2120 Mapes Avenue
Bronx, NY 10460BBL 2-03111-0004Map
Owner of record: 2120 Mapes Ave Hsing
2120 Mapes Avenue is a walk-up apartment building built in 1914 in Bronx, 10460. It has 29 residential units across 5 floors. The owner of record is 2120 Mapes Ave Hsing. HPD has recorded 137 housing violations here, most recently on September 9, 2026. 37 of the 50 most recent violations are still open.
- HPD violations
- 137
- DOB violations
- 9
- ECB violations
- 3
- HPD complaints
- 64
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 137
- BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 4d, 4th story, 1st apartment from south at west
Sep 9, 2026 · Apt 4D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at window east wall in the 4th room from east located at apt 4d, 4th story, 1st apartment from south at west
Sep 9, 2026 · Apt 4D
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 1, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 5th story balcony at 1st fire escape from north at west exterior wall at fire escape
Aug 29, 2026
Open — Nov sent out - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder [and properly secure by using appropiate nuts and bolts] at 2nd fire escape from north at west exterior wall at fire escape
Aug 29, 2026
Open — Nov sent out - BHazardous
Provide adequate lighting at ceiling at fire passage way
Aug 29, 2026
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at .. in the entire apartment located at apt 4a, 5th story, 1st apartment from east at south
Jun 5, 2026 · Apt 4A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4a, 5th story, 1st apartment from east at south
Jun 5, 2026 · Apt 4A
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective marble saddle at entrance in the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west
Feb 25, 2026 · Apt 1E
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Feb 25, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Feb 25, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 1e, 2nd story, 2nd apartment from south at west
Feb 25, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1e, 2nd story, 2nd apartment from south at west
Feb 25, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1e, 2nd story, 2nd apartment from south at west
Feb 25, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west
Feb 25, 2026 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west
Feb 25, 2026 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4a, 4th story, 1st apartment from north at east
Feb 21, 2026 · Apt 4A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective inoperable hinges at entrance in the private hallway located at apt 4a, 4th story, 1st apartment from north at east
Feb 21, 2026 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4a, 4th story, 1st apartment from north at east
Feb 21, 2026 · Apt 4A
Open — Notice of issuance sent to tenant - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the foyer located at apt 2f, 3rd story, 3rd apartment from south at west
Jan 10, 2024 · Apt 2F
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective cracked ceramic floor tiles [ walk area] in the kitchen located at apt 4d, 5th story, 1st apartment from south at west
Jan 7, 2024 · Apt 4D
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3f, 4th story, 3rd apartment from west at north
Dec 5, 2023 · Apt 3F
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock at door leading to fire escape. in the 1st room from north located at apt 3f, 4th story, 3rd apartment from west at north
Dec 5, 2023 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 3rd story, 3rd apartment from south at west
Dec 1, 2023 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 3rd story, 3rd apartment from south at west
Dec 1, 2023 · Apt 2F
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2f, 3rd story, 3rd apartment from south at west
Dec 1, 2023 · Apt 2F
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective calking around the bathtub in the bathroom located at apt 2f, 3rd story, 3rd apartment from south at west
Dec 1, 2023 · Apt 2F
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 17, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system at basement at boiler room
Feb 4, 2023
Open — Nov certified late - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 3rd story, 3rd apartment from south at west
Feb 4, 2023 · Apt 2F
Open — Nov certified late - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2022
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 3rd story, 3rd apartment from south at west
Aug 17, 2022 · Apt 2F
Open — Nov certified late - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2f, 3rd story, 3rd apartment from south at west
Aug 17, 2022 · Apt 2F
Open — Nov certified late - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 2f, 3rd story, 3rd apartment from south at west
Aug 17, 2022 · Apt 2F
Open — Nov certified late - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt d, 1st story, 1st apartment from east at south
May 20, 2022 · Apt D
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
May 6, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at the 1st story public hall
May 6, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 6, 2022
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
May 6, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
May 6, 2022
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at the 1st story public hall
May 6, 2022
Closed — Violation dismissed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2b, 3rd story, 2nd apartment from north at east
May 6, 2022 · Apt 2B
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt c, 1st story, 3rd apartment from north at east
May 6, 2022 · Apt C
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1b, 2nd story, 1st apartment from north at east
May 6, 2022 · Apt 1B
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt f, 1st story, 1st apartment from west at north
May 6, 2022 · Apt F
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Feb 18, 2022 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Feb 18, 2022 · Apt 3D
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 17, 2022
Closed — Violation dismissed
DOB building violations · 9
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed
ECB violations · 3
- Class - 2
Failure to comply with commissioner's order contained in summons #39075617j issued on 12/14/2022, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert
Jan 29, 2025 · Penalty $1,250
Resolve - Class - 2
Heating pipes ceiling penetration in apt#3f (kitchen, bathroom and bedroom) not sealed as required in multiple dwelling building., repair and/or replace
Jan 17, 2023 · Penalty $3,125
Active - Class - 2
At time of inspection observed apt # 3f ceiling in state of disrepair conditions with cracks & hole sheetrock around the hitting pipes in bath, living & bedrooms., repair and/or replace
Dec 14, 2022 · Penalty $625
Active
Complaints
- Door/window
Window frame
Aug 29, 2026 · Apt 4D
Close - Unsanitary condition
Mold
Aug 26, 2026 · Apt 4D
Close - Door/window
Window frame
Aug 24, 2026 · Apt 4D
Close - Unsanitary condition
Pests
Aug 23, 2026 · Apt 4D
Close - Door/window
Door
Aug 14, 2026 · Apt 4D
Close - Heat/hot water
Entire building
Apr 30, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Apr 1, 2026 · Apt 4A
Close - Unsanitary condition
Pests
Feb 26, 2026 · Apt 4A
Close - Unsanitary condition
Pests
Feb 18, 2026 · Apt 4A
Close - Unsanitary condition
Pests
Feb 18, 2026 · Apt 4A
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Feb 10, 2026 · Apt 1E
Close - Plumbing
Water supply
Sep 22, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 5, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 23, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 23, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2023 · Apt 3F
Close - Heat/hot water
Entire building
Dec 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 12, 2023 · Apt 3F
Close - Heat/hot water
Entire building
Dec 8, 2023 · Apt BLDG
Close - Plumbing
Water supply
Dec 7, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 7, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 2, 2023 · Apt 3F
Close - Heat/hot water
Entire building
Nov 30, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 30, 2023 · Apt 3F
Close - Heat/hot water
Entire building
Nov 30, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 30, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 30, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 30, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2023 · Apt 3F
Close - Water leak
Heavy flow
Feb 19, 2023 · Apt F
Close - Electric
Outlet/switch
Feb 18, 2023 · Apt 3F
Close - Water leak
Slow leak
Feb 4, 2023 · Apt 3F
Close - Heat/hot water
Apartment only
Feb 4, 2023 · Apt 3F
Close - Heat/hot water
Entire building
Feb 3, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 15, 2022 · Apt 3F
Close - Paint/plaster
Ceiling
Aug 22, 2022 · Apt 2F
Close - Unsanitary condition
Pests
Aug 22, 2022 · Apt 2F
Close - Unsanitary condition
Mold
Aug 22, 2022 · Apt 2F
Close - Water leak
Slow leak
Aug 8, 2022 · Apt 2F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1914
- Floors
- 5
- Residential units
- 29
- Building area
- 27,495 ft²
- Lot area
- 6,508 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 3111 / 4
- Assessed value
- $603,450
- Landmark / historic district
- No
HPD registration #203762, last renewed Nov 21, 2025.
Questions about 2120 Mapes Avenue
Who owns 2120 Mapes Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2120 Mapes Ave Hsing.
Does 2120 Mapes Avenue have violations?
Yes. NYC HPD has recorded 137 housing violations at this property.
Is 2120 Mapes Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2120 Mapes Avenue built?
City records list 1914 as the year it was built.
How many apartments are in 2120 Mapes Avenue?
It has 29 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.