roofy

999 East 180 Street

Bronx, NY 10460BBL 2-03138-0001Map

Owner of record: Boston Tremont Housing Dev. Fund Corpora Tion

999 East 180 Street is an elevator apartment building built in 1974 in Bronx, 10460. It has 237 residential units across 6 floors. The owner of record is Boston Tremont Housing Dev. Fund Corpora Tion. HPD has recorded 634 housing violations here, most recently on June 3, 2026. 50 of the 50 most recent violations are still open.

HPD violations
634
DOB violations
108
ECB violations
52
HPD complaints
1,492

What to know

Concern
13 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jun 3, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 634

  • B

    Provide heavy duty lock and latch set at the building entrance door at public hall, 1st story

    Jun 3, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective (door) from vestibule to public hall at public hall, 1st story

    Jun 3, 2026

    Open — Nov sent out
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at entrance door from street to vestibule at public hall, 1st story

    Jun 3, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing signage at public hall, 1st story

    Jun 3, 2026

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system locked door at public hall, 1st story

    Jun 3, 2026

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak over ceiling in the kitchen located at apt 4a lower level, 4th story, 4th apartment from west at north , section ''1016''

    May 25, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 sq.ft. at ceiling and all walls at closet in the private hallway located at apt 4a upper level, 4th story, 4th apartment from west at north , section ''1016''

    May 25, 2026 · Apt 4A

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective latch set and assemblies at door (from vestibule to public hall) at section ''1013'' , 2nd story

    May 25, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch at door (from vestibule to public hall) at section ''1013'' , 2nd story

    May 25, 2026

    Open — Nov sent out
  • B

    Provide approved glass at building entrance door (from courtyard to vestibule) at section ''1013'' , 2nd story

    May 25, 2026

    Open — Nov sent out
Show 40 more ↓
  • B

    M/d law abate the nuisance consisting of plexiglass installed at building entrance door (from courtyard to vestibule) at section ''1013'' , 2nd story

    May 25, 2026

    Open — Nov sent out
  • B

    Provide approved glass at sidelights at vestibule at section ''1016'' , 1st story

    May 25, 2026

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of plexiglass installed at sidelights at vestibule at section ''1016'' , 1st story

    May 25, 2026

    Open — Nov sent out
  • B

    Provide approved glass at building entrance door (from courtyard to vestibule) at section ''1016'' , 1st story

    May 25, 2026

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of plexiglass installed at building entrance door (from courtyard to vestibule) at section ''1016'' , 1st story

    May 25, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at building entrance door (from courtyard to vestibule) at section ''1016'' , 1st story

    May 25, 2026

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 4a, 4th story, 4th apartment from west at north , section ''1016''

    May 25, 2026 · Apt 4A

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4a, 4th story, 4th apartment from west at north , section ''1016''

    May 25, 2026 · Apt 4A

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 4a lower level, 4th story, 4th apartment from west at north , section ''1016''

    May 25, 2026 · Apt 4A

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of broken and cracked vinyl floor tiles creating trip hazard in the kitchen located at apt 4a lower level, 4th story, 4th apartment from west at north , section ''1016''

    May 25, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchen located at apt 4a lower level, 4th story, 4th apartment from west at north , section ''1016''

    May 25, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Provide approved glass at sidelights at vestibule at section ''1013'' , 2nd story

    May 25, 2026

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 4a lower level, 4th story, 4th apartment from west at north , section ''1016''

    May 25, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak over ceiling in the foyer located at apt 4a lower level, 4th story, 4th apartment from west at north , section ''1016''

    May 25, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Replace with new the missing doorknob at entrance in the bathroom located at apt 4a upper level, 4th story, 4th apartment from west at north , section ''1016''

    May 25, 2026 · Apt 4A

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of broken and missing vinyl floor tiles creating trip hazard in the private hallway located at apt 4a upper level, 4th story, 4th apartment from west at north , section ''1016''

    May 25, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the private hallway located at apt 4a upper level, 4th story, 4th apartment from west at north , section ''1016''

    May 25, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak over ceiling in the private hallway located at apt 4a upper level, 4th story, 4th apartment from west at north , section ''1016''

    May 25, 2026 · Apt 4A

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of broken and missing vinyl floor tiles creating trip hazard in the 2nd room from east at north located at apt 4a upper level, 4th story, 4th apartment from west at north , section ''1016''

    May 25, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at north located at apt 4a upper level, 4th story, 4th apartment from west at north , section ''1016''

    May 25, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak over ceiling in the 2nd room from east at north located at apt 4a upper level, 4th story, 4th apartment from west at north , section ''1016''

    May 25, 2026 · Apt 4A

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of plexiglass installed at sidelights at vestibule at section ''1013'' , 2nd story

    May 25, 2026

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 5l, 5th story, 30th apartment from east at south

    May 14, 2026 · Apt 5L

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from north located at apt 5l, 5th story, 30th apartment from east at south

    May 14, 2026 · Apt 5L

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective aeorater at sink in the bathroom located at apt 5l, 5th story, 30th apartment from east at south

    May 14, 2026 · Apt 5L

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5l, 5th story, 30th apartment from east at south

    May 14, 2026 · Apt 5L

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 5l, 5th story, 30th apartment from east at south

    May 14, 2026 · Apt 5L

    Open — Notice of issuance sent to tenant
  • C

    Replace or repair the self-closing doors that is missing or defective door used as second means of egress in the 2nd room from north located at apt 5l, 5th story, 30th apartment from east at south

    May 14, 2026 · Apt 5L

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5l, 5th story, 30th apartment from east at south

    May 14, 2026 · Apt 5L

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective wood floor in the 2nd room from north located at apt 5l, 5th story, 30th apartment from east at south

    May 14, 2026 · Apt 5L

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 5l, 5th story, 30th apartment from east at south

    May 14, 2026 · Apt 5L

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective window sash lock in the 1st room from north located at apt 5l, 5th story, 30th apartment from east at south

    May 14, 2026 · Apt 5L

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 30, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective latch set and assemblies at vestibule door , 1st story, section ''1013''

    Mar 11, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch at vestibule door , 1st story, section ''1013''

    Mar 11, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective [latch set] vestibule door at public hall, 3rd story

    Jan 17, 2026

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective latch set and its assemblys at vestibule door at public hall, 3rd story

    Jan 17, 2026

    Open — Nov sent out
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 6a, 5th story, 4th apartment from south at west

    Jul 11, 2025 · Apt 6A

    Open — Nov sent out
  • B

    Repair the broken or defective connection wasteline under was basin in the bathroom located at apt 6a, 5th story, 4th apartment from south at west

    Jul 11, 2025 · Apt 6A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ruber gasket around refrigirator doors in the kitchen located at apt 6a, 5th story, 4th apartment from south at west

    Jul 11, 2025 · Apt 6A

    Open — Nov sent out

DOB building violations · 108

  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 3, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
Show 40 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 20, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 20, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 20, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 20, 2017

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 21, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 21, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 21, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 20, 2016

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 24, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 20, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 20, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 20, 2015

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 20, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 16, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 16, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 16, 2014

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 5, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 4, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 4, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 4, 2013

    Dob violation - resolved
  • Facade facade optional

    Cycle 7 unsafe report filed

    Feb 19, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Feb 19, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 9, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 9, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 9, 2011

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 28, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 19, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 19, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 28, 2008

    Dob violation - resolved

ECB violations · 52

  • Class - 2

    Class 2 violation issued items are / device piston seal leaking, remedy; repair / dirty pit ,remedy;clean, / car floor to hoist way landing not level, remedy; adjust, / no access in motor room. remedy, provide

    Apr 27, 2022 · Penalty $625

    Resolve
  • Class - 1

    Out ofservice, return to service

    Mar 16, 2022 · Penalty $1,280

    Resolve
  • Class - 2

    Phone not working, provide keys to motor room

    Jan 31, 2022 · Penalty $310

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 8b report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control#808006. agg1: prior nov#37013396z under

    Jun 1, 2021 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 8b report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control#808005. agg1: prior nov#37013411h under

    Jun 1, 2021 · Penalty $1,250

    Active
  • Class - 2

    Bc3314.3.3 failure to provide design drawings & have on site as per code on site as per code.at time of inspection on an active 6 story alt facade restoration notice c-hook,suspended scaffold & all rigging at

    Mar 16, 2021 · Penalty $1,280

    Resolve
  • Class - 1

    Failure to perform inspection prior to the installation of suspended scaffold as per code.at time of inspection on an active 6 story alt facade restoration.notice c-hook,suspended scaffold & alt its rigging at

    Mar 16, 2021 · Penalty $10,030

    Resolve
  • Class - 2

    Failure to maintain/display on site documents required by chapter 33. at time of inspection on an active facade restoration 6 story notice at locations around the bldg a sidewalk/pedestrian shed,the shed at ti

    Mar 16, 2021 · Penalty $1,280

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation#35319265h issued on 7/9/2018 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01(d)(2).

    Jun 29, 2020 · Penalty $1,280

    Resolve
  • Class - 2

    Failure to submit a required cycle 8b reprot of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #808005. rmdy: submit required technical report.

    Oct 15, 2018 · Penalty $1,280

    Active
Show 40 more ↓
  • Class - 2

    Failure to submit a required cycle 8b reprot of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #808006. rmdy: submit required technical report.

    Oct 15, 2018 · Penalty $1,280

    Resolve
  • Class - 2

    Failure to comply with the commissioners order containted in summons/ violation #32092093h issued on 12/18/17 and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01 (d)(2).an acceptable

    Oct 4, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with the commissioners order containted in summons/ violation #32092094j issued on 12/18/17 and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01 (d)(2).an acceptable

    Oct 4, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with the commissioners order containted in summons/ violation #32092092x issued on 12/18/17 and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01 (d)(2).an acceptable

    Oct 4, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    97x17. only elevator in section of bldg out of service as per 1rcny 11-02. rem: restore to service immediately & notify nyc dob the device has been return to service call 212-393-2435. notify nyc dob the device

    Jul 29, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain exterior bldg facade and appurtenances. *west elevation exposure 2, observed cracked/spalled and loose masonry facade atbalcony on 2nd floor; deteriorated steel frame at balconies on various

    Jul 9, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    36)as per class 254-36 boiler not register as per dob records.

    Dec 18, 2017 · Penalty $500

    Active
  • Class - 2

    36)as per class 254-36 boiler not registered, as per dob records.

    Dec 18, 2017 · Penalty $500

    Active
  • Class - 2

    36)as per class 254-36 boiler not registered as per dob records.

    Dec 18, 2017 · Penalty $500

    Active
  • Class - 2

    97x17)the only elevator in building out of service. upon inspection the device is found to be out of service creating a hazardous condition as per 1rcny-11-02 restore to service immediately and notify nycdob th

    Sep 21, 2017 · Penalty $250

    Resolve
  • Class - 1

    97x10 class 1 violation issued for failure to maintain building in code compliant manner as per bc3001.2, 27-987.dob records show device as active but upon inspection elevator was found to be out of service cre

    May 25, 2016 · Penalty $1,000

    Resolve
  • Class - 2

    29r05,31r05,39r05. work w/out a permit. port number (29)door operator (31)leveling unit (39)insp box & part was installed w/out permit being obtained & application being filed. rem: file application & obtain pe

    May 25, 2016 · Penalty $800

    Resolve
  • Class - 2

    97x10 upon inspection device was found to be out of service. dob records show device 2p4572 as active. restore device to service immediately

    May 13, 2016 · Penalty $500

    Resolve
  • Class - 1

    97x10,97x10-restore entire device back to service.

    Aug 22, 2014 · Penalty $5,000

    Resolve
  • Class - 2

    08v10-elevator rewiring floor stops 57-restore emergency communication

    Aug 12, 2013

    Resolve
  • Class - 2

    67x10,08v10 67-restore emergency communication in elevator to an outside office 08-elevator

    Aug 12, 2013

    Resolve
  • Class - 2

    08v10,07y10,08n10 07-restore communication to elev cab.

    Aug 12, 2013

    Resolve
  • Class - 1

    Failure to provide safety measures such as sidewalk shed,fence,etc.to protect public from unsafe conditions as per 1rcny 103-04 and as per notification of unsafe conditions complaint #2182125 by ra/pe on 2/12/1

    Mar 13, 2013 · Penalty $2,400

    Active
  • Class - 1

    Failure to provide safety measures such as sidewalk shed,fence etc to protect public from unsafe conditions as per 1rcny103-04 and as per notification of unsafe conditions complaint #2182127 by ra/pe on 2-12-13

    Mar 5, 2013

    Resolve
  • Class - 1

    28-116.4.1: 16r11,97r07: 97r07;operating device without a cert of compiance. no report of inspection submitted to dob & no witnessing of test by dob. rem:contact [email protected] to schedule test appoin

    May 8, 2012 · Penalty $1,600

    Resolve
  • Class - 2

    24x10,70y10,70o02: 24-car position indicator in elev cab & hall positon indicator in operative. 70-repair oil leak, remove oil & clean pit

    Nov 29, 2011 · Penalty $250

    Resolve
  • Class - 2

    14m10,100l10,08v10: 100-l-10-repair reconnect sump pump inpit. 08-v-1 0-elevator releveling all down directional floor stops.

    Nov 28, 2011 · Penalty $250

    Resolve
  • Class - 2

    100x10,24x10,70y10,70o02: 100-restore emergency communication phone inelevator cab. 24-position indicator in elev cab & hall indicator posi tion in operative. 70-clean oil & repair oil leak,clean pit.

    Nov 28, 2011 · Penalty $250

    Resolve
  • Class - 1

    97-x-10/97-only elevator in bldg is out-of service,temporary creating conditions dangerous to human life

    Oct 26, 2010 · Penalty $1,000

    Resolve
  • Class - 2

    100u05, 70o02. 100u05- current 2yr pressure test. 70- clean oil dirt.

    Jan 6, 2009

    Resolve
  • Non-hazardous

    17h11,16i11. 17-1fl door gibs. 16-4fl door closer.

    Sep 11, 2007 · Penalty $180

    Resolve
  • Non-hazardous

    17h11,83o02,84x10.17-gibbs on 2,3,5fl.84-car communication

    Sep 11, 2007 · Penalty $180

    Resolve
  • Hazardous

    Failure to maintain. defect is:roof membrain has failed at various locations causing sheeting to rot and sag. remedy:immediately repair defects,obtain necessary permits, submit an engineers report atesting to

    Mar 17, 2003 · Penalty $800

    Resolve
  • Hazardous

    Failure to maintain ;defects are:the patched roof membrain has failed causing the sheeting to rot & loose.structual intergrity throught many areas.the roof cannot support the horizontal load causing a hazardous

    Dec 12, 2002 · Penalty $800

    Resolve
  • Hazardous

    Failure to maintain;defects are.the patched roof membrain has failed causing the sheeting to rot & lose structual intergrity throught many areas the roof cannot support the horizontal load causing a hazardous

    Dec 12, 2002 · Penalty $800

    Resolve
  • Hazardous

    Failure to maintain;defects are;the patches roof membrain has failed causing the sheeting to rot & lose strutural intergrity throught many areas the roof cannot support the horizontal load causing a hazardous

    Dec 12, 2002

    Resolve
  • Hazardous

    Failure to maintain.defects are;the patched roof membrain has failed causing the sheeting to rot & lose structual integrity throught many areas the roof cannot support the horizontal load causing a hazardous

    Dec 12, 2002 · Penalty $800

    Resolve
  • Hazardous

    Failure to maintain exterior building noted: plywood under roof is rotten and defective in various locations location: main roof 6 fl. remedy: make all necessary repairs and make safe to public.

    Dec 11, 2001 · Penalty $10,000

    Resolve
  • Hazardous

    Failure to maintain exterior.defect is:plywood under roof is rotted and defective.in various location.location:main roof 6th floor.remedy:make all necessary repairs

    Oct 12, 2001 · Penalty $2,000

    Resolve
  • Hazardous

    Failure to maintain exterior defect is:plywood under roof is rotted and defective in various location.location:main roof 6th floor.remedy:make all necessary repair

    Jul 12, 2001 · Penalty $800

    Resolve
  • Non-hazardous

    43y14,31d6,30o2,57o2. 31- exposed wire on motor room provide cover.

    Jun 16, 2000 · Penalty $350

    Resolve
  • Non-hazardous

    57o2,13m7,14m7,43y14,36u16,30o2. 18- provide glass for frame. 35- clean oil on motor room floor. 36- provide used for motor room door.

    Jun 16, 2000 · Penalty $350

    Resolve
  • Non-hazardous

    43y14,57y9,35a9,74y14,57o2. 33- patch hole on motor room wall by di of work.79-seal jack in pit off moto room floor.

    Jun 16, 2000 · Penalty $350

    Resolve
  • Non-hazardous

    9h12,57o2,43y14,43m7,37d6,30o2,18m7. -43 provide cover on motor expos-ed wire, -37 secure wire under controller, -18 interlock cover replacewhere needed.

    Jun 17, 1999 · Penalty $2,500

    Resolve
  • Non-hazardous

    43y14,43m7,37d6,57o2,9h12,30o2,18m7,5b1,5b12. -5 adjust car bayonnet on car clucth and shaftway door roller, -43 provide cover on motor exposed wires, -37 secure wires under controller, -18 interlock cover

    Jun 17, 1999 · Penalty $2,500

    Resolve

Complaints

  • Flooring/stairs

    Floor

    Jul 1, 2026 · Apt 1I

    Close
  • Unsanitary condition

    Mold

    Jul 1, 2026 · Apt 1I

    Close
  • Electric

    Power outage

    Jun 2, 2026 · Apt 4J

    Close
  • Electric

    Power outage

    Jun 2, 2026 · Apt BLDG

    Close
  • Electric

    Power outage

    Jun 2, 2026 · Apt 4E

    Close
  • Unsanitary condition

    Mold

    May 13, 2026 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    May 11, 2026 · Apt 5L

    Close
  • Plumbing

    Bathtub/shower

    May 11, 2026 · Apt 5L

    Close
  • Unsanitary condition

    Pests

    May 11, 2026 · Apt 5L

    Close
  • Unsanitary condition

    Pests

    May 11, 2026 · Apt 5L

    Close
Show 40 more ↓
  • Door/window

    Door

    May 11, 2026 · Apt 5L

    Close
  • Paint/plaster

    Ceiling

    May 11, 2026 · Apt 5L

    Close
  • Flooring/stairs

    Floor

    May 11, 2026 · Apt 5L

    Close
  • Door/window

    Window frame

    May 11, 2026 · Apt 5L

    Close
  • Unsanitary condition

    Sewage

    May 5, 2026 · Apt 4A

    Close
  • Unsanitary condition

    Sewage

    May 5, 2026 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Apr 29, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Feb 25, 2026 · Apt 600

    Close
  • Heat/hot water

    Apartment only

    Feb 3, 2026 · Apt 6N

    Close
  • Heat/hot water

    Entire building

    Jan 21, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 17, 2026 · Apt 2N

    Close
  • Heat/hot water

    Entire building

    Jan 17, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 17, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 15, 2026 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Jan 15, 2026 · Apt 5L

    Close
  • Heat/hot water

    Apartment only

    Jan 15, 2026 · Apt 600

    Close
  • Heat/hot water

    Entire building

    Oct 23, 2025 · Apt 6D

    Close
  • Heat/hot water

    Apartment only

    Oct 23, 2025 · Apt B3

    Close
  • Plumbing

    Sewer

    Aug 14, 2025 · Apt 1I

    Close
  • Water leak

    Slow leak

    Aug 14, 2025 · Apt 1I

    Close
  • Door/window

    Door

    Jul 9, 2025 · Apt 6A

    Close
  • Door/window

    Door

    Jul 9, 2025 · Apt 6A

    Close
  • Door/window

    Door

    Jul 9, 2025 · Apt 6A

    Close
  • Appliance

    Refrigerator

    Jul 9, 2025 · Apt 6A

    Close
  • Plumbing

    Basin/sink

    Jul 9, 2025 · Apt 6A

    Close
  • Plumbing

    Basin/sink

    Jul 9, 2025 · Apt 6A

    Close
  • Water leak

    Heavy flow

    Jul 9, 2025 · Apt 6A

    Close
  • Heat/hot water

    Apartment only

    Apr 4, 2025 · Apt B3

    Close
  • Heat/hot water

    Apartment only

    Mar 29, 2025 · Apt B3

    Close
  • General

    Signage missing

    Mar 28, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 13, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 12, 2025 · Apt 6I

    Close
  • Heat/hot water

    Entire building

    Mar 12, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 10, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 21, 2025 · Apt B3

    Close
  • Heat/hot water

    Apartment only

    Feb 21, 2025 · Apt B3

    Close
  • Heat/hot water

    Apartment only

    Feb 18, 2025 · Apt B3

    Close
  • Heat/hot water

    Apartment only

    Feb 16, 2025 · Apt B3

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1974
Floors
6
Residential units
237
Building area
276,135 ft²
Lot area
126,394 ft²
Zoning
R8
Community board
206
Council district
15
Block / lot
3138 / 1
Assessed value
$8,388,450
Landmark / historic district
No

HPD registration #221874, last renewed Mar 26, 2026.

Questions about 999 East 180 Street

Who owns 999 East 180 Street?

The owner of record in NYC Department of City Planning PLUTO data is Boston Tremont Housing Dev. Fund Corpora Tion.

Does 999 East 180 Street have violations?

Yes. NYC HPD has recorded 634 housing violations at this property.

Is 999 East 180 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 999 East 180 Street built?

City records list 1974 as the year it was built.

How many apartments are in 999 East 180 Street?

It has 237 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.