roofy

2433 Southern Boulevard

Bronx, NY 10458BBL 2-03115-0085Map

Owner of record: Hibbert , Barbara

2433 Southern Boulevard is a walk-up apartment building built in 1901 in Bronx, 10458. It has 3 residential units across 3 floors. The owner of record is Hibbert , Barbara. HPD has recorded 94 housing violations here, most recently on September 9, 2026. 13 of the 50 most recent violations are still open.

HPD violations
94
DOB violations
1
ECB violations
2
HPD complaints
58

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 9, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 94

  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Sep 9, 2026 · Apt 1

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Sep 9, 2026 · Apt 1

    Open — Civ14 mailed
  • B

    Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1, 1st story, 1st apartment from east at south

    Sep 9, 2026 · Apt 1

    Open — Civ14 mailed
  • A

    Refit door at base cabinet in the kitchen located at apt 1, 1st story, 1st apartment from east at south

    Sep 9, 2026 · Apt 1

    Open — Civ14 mailed
  • B

    Remove all obstructions and repair all defects in at drain pipe at wash basin in the bathroom located at apt 1, 1st story, 1st apartment from east at south

    Sep 9, 2026 · Apt 1

    Open — Civ14 mailed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Sep 9, 2026 · Apt 1

    Open — Notice of issuance sent to tenant
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Apr 12, 2025

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system signage missing at public hall, 1st story

    Apr 12, 2025

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box signage missing at public hall, 1st story

    Apr 12, 2025

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Apr 12, 2025

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west

    Apr 12, 2025 · Apt 2

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west

    Apr 12, 2025 · Apt 2

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Apr 12, 2025 · Apt 2

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Apr 12, 2025 · Apt 2

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2, 2nd story, 1st apartment from south at west

    Apr 12, 2025 · Apt 2

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Apr 12, 2025

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and north wall at 1st public hall bulkhead from east, 3rd story

    Apr 12, 2025

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at 1st public hall bulkhead from east, 3rd story

    Apr 12, 2025

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at ceiling and north wall at 1st public hall bulkhead from east, 3rd story

    Apr 12, 2025

    Closed — Violation closed
  • B

    Provide approved type wire mesh under skylight at 1st public hall bulkhead from east, 3rd story

    Apr 12, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at roof door at 1st public hall bulkhead from east, 3rd story

    Apr 12, 2025

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from south at west

    Apr 12, 2025 · Apt 1

    Closed — Violation dismissed
  • B

    Provide adequate supply of hot water for the fixtures no hot water in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Dec 13, 2024 · Apt 2

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... mold at the ceiling less than 10 sq ft in the 6th room from east located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 3rd room from east located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective spring balance at upper window sash of window at south wall in the 3rd room from east located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective window lock at south wall in the 3rd room from east located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling, south wall, east wall, and west wall in the bathroom located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Closed — Violation closed
  • C

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at the ceiling in the private hallway located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective light fixture at the ceiling in the 6th room from east located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Open — Not complied with
  • A

    Properly repair or replace the broken or defective window lock at window 1 at west wall in the 6th room from east located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Open — Not complied with
  • A

    Properly repair or replace the broken or defective window lock of window 2 at the west wall in the 6th room from east located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective spring balance at upper window sash of window 3 at east wall in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... mold at the ceiling less than 10 sq ft in the 6th room from east located at apt 1, 1st story, 1st apartment from south at west original violation 17403638 issued 06-nov-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Nov 6, 2024 · Apt 1

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective spring balance at upper window sash of window 2 at east wall in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective spring balance at upper window sash of window 1 at east wall in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective hinges to vestibule door at vestibule area , 1st story

    Nov 6, 2024

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges to building entrance door , 1st story

    Nov 6, 2024

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches at public hall, 1st story

    Nov 6, 2024

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice at public hall, 1st story

    Nov 6, 2024

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation metal radiator and risers in the 2nd room from east located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Closed — Violation closed
  • B

    Properly secure the loose electrical outlet at east wall in the 2nd room from east located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Open — Not complied with
  • B

    Trace and repair the source and abate the visible mold condition... mold at the ceiling, west wall, south wall and east wall less than 30 sq ft in the bathroom located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Open — Not complied with
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges to egress door at north wall in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1, 1st story, 1st apartment from south at west

    Nov 6, 2024 · Apt 1

    Closed — Violation closed

DOB building violations · 1

  • Construction other optional

    Bc swo due to special inspector, alberto roman, surrendered all filing prvileges for job#x00602445-l1

    Aug 30, 2022

    Dob violation - dismissed

ECB violations · 2

  • Hazardous

    Residence altered for occupancy as a dwelling for more than the legally approved # of families.3 family dwelling altered 4 family dwelling w/1 class a apt created in cellar of premises.3pc kitchen w/operable

    Jul 2, 2007 · Penalty $3,050

    Resolve
  • Hazardous

    Work w/o a permit.work noted:gas line installed,partitions erected to create(4)separate rooms full 3pc kitchen installed(operable gas stove & 3pc bathroom also created in cellar of premises.remedy:obtain permi

    Jul 2, 2007

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Sep 8, 2026 · Apt 1

    Close
  • Door/window

    Window frame

    Sep 8, 2026 · Apt 1

    Close
  • General

    Cabinet

    Sep 8, 2026 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Sep 8, 2026 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Sep 8, 2026 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Sep 8, 2026 · Apt 1

    Close
  • Plumbing

    Bathtub/shower

    Sep 8, 2026 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Dec 13, 2024 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Dec 13, 2024 · Apt BLDG

    Close
  • Door/window

    Window frame

    Dec 2, 2024 · Apt 1

    Close
Show 40 more ↓
  • General

    Janitor/super

    Oct 21, 2024 · Apt 1

    Close
  • Door/window

    Window frame

    Oct 17, 2024 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Oct 17, 2024 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Oct 17, 2024 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Dec 30, 2020 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Dec 29, 2020 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Feb 26, 2020 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Jan 5, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 15, 2019 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Dec 8, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 7, 2019 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Nov 8, 2019 · Apt 1

    Close
  • Heating

    Heat related

    Feb 18, 2014 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Dec 27, 2012 · Apt 2

    Close
  • General

    Windows

    Dec 27, 2012 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Dec 3, 2012 · Apt 2FL

    Close
  • General

    Windows

    Dec 3, 2012 · Apt 2FL

    Close
  • Nonconst

    Rubbish

    Oct 2, 2012 · Apt 2

    Close
  • General

    Mold

    Sep 13, 2012 · Apt 3

    Close
  • Paint/plaster

    Wall

    Sep 13, 2012 · Apt 3

    Close
  • Appliance

    Electric/gas range

    Sep 13, 2012 · Apt 3

    Close
  • General

    Doors

    Sep 13, 2012 · Apt 3

    Close
  • General

    Mold

    Sep 13, 2012 · Apt 3

    Close
  • General

    Mold

    Sep 13, 2012 · Apt 3

    Close
  • General

    Fire-escape

    Sep 13, 2012 · Apt 3

    Close
  • Plumbing

    Water-leaks

    Sep 13, 2012 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Sep 13, 2012 · Apt 3

    Close
  • Nonconst

    Vermin

    Sep 13, 2012 · Apt 3

    Close
  • Heating

    Heat related

    Dec 29, 2011 · Apt 3

    Close
  • Heating

    Heat related

    Oct 25, 2011 · Apt 2

    Close
  • Paint/plaster

    Wall

    Sep 24, 2010 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Sep 24, 2010 · Apt 2

    Close
  • Paint/plaster

    Wall

    Sep 24, 2010 · Apt 2

    Close
  • General

    Mold

    Sep 24, 2010 · Apt 2

    Close
  • Heating

    Heat related

    Jan 3, 2008 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    May 9, 2006 · Apt 3

    Close
  • Paint/plaster

    Wall

    May 9, 2006 · Apt 3

    Close
  • Paint/plaster

    Wall

    May 9, 2006 · Apt 3

    Close
  • Paint/plaster

    Wall

    May 9, 2006 · Apt 3

    Close
  • Paint/plaster

    Wall

    Feb 27, 2006 · Apt 3

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1901
Floors
3
Residential units
3
Building area
2,940 ft²
Lot area
1,525 ft²
Zoning
R7-1
Community board
206
Council district
15
Block / lot
3115 / 85
Assessed value
$58,740
Landmark / historic district
No

HPD registration #205669, last renewed Oct 31, 2025.

Questions about 2433 Southern Boulevard

Who owns 2433 Southern Boulevard?

The owner of record in NYC Department of City Planning PLUTO data is Hibbert , Barbara.

Does 2433 Southern Boulevard have violations?

Yes. NYC HPD has recorded 94 housing violations at this property.

Is 2433 Southern Boulevard rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2433 Southern Boulevard built?

City records list 1901 as the year it was built.

How many apartments are in 2433 Southern Boulevard?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.