2433 Southern Boulevard
Bronx, NY 10458BBL 2-03115-0085Map
Owner of record: Hibbert , Barbara
2433 Southern Boulevard is a walk-up apartment building built in 1901 in Bronx, 10458. It has 3 residential units across 3 floors. The owner of record is Hibbert , Barbara. HPD has recorded 94 housing violations here, most recently on September 9, 2026. 13 of the 50 most recent violations are still open.
- HPD violations
- 94
- DOB violations
- 1
- ECB violations
- 2
- HPD complaints
- 58
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 94
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Sep 9, 2026 · Apt 1
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Sep 9, 2026 · Apt 1
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Sep 9, 2026 · Apt 1
Open — Civ14 mailed - ANon-hazardous
Refit door at base cabinet in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Sep 9, 2026 · Apt 1
Open — Civ14 mailed - BHazardous
Remove all obstructions and repair all defects in at drain pipe at wash basin in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Sep 9, 2026 · Apt 1
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Sep 9, 2026 · Apt 1
Open — Notice of issuance sent to tenant - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Apr 12, 2025
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system signage missing at public hall, 1st story
Apr 12, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box signage missing at public hall, 1st story
Apr 12, 2025
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Apr 12, 2025
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west
Apr 12, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west
Apr 12, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Apr 12, 2025 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Apr 12, 2025 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2, 2nd story, 1st apartment from south at west
Apr 12, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 12, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and north wall at 1st public hall bulkhead from east, 3rd story
Apr 12, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at 1st public hall bulkhead from east, 3rd story
Apr 12, 2025
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling and north wall at 1st public hall bulkhead from east, 3rd story
Apr 12, 2025
Closed — Violation closed - BHazardous
Provide approved type wire mesh under skylight at 1st public hall bulkhead from east, 3rd story
Apr 12, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at roof door at 1st public hall bulkhead from east, 3rd story
Apr 12, 2025
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Apr 12, 2025 · Apt 1
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures no hot water in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Dec 13, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... mold at the ceiling less than 10 sq ft in the 6th room from east located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 3rd room from east located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at upper window sash of window at south wall in the 3rd room from east located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective window lock at south wall in the 3rd room from east located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling, south wall, east wall, and west wall in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at the ceiling in the private hallway located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective light fixture at the ceiling in the 6th room from east located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Open — Not complied with - ANon-hazardous
Properly repair or replace the broken or defective window lock at window 1 at west wall in the 6th room from east located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Open — Not complied with - ANon-hazardous
Properly repair or replace the broken or defective window lock of window 2 at the west wall in the 6th room from east located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at upper window sash of window 3 at east wall in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... mold at the ceiling less than 10 sq ft in the 6th room from east located at apt 1, 1st story, 1st apartment from south at west original violation 17403638 issued 06-nov-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Nov 6, 2024 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at upper window sash of window 2 at east wall in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at upper window sash of window 1 at east wall in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges to vestibule door at vestibule area , 1st story
Nov 6, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges to building entrance door , 1st story
Nov 6, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches at public hall, 1st story
Nov 6, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice at public hall, 1st story
Nov 6, 2024
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation metal radiator and risers in the 2nd room from east located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Closed — Violation closed - BHazardous
Properly secure the loose electrical outlet at east wall in the 2nd room from east located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Open — Not complied with - BHazardous
Trace and repair the source and abate the visible mold condition... mold at the ceiling, west wall, south wall and east wall less than 30 sq ft in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges to egress door at north wall in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Nov 6, 2024 · Apt 1
Closed — Violation closed
DOB building violations · 1
- Construction other optional
Bc swo due to special inspector, alberto roman, surrendered all filing prvileges for job#x00602445-l1
Aug 30, 2022
Dob violation - dismissed
ECB violations · 2
- Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved # of families.3 family dwelling altered 4 family dwelling w/1 class a apt created in cellar of premises.3pc kitchen w/operable
Jul 2, 2007 · Penalty $3,050
Resolve - Hazardous
Work w/o a permit.work noted:gas line installed,partitions erected to create(4)separate rooms full 3pc kitchen installed(operable gas stove & 3pc bathroom also created in cellar of premises.remedy:obtain permi
Jul 2, 2007
Resolve
Complaints
- Unsanitary condition
Pests
Sep 8, 2026 · Apt 1
Close - Door/window
Window frame
Sep 8, 2026 · Apt 1
Close - General
Cabinet
Sep 8, 2026 · Apt 1
Close - Unsanitary condition
Mold
Sep 8, 2026 · Apt 1
Close - Unsanitary condition
Pests
Sep 8, 2026 · Apt 1
Close - Plumbing
Basin/sink
Sep 8, 2026 · Apt 1
Close - Plumbing
Bathtub/shower
Sep 8, 2026 · Apt 1
Close - Heat/hot water
Entire building
Dec 13, 2024 · Apt BLDG
Close - Plumbing
Water supply
Dec 13, 2024 · Apt BLDG
Close - Door/window
Window frame
Dec 2, 2024 · Apt 1
Close
Show 40 more ↓
- General
Janitor/super
Oct 21, 2024 · Apt 1
Close - Door/window
Window frame
Oct 17, 2024 · Apt 1
Close - Unsanitary condition
Pests
Oct 17, 2024 · Apt 1
Close - Unsanitary condition
Mold
Oct 17, 2024 · Apt 1
Close - Unsanitary condition
Mold
Dec 30, 2020 · Apt 1
Close - Heat/hot water
Entire building
Dec 29, 2020 · Apt 1
Close - Heat/hot water
Entire building
Feb 26, 2020 · Apt 1
Close - Heat/hot water
Entire building
Jan 5, 2020 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 15, 2019 · Apt 1
Close - Heat/hot water
Entire building
Dec 8, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 7, 2019 · Apt 1
Close - Heat/hot water
Apartment only
Nov 8, 2019 · Apt 1
Close - Heating
Heat related
Feb 18, 2014 · Apt 2
Close - Plumbing
Basin/sink
Dec 27, 2012 · Apt 2
Close - General
Windows
Dec 27, 2012 · Apt 2
Close - Plumbing
Basin/sink
Dec 3, 2012 · Apt 2FL
Close - General
Windows
Dec 3, 2012 · Apt 2FL
Close - Nonconst
Rubbish
Oct 2, 2012 · Apt 2
Close - General
Mold
Sep 13, 2012 · Apt 3
Close - Paint/plaster
Wall
Sep 13, 2012 · Apt 3
Close - Appliance
Electric/gas range
Sep 13, 2012 · Apt 3
Close - General
Doors
Sep 13, 2012 · Apt 3
Close - General
Mold
Sep 13, 2012 · Apt 3
Close - General
Mold
Sep 13, 2012 · Apt 3
Close - General
Fire-escape
Sep 13, 2012 · Apt 3
Close - Plumbing
Water-leaks
Sep 13, 2012 · Apt 3
Close - Paint/plaster
Ceiling
Sep 13, 2012 · Apt 3
Close - Nonconst
Vermin
Sep 13, 2012 · Apt 3
Close - Heating
Heat related
Dec 29, 2011 · Apt 3
Close - Heating
Heat related
Oct 25, 2011 · Apt 2
Close - Paint/plaster
Wall
Sep 24, 2010 · Apt 2
Close - Plumbing
Water-leaks
Sep 24, 2010 · Apt 2
Close - Paint/plaster
Wall
Sep 24, 2010 · Apt 2
Close - General
Mold
Sep 24, 2010 · Apt 2
Close - Heating
Heat related
Jan 3, 2008 · Apt BLDG
Close - Paint/plaster
Wall
May 9, 2006 · Apt 3
Close - Paint/plaster
Wall
May 9, 2006 · Apt 3
Close - Paint/plaster
Wall
May 9, 2006 · Apt 3
Close - Paint/plaster
Wall
May 9, 2006 · Apt 3
Close - Paint/plaster
Wall
Feb 27, 2006 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1901
- Floors
- 3
- Residential units
- 3
- Building area
- 2,940 ft²
- Lot area
- 1,525 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 3115 / 85
- Assessed value
- $58,740
- Landmark / historic district
- No
HPD registration #205669, last renewed Oct 31, 2025.
Questions about 2433 Southern Boulevard
Who owns 2433 Southern Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Hibbert , Barbara.
Does 2433 Southern Boulevard have violations?
Yes. NYC HPD has recorded 94 housing violations at this property.
Is 2433 Southern Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2433 Southern Boulevard built?
City records list 1901 as the year it was built.
How many apartments are in 2433 Southern Boulevard?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.