roofy

670 Oakland Place

Bronx, NY 10457BBL 2-03080-0063Map

Owner of record: 670 Oakland Pl LLC

670 Oakland Place is a two-family home built in 1930 in Bronx, 10457. It has 2 residential units across 2 floors. The owner of record is 670 Oakland Pl LLC. HPD has recorded 86 housing violations here, most recently on February 20, 2026. 41 of the 50 most recent violations are still open.

HPD violations
86
DOB violations
0
ECB violations
0
HPD complaints
33

What to know

Concern
16 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Feb 20, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 86

  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Feb 20, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood staircase stringers at cellar

    Feb 12, 2026

    Open — Nov sent out
  • C

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire on the dual braker box at the west wall at cellar

    Feb 12, 2026

    Open — Nov sent out
  • C

    Replace with new the missing metal dual electrical breaker box covers at cellar

    Feb 12, 2026

    Open — Nov sent out
  • B

    Provide adequate supply of hot water for the fixtures at the wash basin in the bathroom located at apt 1, 1st story, 1st apartment from east at south

    Feb 12, 2026 · Apt 1

    Closed — Violation closed
  • B

    Provide adequate supply of cold water for the fixtures at the washbasin in the bathroom located at apt 1, 1st story, 1st apartment from east at south

    Feb 12, 2026 · Apt 1

    Open — Nov sent out
  • C

    Abate the nuisance consisting of hot water exceeding 130 degrees at all hot water fixtures in the kitchen located at apt 1, 1st story, 1st apartment from east at south

    Feb 12, 2026 · Apt 1

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Feb 12, 2026 · Apt 2

    Open — Nov sent out
  • B

    Provide adequate supply of hot water for the fixtures at the bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from north at east

    Feb 12, 2026 · Apt 2

    Closed — Violation closed
  • B

    Provide adequate supply of cold water for the fixtures at the bath tub in the bathroom located at apt 2, 2nd story, 1st apartment from north at east

    Feb 12, 2026 · Apt 2

    Closed — Violation closed
Show 40 more ↓
  • C

    Abate the nuisance consisting of hot water exceeding 130 degrees at all hot water fixtures in the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    Feb 12, 2026 · Apt 2

    Open — Nov sent out
  • I

    The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for the entire building under vacate order number 260430, date 02/10/2026

    Feb 10, 2026

    Closed — Violation closed
  • C

    Provide adequate supply of cold water for the fixtures .... in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east

    Feb 8, 2026 · Apt 2FL

    Closed — Violation closed
  • C

    Provide adequate supply of hot water for the fixtures ... in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east

    Feb 8, 2026 · Apt 2FL

    Closed — Violation closed
  • C

    Abate the nuisance consisting of hot water exceeding the maximum temperture of 130 degrees in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east

    Feb 8, 2026 · Apt 2FL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at south wall in the bathroom located at apt 1, 1st story

    Feb 8, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at south wall in the bathroom located at apt 1, 1st story

    Feb 8, 2026 · Apt 1

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 sq. ft. at west wall and window in the bathroom located at apt 1, 1st story

    Feb 8, 2026 · Apt 1

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective spring balance at upper sash, at 1st and 2nd windows from north at east wall in the 1st room from north located at apt 1, 1st story

    Feb 8, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective spring balance at upper sash, at 1st, and 2nd windows from west at north wall in the 1st room from north located at apt 1, 1st story

    Feb 8, 2026 · Apt 1

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings

    Feb 8, 2026

    Open — Nov sent out
  • C

    § 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east

    Feb 8, 2026 · Apt 2FL

    Closed — Violation closed
  • C

    § 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Feb 8, 2026 · Apt 1

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective concrete and ceramic floor tiles at vestibule area at public hall, 1st story

    Oct 17, 2025

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective locking assembly at building entrance door , 1st story

    Aug 14, 2024

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door frame, 1st closet from west at north wall door, west wall in the 3rd room from north at east located at apt 2, 2nd story, 1st apartment from north at east

    Jun 18, 2024 · Apt 2

    Open — Nov sent out
  • A

    Refit the door in the entrance located at apt 2, 2nd story, 1st apartment from north at east

    Jun 18, 2024 · Apt 2

    Open — Nov sent out
  • B

    Abate the infestation consisting of vermin waterbugs in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Jun 18, 2024 · Apt 2

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Jun 18, 2024 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, north wall, west wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from north at east

    Jun 18, 2024 · Apt 2

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east

    Jun 18, 2024 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st window frame from south at west wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east

    Jun 18, 2024 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, east wall in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from north at east

    Jun 18, 2024 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st door frame from east at south wall in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from north at east

    Jun 18, 2024 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door in the foyer located at apt 2, 2nd story, 1st apartment from north at east

    Jun 18, 2024 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall, west wall in the foyer located at apt 2, 2nd story, 1st apartment from north at east

    Jun 18, 2024 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, south wall, 1st wall cabinet from west at north wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    Jun 18, 2024 · Apt 2

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from south at west wall in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from north at east

    Jun 18, 2024 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the west wall, 1st door from south at west wall in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from north at east

    Jun 18, 2024 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall, ceiling in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from north at east

    Jun 18, 2024 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall, 1st window sash from south at west wall, 1st closet from south at west wall door frame in the foyer located at apt 2, 2nd story, 1st apartment from north at east

    Jun 18, 2024 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the east wall, 1st wall cabinet from west at north wall, west wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    Jun 18, 2024 · Apt 2

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from north at east

    Jun 18, 2024 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the 3rd room from north at east located at apt 2, 2nd story, 1st apartment from north at east

    Jun 18, 2024 · Apt 2

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 27, 2023

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east

    Dec 27, 2022 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from north at east

    Dec 27, 2022 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling, west & south walls in the bathroom located at apt 1, 1st story, 1st apartment from north at east

    Dec 27, 2022 · Apt 1

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Dec 27, 2022 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east

    Dec 27, 2022 · Apt 1

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Heat/hot water

    Apartment only

    Feb 7, 2026 · Apt 2NDFLO

    Close
  • Heat/hot water

    Entire building

    Feb 7, 2026 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Feb 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 6, 2026 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2026 · Apt 2FLOOR

    Close
  • Heat/hot water

    Apartment only

    Oct 16, 2025 · Apt 2FL

    Close
  • Heat/hot water

    Apartment only

    Jan 15, 2025 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Jan 9, 2025 · Apt 2NDFLO

    Close
  • Heat/hot water

    Entire building

    Jan 8, 2025 · Apt BLDG

    Close
  • General

    Cabinet

    Jun 15, 2024 · Apt 2

    Close
Show 23 more ↓
  • Door/window

    Door

    Jun 15, 2024 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Jun 15, 2024 · Apt 2

    Close
  • Plumbing

    Water supply

    Jun 15, 2024 · Apt 2

    Close
  • Door/window

    Door

    Jun 15, 2024 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Dec 26, 2022 · Apt 1

    Close
  • Water leak

    Heavy flow

    Dec 26, 2022 · Apt 1

    Close
  • Door/window

    Window frame

    Dec 26, 2022 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Dec 26, 2022 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Dec 25, 2022 · Apt 2

    Close
  • Water leak

    Heavy flow

    Oct 21, 2022 · Apt 1

    Close
  • Plumbing

    Radiator

    Oct 21, 2022 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Oct 21, 2022 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Oct 21, 2022 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Oct 21, 2022 · Apt 1

    Close
  • Water leak

    Slow leak

    Oct 21, 2022 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Oct 21, 2022 · Apt 1STFLO

    Close
  • Flooring/stairs

    Floor

    Oct 21, 2022 · Apt 1STFLO

    Close
  • Heat/hot water

    Apartment only

    Mar 5, 2020 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Dec 22, 2019 · Apt 1

    Close
  • Electric

    Wiring

    Dec 22, 2019 · Apt 1

    Close
  • Door/window

    Window frame

    Dec 22, 2019 · Apt 1

    Close
  • Electric

    Wiring

    Dec 22, 2019 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2019 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B2)
Year built
1930
Floors
2
Residential units
2
Building area
2,030 ft²
Lot area
2,500 ft²
Zoning
R7-1
Community board
206
Council district
15
Block / lot
3080 / 63
Assessed value
$45,720
Landmark / historic district
No

HPD registration #713063, last renewed Jul 8, 2025.

Questions about 670 Oakland Place

Who owns 670 Oakland Place?

The owner of record in NYC Department of City Planning PLUTO data is 670 Oakland Pl LLC.

Does 670 Oakland Place have violations?

Yes. NYC HPD has recorded 86 housing violations at this property.

Is 670 Oakland Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 670 Oakland Place built?

City records list 1930 as the year it was built.

How many apartments are in 670 Oakland Place?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.