913 East 179 Street
Bronx, NY 10460BBL 2-03122-0067Map
Owner of record: East 179th St. LLC
913 East 179 Street is an elevator apartment building built in 1924 in Bronx, 10460. It has 43 residential units across 6 floors. The owner of record is East 179th St. LLC. HPD has recorded 683 housing violations here, most recently on September 22, 2026. 43 of the 50 most recent violations are still open.
- HPD violations
- 683
- DOB violations
- 39
- ECB violations
- 24
- HPD complaints
- 730
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 683
- BHazardous
Properly repair or replace the broken or defective cracked glass pane at 1st window from west at north lower sash in the 3rd room from north located at apt 2e, 2nd story, 2nd apartment from east at south
Sep 22, 2026 · Apt 2E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door off hinges in the 3rd room from north located at apt 2e, 2nd story, 2nd apartment from east at south
Sep 22, 2026 · Apt 2E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective 2nd window from north at west wall upper glass paine cracked in the 3rd room from north located at apt 2e, 2nd story, 2nd apartment from east at south
Sep 22, 2026 · Apt 2E
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective cracked glass pane at building vestibule door at public hall, 1st story
Sep 22, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2e, 2nd story, 2nd apartment from east at south
Sep 22, 2026 · Apt 2E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective warped sub wood floor in the private hallway located at apt 2e, 2nd story, 2nd apartment from east at south
Sep 22, 2026 · Apt 2E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective buzz system from building entrance to east wall in the private hallway located at apt 2e, 2nd story, 2nd apartment from east at south
Sep 22, 2026 · Apt 2E
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature exceeds 130 degrees fahrenheit in the entire apartment located at apt 3c, 3rd story, 2nd apartment from east at south , section ''a-d'', at west
Sep 19, 2026 · Apt 3C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3a, 3rd story, 1st apartment from west at north , section ''a-d'', at west
Sep 19, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3c, 3rd story, 2nd apartment from east at south , section ''a-d'', at west
Sep 19, 2026 · Apt 3C
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide adequate supply of hot water for the fixtures no volume cause unknown in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north , section ''a-d'', at west
Sep 19, 2026 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 6d, 6th story, 3rd apartment from east at south
Sep 9, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Refit door at entrance in the bathroom located at apt 6d, 6th story, 3rd apartment from east at south
Sep 9, 2026 · Apt 6D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north at east located at apt 6d, 6th story, 3rd apartment from east at south
Sep 9, 2026 · Apt 6D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north located at apt 6d, 6th story, 3rd apartment from east at south
Sep 9, 2026 · Apt 6D
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at 1st closet from north at east wall wall in the 4th room from north at east located at apt 6d, 6th story, 3rd apartment from east at south
Sep 9, 2026 · Apt 6D
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective electrical outlet at south wall in the 1st room from north located at apt 6d, 6th story, 3rd apartment from east at south
Sep 9, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 6d, 6th story, 3rd apartment from east at south
Sep 9, 2026 · Apt 6D
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 6d, 6th story, 3rd apartment from east at south
Sep 9, 2026 · Apt 6D
Open — Notice of issuance sent to tenant - BHazardous
Properly secure the loose doors at 1st closet from north at east wall in the 4th room from north at east located at apt 6d, 6th story, 3rd apartment from east at south
Sep 9, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Refit door at entrance in the 1st room from north located at apt 6d, 6th story, 3rd apartment from east at south
Sep 9, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Properly secure the loose door at entrance in the 4th room from north at east located at apt 6d, 6th story, 3rd apartment from east at south
Sep 9, 2026 · Apt 6D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 3rd room from north, the bathroom , the 1st terrace from east located at apt 1b, 1st story, 1st apartment from south at west
Aug 6, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling, north and east walls inside the east wall closet 1st closet from north at east wall ceiling in the private hallway located at apt 1b, 1st story, 1st apartment from south at west
Aug 1, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Aug 1, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch at vestibule door at public hall, 1st story
Aug 1, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door at public hall, 1st story
Aug 1, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 1b, 1st story, 1st apartment from south at west
Aug 1, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Aug 1, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at vestibule door at public hall, 1st story
Aug 1, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door at public hall, 1st story
Aug 1, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door to laundry room at basement
Aug 1, 2026
Open — Nov sent out - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder , shoe at bottom of drop ladder tack welded, properly securing by appropriate nuts and bolts at 2nd fire escape from east at south exterior wall
Jul 1, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at vestibule , 1st story
Jul 1, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective heavy duty mortise lock and assemblies at building entrance door (from courtyard to vestibule) , 1st story
Jul 1, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door (from courtyard to vestibule) , 1st story
Jul 1, 2026
Open — Nov sent out - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder , shoe at bottom of drop ladder tack welded, properly securing by appropriate nuts and bolts at 1st fire escape from east at south exterior wall
Jul 1, 2026
Open — Nov sent out - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder , shoe at bottom of drop ladder tack welded, properly securing by appropriate nuts and bolts at fire escape, east exterior wall
Jul 1, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lock at mailbox of apartment ''2e'' at public hall, 1st story
Jul 1, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at vestibule , 1st story
Jul 1, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door (from vestibule to public hall) , 1st story
Jul 1, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at vestibule , 1st story
Jul 1, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper glass pane at 2nd window from east at south in the 2nd room from north at east located at apt 2e, 2nd story, 1st apartment from east at south , section ''efg'', at east
Jun 28, 2026 · Apt 2E
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet of mold at ceiling in the bathroom located at apt 2e, 2nd story, 1st apartment from east at south , section ''efg'', at east
Jun 28, 2026 · Apt 2E
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective buzzer and return voice system from building entrance up to panel at west wall in the private hallway located at apt 2e, 2nd story, 1st apartment from east at south , section ''efg'', at east
Jun 28, 2026 · Apt 2E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mailbox door for apt 2e , 1st story
Jun 28, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2e, 2nd story, 1st apartment from east at south , section ''efg'', at east
Jun 28, 2026 · Apt 2E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2e, 2nd story, 1st apartment from east at south , section ''efg'', at east
Jun 28, 2026 · Apt 2E
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective sinking vinyl floor tile in the kitchen located at apt 2e, 2nd story, 1st apartment from east at south , section ''efg'', at east
Jun 28, 2026 · Apt 2E
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at east and north wall in the bathroom located at apt 2e, 2nd story, 1st apartment from east at south , section ''efg'', at east
Jun 28, 2026 · Apt 2E
Closed — Violation dismissed
DOB building violations · 39
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 5, 2025
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 8, 2025
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Construction other optional
Partial vacate ord.observed crack/deteriorated masonry/stucco & mortar joints 7 multiple locations west courtyard(exp2)these conditions have therefore made the west courtyard unable to occupy except in emergency sitations.remedy:vacate the east courtyard & take safety measures to prevent access to vacated area
Mar 20, 2024
Dob violation - active - Construction other optional
Emerg work ord due to deteriorated facade observed at mulciple locations:cracked bricks,loose mortar joints. remedy: immediately provide sidewalk shed at exp#1 and exp#4(south,east elevations)(179 daly av)also provide adequate safety measures at (exp2,3)(west north) make immediate repairs under nys ra/pe supervision
Mar 16, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 19, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - active
Show 29 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 15, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 13, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 28, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 14, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 14, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 23, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 24, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 31, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 15, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 26, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 29, 2003
Dob violation - resolved - Elevator elevatorrequired
2p5212
Mar 5, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - active - Elevator elevatoroptional
1
Jun 29, 1990
Dob violation - dismissed - Elevator elevatoroptional
1
Oct 12, 1989
Dob violation - dismissed
ECB violations · 24
- Class - 2
At time of inspection, occupied 6-story building observed with sidewalk shed at exposures 1 and 4. shed permit #x01022719-i1-sh expired on 03/06/2026. shed still in place without valid permit. condition creates
Jun 22, 2026 · Penalty $1,250
Active - Class - 2
At time of inspection, occupied 6-story building observed with sidewalk shed at exposure 2. shed blocks street signs at honeywell ave and e 179 st. information panel missing. reflective markings and convex mirr
Jun 22, 2026 · Penalty $2,400
Active - Class - 1
Failure to provide unobstructed exit passageway. noted: observed objects on fire escapes at exp 1(s. elevation) and exp 4(e elevation). objects like flower pots, lamp, and clothings are on fire escapes. remedy:
Jun 6, 2025 · Penalty $2,500
Active - Class - 1
Failure to maintain exterior building facade and appurtenances. noted:observed cracked/spalling brick masonry at exp 1(s elevation), exp 4(eelevation), and roof bulkhead. these conditions existed on ecb violati
Jun 6, 2025 · Penalty $5,000
Active - Class - 2
Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #919509. remedy: submit acceptable requ
Apr 8, 2025 · Penalty $2,500
Active - Class - 1
Failure to maintain building exterior facade and appurtenances in a code compliant manner.at time of inspection it was observed at exposure 1(south elevation)& 4(east elev)deteriorated mortar joints spalling/cr
Dec 5, 2024
Resolve - Class - 1
Failure to provide unobstructed exit passageway.-note: at time of inspection, i observed objects on fire escapes exp #1 south 6fl, 4fl, #2 west 3fl, 1fl, exp #4 east 3fl.-large ac units on multiple fire escape
Oct 25, 2024 · Penalty $1,250
Active - Class - 2
Failure to maintain building walls and appurtenances. at time of inspection, i observed step cracks, vertical cracks, damaged masonry, defected mortar joints, at expo (1) and (2) and (4), south and west and eas
Jun 17, 2024 · Penalty $1,250
Active - Class - 1
Failure to mainatin exterior building facade and appurtenances. note: at the time of inspection: observed cracked bricks and loose mortar joints at multiple locations. remedy: maintain exterior facade take safe
Mar 16, 2024 · Penalty $2,500
Active - Class - 2
B263 failure to comply with commissioners order to file a certificate of correction with the dept.of buildings for violation#39022473k submit cert.of correction
Aug 23, 2022
Resolve
Show 14 more ↓
- Class - 2
As per b254 ftm found a (h) stamped a/o smith boiler not registered as per d.o.b records correct all violating conditions
May 19, 2020 · Penalty $3,125
Active - Class - 2
Fmt boiler b254 found a burnham boiler missing id tag to have these violating conditions rotted rear section,rotted coil plate lwco no wired relief valve leaks correct all vio,conditions
May 19, 2020 · Penalty $625
Active - Class - 1
Found in basement ý1¨ a.o. smith hot water boiler gas with h-stamp btu 660000 model# h.w. 670-300 yr 2018 no permit were pull to do this work as per dob records.
Nov 25, 2019 · Penalty $2,500
Active - Class - 2
As per dob records ý1¨ a.o smith boiler model # h.w.670-300 yr 2018 is not register with this dept as per dob records.
Nov 25, 2019 · Penalty $625
Active - Class - 2
Need to install rating plate on boiler . safety valve is leaking at site.
Nov 25, 2019 · Penalty $625
Active - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#32097277p issued on 7/31/18 and to file a cert.of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2)an acceptible cert.has not
May 21, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#32097278r issued on 7/31/18 and to file a cert.of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2)an acceptible cert.has not
May 21, 2019 · Penalty $1,250
Resolve - Class - 2
19b)manual reset aquastat missing.
Jul 31, 2018 · Penalty $625
Active - Class - 2
32a,50,50a-50)no rating plate on boiler. 50a)need to pipe safety to ground.
Jul 31, 2018 · Penalty $625
Active - Class - 2
70lq10,60l10,69m07,17h11. 70 provide sumppump cover and secure to floor;60-m/r lights; 69-code data tag; 17-lobby door gibs
Jul 25, 2014
Resolve - Class - 1
97x10 failure to maintain bldg in code compliant manner:service equipment-elevator as per bc3001.2827-987 dob records show the only elevatorin bldg is inactive.upon insp the device is found to be out of service
May 14, 2014 · Penalty $1,000
Resolve - Class - 2
3d6,40p16,67m7,42f10. 3d6- handrail. 67m7- communication as per k3 code. 42f7- car top to hard.
Aug 24, 2011 · Penalty $250
Resolve - Non-hazardous
15 ** 2/66 z 9 /84 ** 1/24 l 10/31 h 11/15-**-7-provide cerit frame.66-z-9-remove water from pit & repair pump.84-**-1-adjust hard stop of elevator at fls.24-l-10-repair up & down arrows inside elevator
Jan 22, 2007 · Penalty $180
Resolve - Non-hazardous
22o2,46k12,52b1,60k12,74x12. 52-car stop hard-properly adjut for smoother stops. 60-spring in pit rusted-replace w/ new. 76-fire extinguisher outdated.
Mar 25, 1998
Resolve
Complaints
- Door/window
Window pane
Sep 18, 2026 · Apt 2E
Close - General
Bell/buzzer/intercom
Sep 18, 2026 · Apt 2E
Close - Flooring/stairs
Floor
Sep 18, 2026 · Apt 2E
Close - Door/window
Door
Sep 18, 2026 · Apt 2E
Close - Heat/hot water
Entire building
Sep 17, 2026 · Apt 3A
Close - Appliance
Refrigerator
Sep 1, 2026 · Apt 6D
Close - Unsanitary condition
Mold
Sep 1, 2026 · Apt 6D
Close - Electric
Outlet/switch
Aug 20, 2026 · Apt 6D
Close - Unsanitary condition
Mold
Aug 20, 2026 · Apt 6D
Close - Door/window
Door
Aug 20, 2026 · Apt 6D
Close
Show 40 more ↓
- Paint/plaster
Wall
Aug 20, 2026 · Apt 6D
Close - Appliance
Refrigerator
Aug 20, 2026 · Apt 6D
Close - Unsanitary condition
Mold
Aug 20, 2026 · Apt 6D
Close - Flooring/stairs
Floor
Aug 20, 2026 · Apt 6D
Close - General
Bell/buzzer/intercom
Aug 20, 2026 · Apt 6D
Close - Door/window
Door
Aug 6, 2026 · Apt 2E
Close - General
Bell/buzzer/intercom
Jun 24, 2026 · Apt 2E
Close - Paint/plaster
Wall
Jun 24, 2026 · Apt 2E
Close - Unsanitary condition
Mold
Jun 24, 2026 · Apt 2E
Close - Flooring/stairs
Floor
Jun 24, 2026 · Apt 2E
Close - Door/window
Window pane
Jun 24, 2026 · Apt 2E
Close - General
Mailbox
Jun 24, 2026 · Apt 2E
Close - Paint/plaster
Ceiling
Jun 24, 2026 · Apt 2E
Close - General
Mailbox
Jun 17, 2026 · Apt 2E
Close - Heat/hot water
Apartment only
May 11, 2026 · Apt 3B
Close - Water leak
Damp spot
May 8, 2026 · Apt 4B
Close - Flooring/stairs
Floor
May 8, 2026 · Apt 4B
Close - General
Mailbox
May 8, 2026 · Apt 2E
Close - Paint/plaster
Ceiling
Apr 29, 2026 · Apt 3B
Close - Heat/hot water
Apartment only
Apr 29, 2026 · Apt 3B
Close - Water leak
Heavy flow
Apr 29, 2026 · Apt 3B
Close - General
Mailbox
Apr 17, 2026 · Apt 5B
Close - Water leak
Damp spot
Apr 10, 2026 · Apt 4B
Close - Plumbing
Water supply
Apr 8, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Apr 8, 2026 · Apt 1C
Close - Water leak
Slow leak
Apr 7, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Apr 7, 2026 · Apt 3B
Close - Plumbing
Bathtub/shower
Apr 7, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Apr 7, 2026 · Apt 3B
Close - General
Mailbox
Feb 25, 2026 · Apt 5C
Close - Door/window
Door
Feb 25, 2026 · Apt 5C
Close - Flooring/stairs
Floor
Jan 13, 2026 · Apt B1
Close - General
Mailbox
Jan 9, 2026 · Apt 5C
Close - Safety
Smoke detector
Dec 16, 2025 · Apt 4B
Close - Heat/hot water
Apartment only
Oct 18, 2025 · Apt 4B
Close - General
Bell/buzzer/intercom
Oct 16, 2025 · Apt 4B
Close - Heat/hot water
Apartment only
Oct 16, 2025 · Apt 4B
Close - Safety
Smoke detector
Aug 4, 2025 · Apt 1B
Close - Plumbing
Bathtub/shower
Apr 25, 2025 · Apt 1C
Close - Paint/plaster
Wall
Apr 25, 2025 · Apt 1C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1924
- Floors
- 6
- Residential units
- 43
- Building area
- 42,474 ft²
- Lot area
- 9,112 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 3122 / 67
- Assessed value
- $1,398,150
- Landmark / historic district
- No
HPD registration #213069, last renewed Aug 21, 2025.
Questions about 913 East 179 Street
Who owns 913 East 179 Street?
The owner of record in NYC Department of City Planning PLUTO data is East 179th St. LLC.
Does 913 East 179 Street have violations?
Yes. NYC HPD has recorded 683 housing violations at this property.
Is 913 East 179 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 913 East 179 Street built?
City records list 1924 as the year it was built.
How many apartments are in 913 East 179 Street?
It has 43 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.