2013 · Apt 1D
Close - Paint/plaster
Ceiling
May 16, 2013 · Apt 1D
Close - Electric
Lighting
May 16, 2013 · Apt 1D
Close - Heating
Heat related
Jan 28, 2005 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hospital / health (I1)
- Year built
- 1922
- Floors
- 5
- Residential units
- —
- Building area
- 204,433 ft²
- Lot area
- 55,284 ft²
- Zoning
- R7-1
- Community board
- 205
- Council district
- 15
- Block / lot
- 3147 / 50
- Assessed value
- $19,911,600
- Landmark / historic district
- No
Questions about 260 East 188 Street
Who owns 260 East 188 Street?
The owner of record in NYC Department of City Planning PLUTO data is St. Barnabas Hosital.
Does 260 East 188 Street have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 260 East 188 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 260 East 188 Street built?
City records list 1922 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.