roofy

East 182nd Street

Bronx, NY 10457BBL 2-03063-0152Map

Owner of record: Ag-Spaxel 16 Wade Property Owner, L.l.c.

East 182nd Street is an elevator apartment building built in 2022 in Bronx, 10457. It has 74 residential units across 8 floors. The owner of record is Ag-Spaxel 16 Wade Property Owner, L.l.c.. HPD has recorded 8 housing violations here, most recently on September 20, 2026. 6 of the 8 most recent violations are still open.

HPD violations
8
DOB violations
4
ECB violations
33
HPD complaints
13

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 20, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 8

  • C

    Replace or repair the self-closing doors that is missing or defective hinges at compactor closet at public hall, 5th story

    Sep 20, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system signage missing information at public hall, 1st story

    Sep 9, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 9, 2026

    Open — Nov sent out
  • C

    Provide a safe and adequate supply of electric service to the fixtures to all power outlets abd fixtures throughout apt in the entire apartment located at apt 7f, 7th story, 1st apartment from north at east

    Aug 21, 2026 · Apt 7F

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective mortise lock and assembly in the entrance located at apt 7f, 7th story, 1st apartment from north at east

    Aug 21, 2026 · Apt 7F

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 11, 2026

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system locked door at boiler room

    Mar 17, 2026

    Open — Invalid certification
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2j, 2nd story, 1st apartment from east at south , section at east

    Mar 17, 2026 · Apt 2J

    Open — Invalid certification

DOB building violations · 4

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 3, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 7, 2024

    Dob violation - dismissed
  • Construction other optional

    Vio23-50301

    Nov 14, 2023

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2023

    Dob violation - dismissed

ECB violations · 33

  • Class - 1

    Failure to maintain adequate housekeeping per section requirement. as noted: at time of inspection at an active jobsite of a proposed 8 story building already at the bulkhead 1st exposure inside the building 1s

    Mar 26, 2025 · Penalty $2,500

    Resolve
  • Class - 1

    3301.5 unsafe conditions- supported scaffold installed @ multiple locations & missing full row of cross-braces @ expo1 & make-shift scaffold opening between sidewalk shed and facade leading into a drop approx.

    Sep 27, 2024 · Penalty $5,000

    Resolve
  • Class - 2

    Observed sidewalk shed installed at exposure 1 of jobsite. the she dis over loaded with lard amounts of construction debris & materials. upon review of the approved plan for the shed it does not or show locatio

    Sep 27, 2024 · Penalty $2,400

    Resolve
  • Class - 2

    Observed sidewalk shed at exposures 1, 2, and 3 of jobsite. asked competent person for the daily pre-shift inspection log, i was told no they do not have it. all temporary equipment are to have daily pre-shift

    Feb 15, 2024

    Resolve
  • Class - 2

    Observed @ exposure 2 pedestrian sidewalk curb, a diesel generator with wiring that goes into the jobsite from the top of the sidewalk shed. asked competent person if they had the department of transportation p

    Feb 15, 2024

    Resolve
  • Class - 1

    Failure to safe guard all persons & property affected by construction operations. a time of inspection during curtain wall operations at expo#3/4 workers detached 2 sections of panels where worker "bismarck mai

    Nov 11, 2023 · Penalty $25,000

    Resolve
  • Class - 1

    Unsafe storage of combustible material and equipment. at time of inspection observed at 5th floor 2x plastic containers 1x red and 1x yellow filled with combustible/flammable gasoline/diesel stored out in open.

    Nov 11, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    Permit holder failed to ensure worker's attend pre-shift safety meeting prior to commencement of work. at time of inspection observed at 5th floor exterior curtain wall install in progress where worker at 5th f

    Nov 11, 2023 · Penalty $5,000

    Resolve
  • Class - 1

    At time of inspection at new 8 story building currently at 5th story level i observed missing handrails at permanent stairs to help prevent fall and injury, creating a hazardous condition for workers and person

    Nov 11, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    Bc 3301.6: failure to provide design drawings. at time of inspection i observed platforms erected inside elevator shafts upon request to see design drawings none were provided creating a hazardous collapsing co

    Nov 11, 2023 · Penalty $2,500

    Resolve
Show 23 more ↓
  • Class - 1

    At time of inspection where worker had a fatal fall from 5th story while hoisting exterior panels upon request to see workers site- specific orientation to verify worker was properly informed and trained regard

    Nov 11, 2023 · Penalty $5,000

    Resolve
  • Class - 2

    Bc 3316.9.2 certification or training: worker fell while installing panels on 11-11-23. inspection revealed knuckle boom crane was on site erecting panels for operation. inspection also revealed that the crew i

    Nov 11, 2023 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to institute/maintain safety measures or temporary construction-no guard rails. at time of inspection observed at 5th fl. expo# 3/4 missing sections of guard rail along with stairs (worker travel path)

    Nov 11, 2023 · Penalty $25,000

    Resolve
  • Class - 1

    Bc 3307.2.1 temporary public walkway in street: at time of inspection i observed jobsite fence installed blocking pedestrian walkway on sidewalk and a temporary walkway was provided in roadway that was contrary

    Nov 11, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    No site safety plan. at time of inspection premises under nb# 210181925 for an 8 story buildings no site safety plan provided at time of inspection. inspection due to worker fatality., maintain/display required

    Nov 11, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    Bc 3307.6.2 sidewalk shed required. building approximately 90 feet in height at 5th story level and 16 feet setback from walkway/pathway and sidewalk at exposure 1 and 2 . i observed that there was no sidewalk

    Nov 11, 2023 · Penalty $10,000

    Resolve
  • Class - 1

    At time of inspection i observed missing stair infills at permanent stairs in numerous locations from 1st to 5th floor level. failure to provide and maintain infills creates a hazardous trip and fall condition

    Nov 11, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    Worker fell while installing panels on 11-11-23. inspection revealed that a knuckle boom crane was on site erecting and installing panels for operation without approval or inspection and was working outside of

    Nov 11, 2023 · Penalty $5,000

    Resolve
  • Class - 1

    Worker fell while installing panels on 11-11-23. inspection revealed that knuckle boom crane was on site erecting and installing panels for operation and operator of the knuckle boom crane did not hold a valid

    Nov 11, 2023 · Penalty $5,000

    Resolve
  • Class - 2

    At time of my inspection observed that the property at exposure #4 ( 588 east 182nd street ) did not have roof protection nor overhead protection at rear of property as stipulated on the site safety plan ( ssp

    May 8, 2023 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain/display onsite doc required by bcch33.atoi i observed proposed 8stynb currently@excavation phase w/work activity present.it was also observed that contractor failed to provide valid dot perm

    May 11, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Work doesnt conform to approved doc const &or approved amendments-workcontrary to soe plans(support of excavation) noted:atoi of proposed8stynb,for soe/foundation work on active site.i observed@exp1 work in pla

    Mar 7, 2022 · Penalty $625

    Resolve
  • Class - 1

    Failure to provide proper drainage of excavation-dewatering process not adequate at exp.#2/no dep permits on site.noted:at time of inspection of a proposed 8 story nb,at soe/foundation phase.i observed a dewate

    Mar 7, 2022 · Penalty $2,500

    Resolve
  • Class - 2

    Const super failed to perform duties as per code-inadequate cs logbookonsite-site conditions noted:atoi of proposed 8stynb active jobsite@soe/foundation phase.i observed following unsafe site conditions.(1)work

    Mar 7, 2022 · Penalty $625

    Resolve
  • Class - 2

    Work doesnt conform to approved const docs &or approved amendments-work contrary to ssp noted:atoi of proposed 8stynb active jobsite@soe/foundation phase.i observed overhead protection in place@adj property@exp

    Mar 7, 2022 · Penalty $625

    Resolve
  • Class - 1

    Failure to maintain/display onsite documents required by bc chapter 33.at time of inspection of active proposed 8 story new building at foundation phase requested from competent person pre-construction survey l

    Dec 6, 2021 · Penalty $625

    Resolve
  • Class - 1

    28.401.4.illegally engaging in business or occupations w/o required license.at time of inspection of proposed 8 story new building at foundation phase active job site with aprox 12 workers and logs maintain for

    Dec 6, 2021 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to notify con edison before work near or on gas line.note:at the time of incident type inspection as per competent person on site,broke gas line while doing excavation work.con edison came after inciden

    Nov 9, 2021

    Resolve
  • Class - 1

    Work does not conform to approved design drawing onsite.note:at the time of incident type inspection as per competent person onsite.broke gas line while doing excavation work.con edison came after incident & re

    Nov 9, 2021

    Resolve
  • Class - 2

    Full demolition via dob application# 220730911: as a result of rain water accumulation in excavation pit at exposure#2 excessive water penetration and accumulation at adjacent building's cellar at 588 east 182

    Sep 10, 2021

    Resolve
  • Class - 1

    Failure to provide required notification prior to commencement of demolition.at time of inspection of 2 story demolition in which house is no longer in place observed through bis (buildings info system)no notif

    Aug 17, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to provide required notification prior to commencement of demolition.at time of inspection of 2 story demolition where house is no longer in place observed through bis(buildings info system)no notificat

    Aug 17, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to provide required notification prior to commencement of demolition.at time of inspection of 2 story demolition where house is no longer in place obeserved through bis (buildings info system)that no no

    Aug 17, 2021 · Penalty $2,500

    Resolve

Complaints

  • Electric

    Power outage

    Oct 8, 2026 · Apt 7G

    Close
  • Safety

    Window guard broken/missing

    Sep 17, 2026 · Apt 5D

    Close
  • Unsanitary condition

    Mold

    Sep 17, 2026 · Apt 5D

    Close
  • Unsanitary condition

    Pests

    Sep 17, 2026 · Apt 5D

    Close
  • Paint/plaster

    Wall

    Sep 17, 2026 · Apt 5D

    Close
  • Appliance

    Refrigerator

    Sep 7, 2026 · Apt 6K

    Close
  • Unsanitary condition

    Pests

    Sep 7, 2026 · Apt 6K

    Close
  • Electric

    Power outage

    Aug 19, 2026 · Apt 7F

    Close
  • Heat/hot water

    Entire building

    Mar 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 18, 2026 · Apt 6I

    Close
Show 3 more ↓
  • Heat/hot water

    Entire building

    Mar 17, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 16, 2026 · Apt 2J

    Close
  • Heat/hot water

    Apartment only

    Mar 13, 2026 · Apt 6I

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D7)
Year built
2022
Floors
8
Residential units
74
Building area
59,102 ft²
Lot area
12,661 ft²
Zoning
R7-1
Community board
206
Council district
15
Block / lot
3063 / 152
Assessed value
$5,518,350
Landmark / historic district
No

HPD registration #229394, last renewed Nov 18, 2025.

Questions about East 182nd Street

Who owns East 182nd Street?

The owner of record in NYC Department of City Planning PLUTO data is Ag-Spaxel 16 Wade Property Owner, L.l.c..

Does East 182nd Street have violations?

Yes. NYC HPD has recorded 8 housing violations at this property.

Is East 182nd Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was East 182nd Street built?

City records list 2022 as the year it was built.

How many apartments are in East 182nd Street?

It has 74 residential units and 75 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.