roofy

500 East 185th Street

Bronx, NY 10458BBL 2-03053-0028Map

Owner of record: Ratan Realty LLC, A Nj Limited Liability Corp

500 East 185th Street is a hotel built in 2018 in Bronx, 10458. The owner of record is Ratan Realty LLC, A Nj Limited Liability Corp. HPD has recorded 6 housing violations here, most recently on March 4, 2025.

HPD violations
6
DOB violations
6
ECB violations
47
HPD complaints
9

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Mar 4, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 6

  • C

    Provide hot water at all hot water fixtures in the 1st room from east located at b-room 313, 3rd story, 1st b-room from north at east

    Mar 4, 2025 · Apt 313

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the 1st other from north located at sro, 1st story, 2nd single room occupancy from east at south

    Feb 4, 2025

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of excessive hot water supply exceeding 130f degrees at bathroom and kitchen fixtures in the entire apartment located at apt 601, 6th story, 1st apartment from east at south

    Jan 14, 2025 · Apt 601

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 601, 6th story, 1st apartment from east at south

    Jan 14, 2025 · Apt 601

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 201, 2nd story, 2nd apartment from north at east

    Apr 10, 2024 · Apt 201

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 3, 2023

    Closed — Violation dismissed

DOB building violations · 6

  • Construction other optional

    Property affected by hazardous condition at adjacent property severely deteriorated retaining wall with step-cracking located at 2325 bathgate ave at exposure #3, (rear/back yard) a pvo will issued for the safety of 510 east 185th street bronx rear garage & surface lot within 10ft of exp 3 property line

    Aug 28, 2024

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2023

    Jun 23, 2024

    Dob violation - dismissed
  • Construction other optional

    Additional information-based on ceu's audit mt. fei zeng, pe from z&t engineering pc performed the tr1 inspections of the masonry and conc cast-in-place. mr fei zeng is asked to submit all the tr1 reports to ceu for review. remedy: please submit all required construction documents to ceu for review no later than 12/16/2020

    Dec 9, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2017

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Oct 11, 2016

    Vp*-violation unserved ecb- dismissed

ECB violations · 47

  • Class - 1

    Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code. observed hole penetrations. hvac in ceiling hole is covered with vent cover. vent

    Aug 14, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    : failure to maintain building in code compliant manner. upon inspection, the device is found to be out of service. remedy: restore to service and call the dob elevator division at (212) 393-2144 for a re-inspe

    Aug 28, 2024 · Penalty $1,562

    Resolve
  • Class - 1

    I observed in the water meter room the failure to install the main electrical ground., provide grounding; install ground as required.

    Aug 26, 2024 · Penalty $4,800

    Resolve
  • Class - 1

    I observed in the 4th floor electrical closet the installation of data equipment , and wiring. as per the code no equipment other than electrical distribution shall be installed in any electrical closets. also

    Aug 26, 2024 · Penalty $1,200

    Resolve
  • Class - 2

    I observed in the branch circuit wiring, disconnect switch, conduits, and devices for the installation of a new food warmer and outlet for a second warming tray in the kitchen. no permit on file in dob records

    Aug 26, 2024

    Resolve
  • Class - 2

    I observed on the roof the unsupported raceway supplying power to the a.c. condenser., secure/support per ec; support raceways as required.

    Aug 26, 2024

    Resolve
  • Class - 2

    Unsecured ripped advertizement sign is detached and hanging off front of building., repair and/or replace

    Aug 26, 2024

    Resolve
  • Class - 2

    Emergency exit door does not self-close located at ground level, exposure #1., repair/replace door

    Aug 26, 2024

    Resolve
  • Class - 2

    Observed in the mechanical room housing the gas fired water heater has excessive combustible storage., repair and/or replace

    Aug 26, 2024

    Resolve
  • Class - 2

    Foam stucco pieces cracked, detached, hanging from facade located elevator room roof level., repair and/or replace

    Aug 26, 2024 · Penalty $312

    Resolve
Show 37 more ↓
  • Class - 2

    Hole penetration with pipes and wires running through located at rpz mechanical room, ground level., provide/maintain fire stopping

    Aug 26, 2024 · Penalty $625

    Resolve
  • Class - 2

    Observed temporary caps( red plastic) installed throughout building on the hose valves., repair and/or replace

    Aug 26, 2024

    Resolve
  • Class - 2

    I observed on the roof level stairs the installation of flexible metallic conduits through the concrete wall. as per ecb 348.12 fmc shall not be used through concrete walls; ec 348.12, comply with ec code; used

    Aug 26, 2024

    Resolve
  • Class - 2

    Repair emergency phone, repair emergency light cover inside elevator, repair motor room door handle

    Feb 16, 2024

    Resolve
  • Class - 1

    Bc 3301.1.1 responsibility for safety: failure to institute adeqaute safety measures. work removing rotecting guard from the grinder and no hard hat. this is hazardous to worker.rem: comply with code.

    Dec 7, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Bc 3307.6.4.5 failure to maintain sidewalk shed in a code compliant manner.at time of inspection ,i observed that a sidewalk shed bride,papapet was installed at exposure#2(bathgate ave)near an adjacent property

    Oct 4, 2019

    Resolve
  • Class - 2

    Failure to provide sidewalk shed parapet panel sinage and content.at time of inspection a sidewalk shed was installed at exposure#1(east 185st) and aj exposure#2 bath gate avenue).however the singage for contra

    Oct 4, 2019

    Resolve
  • Class - 2

    Jobsite fence not constructed or maintained pursuant to sub-section.attime of inspection it was observed that a fence was installed at rear exposure#3.however, the fence was collapsing inadequately braced,leani

    Oct 4, 2019

    Resolve
  • Class - 1

    Inadequate guardrails at openings throughout site.at the time of my inspection of an active construction site,i observed missing guardrails on various fls.guardrails are required as per code to protect/prevent

    May 29, 2019 · Penalty $5,000

    Resolve
  • Class - 1

    No/inadequate handrails throughout stairs on construction site.at timeof inspection on an active construction site, 6 storied nb,noticed inadequate or missing handrails throughout stairs on construction site,th

    May 29, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to safeguard.at the time of my inspection of a 6 storied nb under construction,i observed that on all fls.there were holes that werecovered in an inadequate manner.the holes were large enough that a wor

    May 29, 2019 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to institute safety equipment.at the time of my inspection of an active construction site,i observed that there were no handrails onthe stairway on the 1st floor leading to the basement @exp#2.as per co

    May 29, 2019

    Resolve
  • Class - 1

    No/inadequate guardrails at openings throughout site.at time of inspection on an active construction site 6 story nb,noticed at exp#3 of thebld.on the 1st & 2nd fls.at what is to be openings for windows,that th

    May 29, 2019 · Penalty $5,000

    Resolve
  • Class - 1

    Unprotected openings/holes throughout construction site.at time of inspection on an active const.site 6 storied nb,noticed numerous openings/holes throughout the const.site on each fl.,openings large enough tha

    May 29, 2019 · Penalty $10,000

    Resolve
  • Class - 2

    Bc3303.2.3.1.temporary lighting for construction sites at the time of my inspection of a 6 story nb at second floor deck i observed workers on the first floor working/walking around with their cell phone lights

    Dec 13, 2018

    Resolve
  • Class - 1

    Bc 3301.2 uncapped rebars failure to maintain. at the time of inspec tion observed active job site. some workers was working plumbing work at foundation level. uncapped rebards was found at the site throughout

    Oct 4, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Bc3301.7 failure to provide construction documents at jobsite. at time of inspection observed a construction site at foundation stage. responding to a compliant during inspection noted that the adjoining proper

    Sep 10, 2018

    Resolve
  • Class - 2

    Responsibility for safety. at the time of inspeciton of a 6 story new building at foundation level, construction work in progress. i observ ed some cracks above window at walls on the adjacent building at exp3

    Sep 10, 2018

    Resolve
  • Class - 2

    Bc3301.7 failure to provide construction documents at jobsite.at timeof inspection observed a construction site at foundation stage. responding to a complaint during inspection noted that the adjoining propert

    Sep 10, 2018

    Resolve
  • Class - 2

    Sec: bc 3307.2.1. failure to comply w/ dot regulations. note @ time of insp of proposed 6 story new bldg @ foundation/excavation please. observe that there is a full sidewalk closure @ exp#1 w/ netting & wood.

    May 23, 2018

    Resolve
  • Class - 2

    Adequate housekeeping- note: @ time of insp of a proposed 6 story new bldg @ foundation level, observed excessive construction materials- consisting of construction cut-offs, wood & other materials scaffold & p

    May 23, 2018

    Resolve
  • Class - 2

    Job site not maintained. note: @ time of insp of a proposed 6 story new bldg @ foundation level. observed that construction fence erected @ site not maintained fence parked @ exp#4 not maintained- leaning inwar

    May 23, 2018

    Resolve
  • Class - 1

    Sec: bc 3304.4.4. failure to provide 3'6" guardrail system around open & accessible sides of excavation. note @ time of insp of a purposed 6 story new bldg @ excavation/foundation place. observed sides of excav

    May 23, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Bc3313.1 unsafe use of compressed and flammable gas. note: at time of inspection of a proposed 6 story new building at 80 east operations-i observed free standing compressed gas & flammable not secured while we

    Dec 7, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    3313.1 nyc fire code. note: at time of inspection of a proposed 6 story new building installing -------. i observed hot works in progress with no fire watch present. stop all welding/hot works operations. rem:

    Dec 7, 2017 · Penalty $1,600

    Resolve
  • Class - 2

    Sec. 3301-02(d) construction superintendent falls to maintain & or make job site logs available. at the time of inspection it was observed that the john po sheng hsu(construction superintendent)did not property

    Sep 5, 2017

    Resolve
  • Class - 2

    Sec. 3309.4 failure to provide/perform inspection & document conditions of existing structures adjoining a construction or demolition site in a pre construction surbey. at the time of inspection it was observed

    Aug 5, 2017

    Resolve
  • Class - 1

    Sec. 3309.6 failure to monitor adjoining structures for movement in all directions during excavation-related activity that may adversely affect adjoining structures. at the time of inspection it was observed th

    Aug 5, 2017 · Penalty $1,600

    Resolve
  • Class - 2

    Sec. 3309.16 failure to monitor adjoining structures for movement in all directions during excavation related activity that may adversely affect adjoining structures. at the time of inspection it was observed

    Aug 5, 2017 · Penalty $400

    Resolve
  • Class - 2

    Sec. 3304.4.3 failure to provide lot line required construction fence(excavation)at the time of inspection it was observed that the construction fence was missing in the corner of exp#3&4 contractor failed to

    Aug 5, 2017

    Resolve
  • Class - 2

    Failure to designate and or have construction superintendent present at site a required.at time of inspection observed an active construction site with drilling work in progres.during inspection noted that the

    Jul 10, 2017 · Penalty $2,500

    Resolve
  • Class - 2

    Bc3301.2/failure to safeguard all persons and property affected by construction operations.at time of inspection observed an active construction site with drilling work in progress.during inspection noted that

    Jul 10, 2017

    Resolve
  • Class - 2

    Job site fence not constructed pursuant to subsection at time of inspection observed an active construction site with drilling work in progress.during inspection noted that the fence is not straight not secured

    Jul 10, 2017

    Resolve
  • Class - 2

    Altered/changed bldg occupied w/o a valid c of o as per 28-118.3.1 - 28-118.3.2 #201126780-t004 exp 5/9/10. remedy: obtain a valid c of o ordiscontinue illegal occupancy.

    May 21, 2013

    Resolve
  • Class - 2

    Operation of a place of assembly by w/o a current cert of operation. note pa #210084567 approved 12/22/08 no permit issued. remedy: obtain acurrent cert of operation for place of assembly.

    Jan 24, 2009 · Penalty $800

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by the c of o or dob records. note alteration #201126780 approved not sign off to convert warehouse to minimall and carbert. remedy: discontinue illegal use or amend c of o.

    Jan 24, 2009 · Penalty $2,400

    Resolve
  • Non-hazardous

    Work doesn't conform to approved plans non conforming work noted. construction work being, done under permit #201126780-01-al issued 8/31/07expires 8/9/08. non load bearing partitions being erected are contrary

    Apr 2, 2008 · Penalty $130

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Mar 1, 2025 · Apt 313

    Close
  • Heat/hot water

    Entire building

    Feb 3, 2025 · Apt 105

    Close
  • Heat/hot water

    Entire building

    Jan 18, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 12, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Dec 1, 2024 · Apt 408

    Close
  • Door/window

    Window pane

    Oct 17, 2024 · Apt 307

    Close
  • Unsanitary condition

    Pests

    Mar 27, 2024 · Apt 201

    Close
  • Unsanitary condition

    Pests

    Mar 27, 2024 · Apt 201

    Close
  • Heat/hot water

    Entire building

    Jun 23, 2023 · Apt 215

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hotel (H9)
Year built
2018
Floors
6
Residential units
—
Building area
51,878 ft²
Lot area
11,764 ft²
Zoning
M1-4/R7A
Community board
206
Council district
15
Block / lot
3053 / 28
Assessed value
$5,232,150
Landmark / historic district
No

HPD registration #228634, last renewed Jun 5, 2025.

Questions about 500 East 185th Street

Who owns 500 East 185th Street?

The owner of record in NYC Department of City Planning PLUTO data is Ratan Realty LLC, A Nj Limited Liability Corp.

Does 500 East 185th Street have violations?

Yes. NYC HPD has recorded 6 housing violations at this property.

Is 500 East 185th Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 500 East 185th Street built?

City records list 2018 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.