999 East 180 Street
Bronx, NY 10460BBL 2-03138-0001Map
Owner of record: Boston Tremont Housing Dev. Fund Corpora Tion
999 East 180 Street is an elevator apartment building built in 1974 in Bronx, 10460. It has 237 residential units across 6 floors. The owner of record is Boston Tremont Housing Dev. Fund Corpora Tion. HPD has recorded 634 housing violations here, most recently on June 3, 2026. 50 of the 50 most recent violations are still open.
- HPD violations
- 634
- DOB violations
- 108
- ECB violations
- 52
- HPD complaints
- 1,492
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 634
- BHazardous
Provide heavy duty lock and latch set at the building entrance door at public hall, 1st story
Jun 3, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective (door) from vestibule to public hall at public hall, 1st story
Jun 3, 2026
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at entrance door from street to vestibule at public hall, 1st story
Jun 3, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing signage at public hall, 1st story
Jun 3, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at public hall, 1st story
Jun 3, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling in the kitchen located at apt 4a lower level, 4th story, 4th apartment from west at north , section ''1016''
May 25, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq.ft. at ceiling and all walls at closet in the private hallway located at apt 4a upper level, 4th story, 4th apartment from west at north , section ''1016''
May 25, 2026 · Apt 4A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective latch set and assemblies at door (from vestibule to public hall) at section ''1013'' , 2nd story
May 25, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door (from vestibule to public hall) at section ''1013'' , 2nd story
May 25, 2026
Open — Nov sent out - BHazardous
Provide approved glass at building entrance door (from courtyard to vestibule) at section ''1013'' , 2nd story
May 25, 2026
Open — Nov sent out
Show 40 more ↓
- BHazardous
M/d law abate the nuisance consisting of plexiglass installed at building entrance door (from courtyard to vestibule) at section ''1013'' , 2nd story
May 25, 2026
Open — Nov sent out - BHazardous
Provide approved glass at sidelights at vestibule at section ''1016'' , 1st story
May 25, 2026
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of plexiglass installed at sidelights at vestibule at section ''1016'' , 1st story
May 25, 2026
Open — Nov sent out - BHazardous
Provide approved glass at building entrance door (from courtyard to vestibule) at section ''1016'' , 1st story
May 25, 2026
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of plexiglass installed at building entrance door (from courtyard to vestibule) at section ''1016'' , 1st story
May 25, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door (from courtyard to vestibule) at section ''1016'' , 1st story
May 25, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4a, 4th story, 4th apartment from west at north , section ''1016''
May 25, 2026 · Apt 4A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4a, 4th story, 4th apartment from west at north , section ''1016''
May 25, 2026 · Apt 4A
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 4a lower level, 4th story, 4th apartment from west at north , section ''1016''
May 25, 2026 · Apt 4A
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of broken and cracked vinyl floor tiles creating trip hazard in the kitchen located at apt 4a lower level, 4th story, 4th apartment from west at north , section ''1016''
May 25, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchen located at apt 4a lower level, 4th story, 4th apartment from west at north , section ''1016''
May 25, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Provide approved glass at sidelights at vestibule at section ''1013'' , 2nd story
May 25, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 4a lower level, 4th story, 4th apartment from west at north , section ''1016''
May 25, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling in the foyer located at apt 4a lower level, 4th story, 4th apartment from west at north , section ''1016''
May 25, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Replace with new the missing doorknob at entrance in the bathroom located at apt 4a upper level, 4th story, 4th apartment from west at north , section ''1016''
May 25, 2026 · Apt 4A
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of broken and missing vinyl floor tiles creating trip hazard in the private hallway located at apt 4a upper level, 4th story, 4th apartment from west at north , section ''1016''
May 25, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the private hallway located at apt 4a upper level, 4th story, 4th apartment from west at north , section ''1016''
May 25, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling in the private hallway located at apt 4a upper level, 4th story, 4th apartment from west at north , section ''1016''
May 25, 2026 · Apt 4A
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of broken and missing vinyl floor tiles creating trip hazard in the 2nd room from east at north located at apt 4a upper level, 4th story, 4th apartment from west at north , section ''1016''
May 25, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at north located at apt 4a upper level, 4th story, 4th apartment from west at north , section ''1016''
May 25, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling in the 2nd room from east at north located at apt 4a upper level, 4th story, 4th apartment from west at north , section ''1016''
May 25, 2026 · Apt 4A
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of plexiglass installed at sidelights at vestibule at section ''1013'' , 2nd story
May 25, 2026
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 5l, 5th story, 30th apartment from east at south
May 14, 2026 · Apt 5L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from north located at apt 5l, 5th story, 30th apartment from east at south
May 14, 2026 · Apt 5L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective aeorater at sink in the bathroom located at apt 5l, 5th story, 30th apartment from east at south
May 14, 2026 · Apt 5L
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5l, 5th story, 30th apartment from east at south
May 14, 2026 · Apt 5L
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5l, 5th story, 30th apartment from east at south
May 14, 2026 · Apt 5L
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door used as second means of egress in the 2nd room from north located at apt 5l, 5th story, 30th apartment from east at south
May 14, 2026 · Apt 5L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5l, 5th story, 30th apartment from east at south
May 14, 2026 · Apt 5L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wood floor in the 2nd room from north located at apt 5l, 5th story, 30th apartment from east at south
May 14, 2026 · Apt 5L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 5l, 5th story, 30th apartment from east at south
May 14, 2026 · Apt 5L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective window sash lock in the 1st room from north located at apt 5l, 5th story, 30th apartment from east at south
May 14, 2026 · Apt 5L
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set and assemblies at vestibule door , 1st story, section ''1013''
Mar 11, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door , 1st story, section ''1013''
Mar 11, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [latch set] vestibule door at public hall, 3rd story
Jan 17, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective latch set and its assemblys at vestibule door at public hall, 3rd story
Jan 17, 2026
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 6a, 5th story, 4th apartment from south at west
Jul 11, 2025 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective connection wasteline under was basin in the bathroom located at apt 6a, 5th story, 4th apartment from south at west
Jul 11, 2025 · Apt 6A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ruber gasket around refrigirator doors in the kitchen located at apt 6a, 5th story, 4th apartment from south at west
Jul 11, 2025 · Apt 6A
Open — Nov sent out
DOB building violations · 108
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 3, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2017
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 21, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 21, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 21, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2016
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 24, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 20, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 20, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 20, 2015
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 20, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2014
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 5, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 4, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 4, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 4, 2013
Dob violation - resolved - Facade facade optional
Cycle 7 unsafe report filed
Feb 19, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Feb 19, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 9, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 9, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 9, 2011
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 28, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 28, 2008
Dob violation - resolved
ECB violations · 52
- Class - 2
Class 2 violation issued items are / device piston seal leaking, remedy; repair / dirty pit ,remedy;clean, / car floor to hoist way landing not level, remedy; adjust, / no access in motor room. remedy, provide
Apr 27, 2022 · Penalty $625
Resolve - Class - 1
Out ofservice, return to service
Mar 16, 2022 · Penalty $1,280
Resolve - Class - 2
Phone not working, provide keys to motor room
Jan 31, 2022 · Penalty $310
Resolve - Class - 2
Failure to submit an acceptable required cycle 8b report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control#808006. agg1: prior nov#37013396z under
Jun 1, 2021 · Penalty $5,000
Resolve - Class - 2
Failure to submit an acceptable required cycle 8b report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control#808005. agg1: prior nov#37013411h under
Jun 1, 2021 · Penalty $1,250
Active - Class - 2
Bc3314.3.3 failure to provide design drawings & have on site as per code on site as per code.at time of inspection on an active 6 story alt facade restoration notice c-hook,suspended scaffold & all rigging at
Mar 16, 2021 · Penalty $1,280
Resolve - Class - 1
Failure to perform inspection prior to the installation of suspended scaffold as per code.at time of inspection on an active 6 story alt facade restoration.notice c-hook,suspended scaffold & alt its rigging at
Mar 16, 2021 · Penalty $10,030
Resolve - Class - 2
Failure to maintain/display on site documents required by chapter 33. at time of inspection on an active facade restoration 6 story notice at locations around the bldg a sidewalk/pedestrian shed,the shed at ti
Mar 16, 2021 · Penalty $1,280
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35319265h issued on 7/9/2018 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01(d)(2).
Jun 29, 2020 · Penalty $1,280
Resolve - Class - 2
Failure to submit a required cycle 8b reprot of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #808005. rmdy: submit required technical report.
Oct 15, 2018 · Penalty $1,280
Active
Show 40 more ↓
- Class - 2
Failure to submit a required cycle 8b reprot of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #808006. rmdy: submit required technical report.
Oct 15, 2018 · Penalty $1,280
Resolve - Class - 2
Failure to comply with the commissioners order containted in summons/ violation #32092093h issued on 12/18/17 and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01 (d)(2).an acceptable
Oct 4, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioners order containted in summons/ violation #32092094j issued on 12/18/17 and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01 (d)(2).an acceptable
Oct 4, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioners order containted in summons/ violation #32092092x issued on 12/18/17 and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01 (d)(2).an acceptable
Oct 4, 2018 · Penalty $1,250
Resolve - Class - 1
97x17. only elevator in section of bldg out of service as per 1rcny 11-02. rem: restore to service immediately & notify nyc dob the device has been return to service call 212-393-2435. notify nyc dob the device
Jul 29, 2018 · Penalty $1,250
Resolve - Class - 1
Failure to maintain exterior bldg facade and appurtenances. *west elevation exposure 2, observed cracked/spalled and loose masonry facade atbalcony on 2nd floor; deteriorated steel frame at balconies on various
Jul 9, 2018 · Penalty $2,500
Resolve - Class - 2
36)as per class 254-36 boiler not register as per dob records.
Dec 18, 2017 · Penalty $500
Active - Class - 2
36)as per class 254-36 boiler not registered, as per dob records.
Dec 18, 2017 · Penalty $500
Active - Class - 2
36)as per class 254-36 boiler not registered as per dob records.
Dec 18, 2017 · Penalty $500
Active - Class - 2
97x17)the only elevator in building out of service. upon inspection the device is found to be out of service creating a hazardous condition as per 1rcny-11-02 restore to service immediately and notify nycdob th
Sep 21, 2017 · Penalty $250
Resolve - Class - 1
97x10 class 1 violation issued for failure to maintain building in code compliant manner as per bc3001.2, 27-987.dob records show device as active but upon inspection elevator was found to be out of service cre
May 25, 2016 · Penalty $1,000
Resolve - Class - 2
29r05,31r05,39r05. work w/out a permit. port number (29)door operator (31)leveling unit (39)insp box & part was installed w/out permit being obtained & application being filed. rem: file application & obtain pe
May 25, 2016 · Penalty $800
Resolve - Class - 2
97x10 upon inspection device was found to be out of service. dob records show device 2p4572 as active. restore device to service immediately
May 13, 2016 · Penalty $500
Resolve - Class - 1
97x10,97x10-restore entire device back to service.
Aug 22, 2014 · Penalty $5,000
Resolve - Class - 2
08v10-elevator rewiring floor stops 57-restore emergency communication
Aug 12, 2013
Resolve - Class - 2
67x10,08v10 67-restore emergency communication in elevator to an outside office 08-elevator
Aug 12, 2013
Resolve - Class - 2
08v10,07y10,08n10 07-restore communication to elev cab.
Aug 12, 2013
Resolve - Class - 1
Failure to provide safety measures such as sidewalk shed,fence,etc.to protect public from unsafe conditions as per 1rcny 103-04 and as per notification of unsafe conditions complaint #2182125 by ra/pe on 2/12/1
Mar 13, 2013 · Penalty $2,400
Active - Class - 1
Failure to provide safety measures such as sidewalk shed,fence etc to protect public from unsafe conditions as per 1rcny103-04 and as per notification of unsafe conditions complaint #2182127 by ra/pe on 2-12-13
Mar 5, 2013
Resolve - Class - 1
28-116.4.1: 16r11,97r07: 97r07;operating device without a cert of compiance. no report of inspection submitted to dob & no witnessing of test by dob. rem:contact [email protected] to schedule test appoin
May 8, 2012 · Penalty $1,600
Resolve - Class - 2
24x10,70y10,70o02: 24-car position indicator in elev cab & hall positon indicator in operative. 70-repair oil leak, remove oil & clean pit
Nov 29, 2011 · Penalty $250
Resolve - Class - 2
14m10,100l10,08v10: 100-l-10-repair reconnect sump pump inpit. 08-v-1 0-elevator releveling all down directional floor stops.
Nov 28, 2011 · Penalty $250
Resolve - Class - 2
100x10,24x10,70y10,70o02: 100-restore emergency communication phone inelevator cab. 24-position indicator in elev cab & hall indicator posi tion in operative. 70-clean oil & repair oil leak,clean pit.
Nov 28, 2011 · Penalty $250
Resolve - Class - 1
97-x-10/97-only elevator in bldg is out-of service,temporary creating conditions dangerous to human life
Oct 26, 2010 · Penalty $1,000
Resolve - Class - 2
100u05, 70o02. 100u05- current 2yr pressure test. 70- clean oil dirt.
Jan 6, 2009
Resolve - Non-hazardous
17h11,16i11. 17-1fl door gibs. 16-4fl door closer.
Sep 11, 2007 · Penalty $180
Resolve - Non-hazardous
17h11,83o02,84x10.17-gibbs on 2,3,5fl.84-car communication
Sep 11, 2007 · Penalty $180
Resolve - Hazardous
Failure to maintain. defect is:roof membrain has failed at various locations causing sheeting to rot and sag. remedy:immediately repair defects,obtain necessary permits, submit an engineers report atesting to
Mar 17, 2003 · Penalty $800
Resolve - Hazardous
Failure to maintain ;defects are:the patched roof membrain has failed causing the sheeting to rot & loose.structual intergrity throught many areas.the roof cannot support the horizontal load causing a hazardous
Dec 12, 2002 · Penalty $800
Resolve - Hazardous
Failure to maintain;defects are.the patched roof membrain has failed causing the sheeting to rot & lose structual intergrity throught many areas the roof cannot support the horizontal load causing a hazardous
Dec 12, 2002 · Penalty $800
Resolve - Hazardous
Failure to maintain;defects are;the patches roof membrain has failed causing the sheeting to rot & lose strutural intergrity throught many areas the roof cannot support the horizontal load causing a hazardous
Dec 12, 2002
Resolve - Hazardous
Failure to maintain.defects are;the patched roof membrain has failed causing the sheeting to rot & lose structual integrity throught many areas the roof cannot support the horizontal load causing a hazardous
Dec 12, 2002 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior building noted: plywood under roof is rotten and defective in various locations location: main roof 6 fl. remedy: make all necessary repairs and make safe to public.
Dec 11, 2001 · Penalty $10,000
Resolve - Hazardous
Failure to maintain exterior.defect is:plywood under roof is rotted and defective.in various location.location:main roof 6th floor.remedy:make all necessary repairs
Oct 12, 2001 · Penalty $2,000
Resolve - Hazardous
Failure to maintain exterior defect is:plywood under roof is rotted and defective in various location.location:main roof 6th floor.remedy:make all necessary repair
Jul 12, 2001 · Penalty $800
Resolve - Non-hazardous
43y14,31d6,30o2,57o2. 31- exposed wire on motor room provide cover.
Jun 16, 2000 · Penalty $350
Resolve - Non-hazardous
57o2,13m7,14m7,43y14,36u16,30o2. 18- provide glass for frame. 35- clean oil on motor room floor. 36- provide used for motor room door.
Jun 16, 2000 · Penalty $350
Resolve - Non-hazardous
43y14,57y9,35a9,74y14,57o2. 33- patch hole on motor room wall by di of work.79-seal jack in pit off moto room floor.
Jun 16, 2000 · Penalty $350
Resolve - Non-hazardous
9h12,57o2,43y14,43m7,37d6,30o2,18m7. -43 provide cover on motor expos-ed wire, -37 secure wire under controller, -18 interlock cover replacewhere needed.
Jun 17, 1999 · Penalty $2,500
Resolve - Non-hazardous
43y14,43m7,37d6,57o2,9h12,30o2,18m7,5b1,5b12. -5 adjust car bayonnet on car clucth and shaftway door roller, -43 provide cover on motor exposed wires, -37 secure wires under controller, -18 interlock cover
Jun 17, 1999 · Penalty $2,500
Resolve
Complaints
- Flooring/stairs
Floor
Jul 1, 2026 · Apt 1I
Close - Unsanitary condition
Mold
Jul 1, 2026 · Apt 1I
Close - Electric
Power outage
Jun 2, 2026 · Apt 4J
Close - Electric
Power outage
Jun 2, 2026 · Apt BLDG
Close - Electric
Power outage
Jun 2, 2026 · Apt 4E
Close - Unsanitary condition
Mold
May 13, 2026 · Apt 4A
Close - Heat/hot water
Entire building
May 11, 2026 · Apt 5L
Close - Plumbing
Bathtub/shower
May 11, 2026 · Apt 5L
Close - Unsanitary condition
Pests
May 11, 2026 · Apt 5L
Close - Unsanitary condition
Pests
May 11, 2026 · Apt 5L
Close
Show 40 more ↓
- Door/window
Door
May 11, 2026 · Apt 5L
Close - Paint/plaster
Ceiling
May 11, 2026 · Apt 5L
Close - Flooring/stairs
Floor
May 11, 2026 · Apt 5L
Close - Door/window
Window frame
May 11, 2026 · Apt 5L
Close - Unsanitary condition
Sewage
May 5, 2026 · Apt 4A
Close - Unsanitary condition
Sewage
May 5, 2026 · Apt 4A
Close - Heat/hot water
Entire building
Apr 29, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Feb 25, 2026 · Apt 600
Close - Heat/hot water
Apartment only
Feb 3, 2026 · Apt 6N
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 17, 2026 · Apt 2N
Close - Heat/hot water
Entire building
Jan 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2026 · Apt 3L
Close - Heat/hot water
Apartment only
Jan 15, 2026 · Apt 5L
Close - Heat/hot water
Apartment only
Jan 15, 2026 · Apt 600
Close - Heat/hot water
Entire building
Oct 23, 2025 · Apt 6D
Close - Heat/hot water
Apartment only
Oct 23, 2025 · Apt B3
Close - Plumbing
Sewer
Aug 14, 2025 · Apt 1I
Close - Water leak
Slow leak
Aug 14, 2025 · Apt 1I
Close - Door/window
Door
Jul 9, 2025 · Apt 6A
Close - Door/window
Door
Jul 9, 2025 · Apt 6A
Close - Door/window
Door
Jul 9, 2025 · Apt 6A
Close - Appliance
Refrigerator
Jul 9, 2025 · Apt 6A
Close - Plumbing
Basin/sink
Jul 9, 2025 · Apt 6A
Close - Plumbing
Basin/sink
Jul 9, 2025 · Apt 6A
Close - Water leak
Heavy flow
Jul 9, 2025 · Apt 6A
Close - Heat/hot water
Apartment only
Apr 4, 2025 · Apt B3
Close - Heat/hot water
Apartment only
Mar 29, 2025 · Apt B3
Close - General
Signage missing
Mar 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 12, 2025 · Apt 6I
Close - Heat/hot water
Entire building
Mar 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 10, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 9, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 21, 2025 · Apt B3
Close - Heat/hot water
Apartment only
Feb 21, 2025 · Apt B3
Close - Heat/hot water
Apartment only
Feb 18, 2025 · Apt B3
Close - Heat/hot water
Apartment only
Feb 16, 2025 · Apt B3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1974
- Floors
- 6
- Residential units
- 237
- Building area
- 276,135 ft²
- Lot area
- 126,394 ft²
- Zoning
- R8
- Community board
- 206
- Council district
- 15
- Block / lot
- 3138 / 1
- Assessed value
- $8,388,450
- Landmark / historic district
- No
HPD registration #221874, last renewed Mar 26, 2026.
Questions about 999 East 180 Street
Who owns 999 East 180 Street?
The owner of record in NYC Department of City Planning PLUTO data is Boston Tremont Housing Dev. Fund Corpora Tion.
Does 999 East 180 Street have violations?
Yes. NYC HPD has recorded 634 housing violations at this property.
Is 999 East 180 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 999 East 180 Street built?
City records list 1974 as the year it was built.
How many apartments are in 999 East 180 Street?
It has 237 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.