670 Oakland Place
Bronx, NY 10457BBL 2-03080-0063Map
Owner of record: 670 Oakland Pl LLC
670 Oakland Place is a two-family home built in 1930 in Bronx, 10457. It has 2 residential units across 2 floors. The owner of record is 670 Oakland Pl LLC. HPD has recorded 86 housing violations here, most recently on February 20, 2026. 41 of the 50 most recent violations are still open.
- HPD violations
- 86
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 33
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 86
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Feb 20, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood staircase stringers at cellar
Feb 12, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire on the dual braker box at the west wall at cellar
Feb 12, 2026
Open — Nov sent out - CImmediately hazardous
Replace with new the missing metal dual electrical breaker box covers at cellar
Feb 12, 2026
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at the wash basin in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Feb 12, 2026 · Apt 1
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures at the washbasin in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Feb 12, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of hot water exceeding 130 degrees at all hot water fixtures in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Feb 12, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Feb 12, 2026 · Apt 2
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at the bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Feb 12, 2026 · Apt 2
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures at the bath tub in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Feb 12, 2026 · Apt 2
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Abate the nuisance consisting of hot water exceeding 130 degrees at all hot water fixtures in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Feb 12, 2026 · Apt 2
Open — Nov sent out - IInformation / order
The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for the entire building under vacate order number 260430, date 02/10/2026
Feb 10, 2026
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures .... in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Feb 8, 2026 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures ... in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Feb 8, 2026 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of hot water exceeding the maximum temperture of 130 degrees in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Feb 8, 2026 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at south wall in the bathroom located at apt 1, 1st story
Feb 8, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the bathroom located at apt 1, 1st story
Feb 8, 2026 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq. ft. at west wall and window in the bathroom located at apt 1, 1st story
Feb 8, 2026 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective spring balance at upper sash, at 1st and 2nd windows from north at east wall in the 1st room from north located at apt 1, 1st story
Feb 8, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at upper sash, at 1st, and 2nd windows from west at north wall in the 1st room from north located at apt 1, 1st story
Feb 8, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Feb 8, 2026
Open — Nov sent out - CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Feb 8, 2026 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Feb 8, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective concrete and ceramic floor tiles at vestibule area at public hall, 1st story
Oct 17, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective locking assembly at building entrance door , 1st story
Aug 14, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door frame, 1st closet from west at north wall door, west wall in the 3rd room from north at east located at apt 2, 2nd story, 1st apartment from north at east
Jun 18, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
Refit the door in the entrance located at apt 2, 2nd story, 1st apartment from north at east
Jun 18, 2024 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of vermin waterbugs in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jun 18, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jun 18, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, north wall, west wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from north at east
Jun 18, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Jun 18, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st window frame from south at west wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Jun 18, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, east wall in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from north at east
Jun 18, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st door frame from east at south wall in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from north at east
Jun 18, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door in the foyer located at apt 2, 2nd story, 1st apartment from north at east
Jun 18, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall, west wall in the foyer located at apt 2, 2nd story, 1st apartment from north at east
Jun 18, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, south wall, 1st wall cabinet from west at north wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Jun 18, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from south at west wall in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from north at east
Jun 18, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall, 1st door from south at west wall in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from north at east
Jun 18, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall, ceiling in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from north at east
Jun 18, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall, 1st window sash from south at west wall, 1st closet from south at west wall door frame in the foyer located at apt 2, 2nd story, 1st apartment from north at east
Jun 18, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, 1st wall cabinet from west at north wall, west wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Jun 18, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from north at east
Jun 18, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the 3rd room from north at east located at apt 2, 2nd story, 1st apartment from north at east
Jun 18, 2024 · Apt 2
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2023
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Dec 27, 2022 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Dec 27, 2022 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling, west & south walls in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Dec 27, 2022 · Apt 1
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Dec 27, 2022 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Dec 27, 2022 · Apt 1
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Apartment only
Feb 7, 2026 · Apt 2NDFLO
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt 2
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 6, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Feb 1, 2026 · Apt 2FLOOR
Close - Heat/hot water
Apartment only
Oct 16, 2025 · Apt 2FL
Close - Heat/hot water
Apartment only
Jan 15, 2025 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Jan 9, 2025 · Apt 2NDFLO
Close - Heat/hot water
Entire building
Jan 8, 2025 · Apt BLDG
Close - General
Cabinet
Jun 15, 2024 · Apt 2
Close
Show 23 more ↓
- Door/window
Door
Jun 15, 2024 · Apt 2
Close - Unsanitary condition
Mold
Jun 15, 2024 · Apt 2
Close - Plumbing
Water supply
Jun 15, 2024 · Apt 2
Close - Door/window
Door
Jun 15, 2024 · Apt 2
Close - Heat/hot water
Apartment only
Dec 26, 2022 · Apt 1
Close - Water leak
Heavy flow
Dec 26, 2022 · Apt 1
Close - Door/window
Window frame
Dec 26, 2022 · Apt 1
Close - Paint/plaster
Ceiling
Dec 26, 2022 · Apt 1
Close - Heat/hot water
Apartment only
Dec 25, 2022 · Apt 2
Close - Water leak
Heavy flow
Oct 21, 2022 · Apt 1
Close - Plumbing
Radiator
Oct 21, 2022 · Apt 1
Close - Paint/plaster
Ceiling
Oct 21, 2022 · Apt 1
Close - Unsanitary condition
Mold
Oct 21, 2022 · Apt 1
Close - Paint/plaster
Ceiling
Oct 21, 2022 · Apt 1
Close - Water leak
Slow leak
Oct 21, 2022 · Apt 1
Close - Flooring/stairs
Floor
Oct 21, 2022 · Apt 1STFLO
Close - Flooring/stairs
Floor
Oct 21, 2022 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Mar 5, 2020 · Apt 2
Close - Heat/hot water
Apartment only
Dec 22, 2019 · Apt 1
Close - Electric
Wiring
Dec 22, 2019 · Apt 1
Close - Door/window
Window frame
Dec 22, 2019 · Apt 1
Close - Electric
Wiring
Dec 22, 2019 · Apt 1
Close - Heat/hot water
Apartment only
Nov 16, 2019 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1930
- Floors
- 2
- Residential units
- 2
- Building area
- 2,030 ft²
- Lot area
- 2,500 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 3080 / 63
- Assessed value
- $45,720
- Landmark / historic district
- No
HPD registration #713063, last renewed Jul 8, 2025.
Questions about 670 Oakland Place
Who owns 670 Oakland Place?
The owner of record in NYC Department of City Planning PLUTO data is 670 Oakland Pl LLC.
Does 670 Oakland Place have violations?
Yes. NYC HPD has recorded 86 housing violations at this property.
Is 670 Oakland Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 670 Oakland Place built?
City records list 1930 as the year it was built.
How many apartments are in 670 Oakland Place?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.