1452 Bryant Avenue
Bronx, NY 10459BBL 2-02999-0024Map
Owner of record: 2533 Grand Reatly Corp
1452 Bryant Avenue is a mixed residential and retail building built in 1931 in Bronx, 10459. It has 5 residential units across 3 floors. The owner of record is 2533 Grand Reatly Corp. HPD has recorded 93 housing violations here, most recently on July 15, 2022. 39 of the 50 most recent violations are still open.
- HPD violations
- 93
- DOB violations
- 15
- ECB violations
- 34
- HPD complaints
- 126
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 93
- BHazardous
Properly repair with similar material the broken or defective 3rd cement tread up from bottom at building entrance at stoop, 1st story
Jul 15, 2022
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north
Jan 14, 2022 · Apt 3B
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 3 sq ft at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east original violation 14467945 issued 28-jul-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jul 28, 2021 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Properly repair the source and abate the evidence of a water leak the ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Jul 28, 2021 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Jul 28, 2021 · Apt 2
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 3 sq ft at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Jul 28, 2021 · Apt 2
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jul 22, 2021
Open — Info nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective concrete steps # 2 and # 3 from bottom at front area street to entrance to building at public hall stairs
Jul 20, 2021
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance at lower sash in the bathroom located at apt 3rdflo, 3rd story, 1st apartment from north at east
Sep 21, 2020 · Apt 3RDFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 3rdflo, 3rd story, 1st apartment from north at east
Sep 21, 2020 · Apt 3RDFLO
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of rodents evidence of rat drop in the entire apartment located at apt 3rdflo, 3rd story, 1st apartment from north at east
Sep 21, 2020 · Apt 3RDFLO
Open — Notice of issuance sent to tenant - BHazardous
Replace with new the broken or defective base cabinet at sink in the kitchen located at apt 3rdflo, 3rd story, 1st apartment from north at east
Sep 21, 2020 · Apt 3RDFLO
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective. located at apt 1, 1st story, 1st apartment from west at north
Mar 4, 2020 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at south wall. approx. 6 sq. ft. in the bathroom located at apt 1, 1st story, 1st apartment from west at north original violation 13582732 issued 31-jan-20 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jan 31, 2020 · Apt 1
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the nuisance consisting of protrucing nails at underside of handrail at public hall stairs, 1st story
Jan 31, 2020
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood flooring at bathroom creating trip hazard in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Jan 31, 2020 · Apt 1
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 1, 1st story, 1st apartment from west at north
Jan 31, 2020 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of hot water not to exceed 130 degrees in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Jan 31, 2020 · Apt 1
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at south wall. approx. 6 sq. ft. in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Jan 31, 2020 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Jan 31, 2020 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood ballusters (2) creating cut hazard at public hall, 1st story
Jan 31, 2020
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Jan 16, 2020 · Apt 1
Closed — Violation closed - BHazardous
Discontinue the rooming unit #4, firts room at north, accupied unknown located at apt 1, 1st story, 1st apartment from west at north
Jan 16, 2020 · Apt 1
Open — Nov sent out - BHazardous
Discontinue the rooming unit room north/west 1 occupied by one adult in the 1st room from north located at apt 2, 2nd story, 1st apartment from west at north
Jan 16, 2020 · Apt 2
Open — Nov sent out - BHazardous
Discontinue the rooming unit room north 3 occupied by one person in the 1st room from north located at apt 2, 2nd story, 1st apartment from west at north
Jan 16, 2020 · Apt 2
Open — Nov sent out - BHazardous
Discontinue the rooming unit room north 2 occupied by one adult in the 1st room from north located at apt 2, 2nd story, 1st apartment from west at north
Jan 16, 2020 · Apt 2
Open — Nov sent out - BHazardous
Discontinue the rooming unit room north one occupied by one adult in the 1st room from north located at apt 2, 2nd story, 1st apartment from west at north
Jan 16, 2020 · Apt 2
Open — Nov sent out - BHazardous
§ 9, 170, 171, 300, 301, 302 m.d.law-file plans and application and obtain a certificate of occupancy to legalize the conversion from a private dwelling to multiple dwelling use if lawfully feasible or restore to lawful occupancy located at apt 1, 1st story, 1st apartment from west at north
Jan 16, 2020 · Apt 1
Open — Nov sent out - BHazardous
Discontinue the rooming unit #3, 2nd room at south, occupied by one adult located at apt 1, 1st story, 1st apartment from west at north
Jan 16, 2020 · Apt 1
Open — Nov sent out - BHazardous
Discontinue the rooming unit #2, first room at west, occupied by one adult located at apt 1, 1st story, 1st apartment from west at north
Jan 16, 2020 · Apt 1
Open — Nov sent out - BHazardous
Discontinue the rooming unit #1 , first room at east, occupied by one adult located at apt 1, 1st story, 1st apartment from west at north
Jan 16, 2020 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Jan 16, 2020 · Apt 1
Closed — Violation closed - ANon-hazardous
Replace with new the missing door at entrance to 1st sty public hall at public hall, 1st story
Jan 4, 2020
Open — Nov sent out - ANon-hazardous
Replace with new the missing wood balisters 13th ,14th . 15th and 18th up from bottom at public hall stairs, 3rd story
Jan 4, 2020
Open — Nov sent out - ANon-hazardous
Replace with new the missing wall plate over electric outlets at north wall at public hall, 2nd story
Jan 4, 2020
Open — Nov sent out - ANon-hazardous
Replace with new the missing wood treads 1st ,2nd 3rd , and 4th up from bottom at public hall stairs. at public hall, 2nd story
Jan 4, 2020
Open — Nov sent out - ANon-hazardous
Replace with new the missing wood balister 4th & 5th up from bottom at public hall stairs, 1st story
Jan 4, 2020
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective all concrete treads at stoop, 1st story
Jan 4, 2020
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Dec 18, 2019 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak the ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Dec 18, 2019 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Dec 18, 2019 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical outlet at the north wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from north at east
Dec 18, 2019 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Dec 18, 2019 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective lower window balance at the north wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from north at east
Dec 18, 2019 · Apt 2
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 16, 2019
Open — Info nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Dec 13, 2019 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of scalding hot water exceeding 130f degrees in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Dec 13, 2019 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Dec 13, 2019 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of hot water exceeding maximum temperature of 130 degrees in the kitchen located at apt 3, 3rd story, 1st apartment from north at east
Nov 26, 2019 · Apt 3
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of hot water in excess of 130 degrees f. water temp 156 degrees in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Nov 13, 2019 · Apt 1
Closed — Violation closed
DOB building violations · 15
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 16, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed
Show 5 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 25, 1993
Vpw*-violation unserved ecb-work without permit-dismissed - Unsafe buildings none
Ub-unsafe buildings none
Dec 10, 1992
Dob violation - active
ECB violations · 34
- Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons 39057202z., file a certificate of correction
Apr 20, 2026 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons 39057197n., file a certificate of correction
Apr 20, 2026 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons 39057196l., file a certificate of correction
Apr 20, 2026 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons 39057198p., file a certificate of correction
Apr 20, 2026 · Penalty $6,250
Active - Class - 1
Unlawful acts. failure to comply with commissioner's order for summons 39057199r., comply with commissioner's order
Apr 20, 2026 · Penalty $12,500
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons 39057200p., file a certificate of correction
Apr 20, 2026 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons 39057208j., file a certificate of correction
Apr 20, 2026 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons 39057203k., file a certificate of correction
Apr 20, 2026 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons 39057204m., file a certificate of correction
Apr 20, 2026 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons 39057205y., file a certificate of correction
Apr 20, 2026 · Penalty $6,250
Active
Show 24 more ↓
- Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons 39057206x., file a certificate of correction
Apr 20, 2026 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons 39057207h., file a certificate of correction
Apr 20, 2026 · Penalty $6,250
Active - Class - 1
Residence converted from 2 to 13 families. noted: at 3rd flr rear - front rm created & occupied as a sro with key lock at door, bed, tv, refrigerator, microwave, toiletries, food, personal belongings, shared bt
Mar 1, 2022 · Penalty $70,000
Active - Class - 1
Residence converted from 2 to 13 families. noted: at 2nd flr - front rm created & occupied as a sro with key lock at door, bed, tv, microwave, refrigerator, space heaters, food, toiletries, personal belongings,
Mar 1, 2022 · Penalty $70,000
Active - Class - 1
Residence converted from 2 to 13 families. noted: at 1st flr - rear rm at right created & occupied as a sro with key lock at door, bed, tv, toiletries, refrigerator, toaster oven, personal belongings, shared bt
Mar 1, 2022 · Penalty $70,000
Active - Class - 1
Residence converted from 2 to 13 families. noted: at 3rd flr front - front rm at right created & occupied as a sro with key lock at door, bed, tv, microwave, toiletries, space heater, personal belongings, share
Mar 1, 2022 · Penalty $70,000
Active - Class - 1
Residence converted from 2 to 13 families. noted: at 1st flr - front rm created & occupied as a sro with key locks at door, bed, tv, microwave, refrigerator, food, toiletries, personal belongings, shared bthrm
Mar 1, 2022 · Penalty $70,000
Active - Class - 1
Residence converted from 2 to 13 families. noted: at 1st flr - 2nd rm from rear created & occupied as a sro with key lock at door, bed, tv, toiletries, no windows, personal belongings, shared bthrm & kitchen. a
Mar 1, 2022 · Penalty $70,000
Active - Class - 1
W/o a permit. noted: at 1st flr - full height partition walls erected to create a bthrm & bdrms. water & waste lines installed for 3 pc bthrm; residential sink at kitchen area. electrical wiring installed: 220v
Mar 1, 2022 · Penalty $12,500
Active - Class - 1
Residence converted from 2 to 13 families. noted: at 3rd flr rear - 2nd rm from rear created & occupied as a sro with key lock at door, bed, tv, microwave, refrigerator, toiletries, personal belongings, shared
Mar 1, 2022 · Penalty $70,000
Active - Class - 1
Residence converted from 2 to 13 families. noted: at 2nd flr - 2nd 2nd rm from rear created & occupied as a sro with key lock at door, beds, tv, microwave, refrigerator, food, toiletries, personal belongings, s
Mar 1, 2022 · Penalty $70,000
Active - Class - 1
Failure to maintain building in code compliant manner. noted: at time of inspection - observed missing balusters at interiors stairs between 2nd & 3rd floors, creating a fall hazard., repair and/replace
Mar 1, 2022 · Penalty $6,250
Active - Class - 2
W/o a permit. noted: at 3rd flr - full height partition walls erected to sub-divide level front & rear to change flr layout & create sro conditions. at 2nd flr partitions erected to create sro conditions., obta
Mar 1, 2022 · Penalty $6,250
Active - Class - 1
Residence converted from 2 to 13 families. noted: at 3rd flr rear - rear rm created & occupied as a sro with key lock at door, beds, tv, toiletries, food, personal belongings, shared bthrm & kitchen. addl't sro
Mar 1, 2022 · Penalty $70,000
Active - Class - 1
Residence converted from 2 to 13 families. noted: at 2nd flr - 2nd rm from front created & occupied as a sro with key locks at door, bed, tv, microwave, refrigerator, food, toiletries, personal belongings, shar
Mar 1, 2022 · Penalty $70,000
Active - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35079800k issued on 08/31/15 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for c of c. remedy: comply w/comm's order &/or file a c of c.
Apr 1, 2017 · Penalty $800
Active - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35079800k issued on 8-31-15 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for work w/o a permit. remedy: comply w/comm's order &/or file a
Feb 8, 2017
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in summons/violation# 35079800k issued on 8/31/15 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for work w/out a permit. rem: comply w/ commissi
Jan 19, 2017 · Penalty $6,000
Resolve - Class - 1
Failure to comply w.the commissioner's order contained in nov#35079800k issued 08/31/15 &to file a certificate of correction pursuant to 28-201.1,28-204.4 &1rcny 102-01.for work w.o a permit, installation of an
Dec 9, 2016 · Penalty $12,000
Resolve - Class - 1
Failure to comply w/the comm's order contained in nov #35079800k issued on 08/31/15 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny102-01. for work w/o permits. remedy: comply w/comm's order &/or file
Aug 25, 2016 · Penalty $6,000
Active - Class - 1
Failure to comply w/the comm's order contained in nov #35079800k issued on 08/31/15 & to file a cert of correction pursuant to 28-201.1,28-204.4 & 1rcny 102-01.for work w/out a permit.rem:comply w/comm's order
Jun 27, 2016 · Penalty $6,000
Active - Class - 1
Failure to comply w/ the commissioner's order contained in nov #35079800k issued on 08/31/15 & to file a certificate of correction pursuant to 28-201.1, 28-204.4 & 1rcny 102-01.
Apr 26, 2016 · Penalty $12,000
Active - Class - 1
Wowrk w/o a permit. commercial air conditioner condensing unit.servingthe 1st floor commercial space (deli grocery store)installed at exp#4 encroaching upon adjacent property 1450 bryant avenue.rmdy:obtain perm
Aug 31, 2015 · Penalty $8,000
Active - Non-hazardous
Illegal use in a residential district north side of first being used as a grocery and candy store in a residential district contrary to zoning resolution 22-00 remedy discontine illegal use
Nov 5, 1998
Resolve
Complaints
- Heat/hot water
Apartment only
Feb 13, 2025 · Apt 2
Close - Heat/hot water
Entire building
Jan 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 17, 2024 · Apt BLDG
Close - Safety
Smoke detector
May 18, 2023 · Apt 2
Close - Heat/hot water
Apartment only
Jan 15, 2022 · Apt 1STFLO
Close - Heat/hot water
Entire building
Jan 11, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 23, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 23, 2021 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 25, 2021 · Apt 2
Close - Unsanitary condition
Mold
Aug 25, 2021 · Apt 2
Close
Show 40 more ↓
- Unsanitary condition
Mold
Aug 19, 2021 · Apt 2
Close - Unsanitary condition
Pests
Jul 26, 2021 · Apt 23FLS
Close - Unsanitary condition
Mold
Jul 26, 2021 · Apt 23FLS
Close - Flooring/stairs
Stairs
Jul 8, 2021 · Apt 2
Close - Unsanitary condition
Mold
Jul 8, 2021 · Apt 2
Close - Heat/hot water
Apartment only
Apr 3, 2021 · Apt 1STFLO
Close - Heat/hot water
Entire building
Jan 29, 2021 · Apt 2C
Close - Unsanitary condition
Mold
Sep 28, 2020 · Apt 2FLOOR
Close - Paint/plaster
Ceiling
Sep 28, 2020 · Apt 2FLOOR
Close - Electric
Power outage
Sep 28, 2020 · Apt 2NDFL
Close - Paint/plaster
Wall
Sep 17, 2020 · Apt 3RDFL
Close - Unsanitary condition
Pests
Sep 17, 2020 · Apt 3RDFL
Close - Unsanitary condition
Pests
Sep 17, 2020 · Apt 3RDFL
Close - Electric
Power outage
Aug 28, 2020 · Apt 3RDFLO
Close - Electric
No lighting
Aug 28, 2020 · Apt 3RDFLO
Close - Electric
No lighting
Aug 27, 2020 · Apt BLDG
Close - Door/window
Door
Jun 15, 2020 · Apt 3
Close - Unsanitary condition
Mold
Jun 15, 2020 · Apt 3
Close - Unsanitary condition
Pests
Jun 10, 2020 · Apt 3
Close - Unsanitary condition
Pests
Jun 10, 2020 · Apt 3
Close - Unsanitary condition
Pests
Jun 10, 2020 · Apt 3
Close - Safety
Smoke detector
Jun 10, 2020 · Apt 3
Close - Safety
Carbon monoxide detector
Jun 10, 2020 · Apt 3
Close - Unsanitary condition
Mold
Jun 10, 2020 · Apt 3
Close - Appliance
Electric/gas range
Jun 10, 2020 · Apt 3
Close - Flooring/stairs
Floor
Jun 10, 2020 · Apt 3
Close - Paint/plaster
Wall
Jun 10, 2020 · Apt 3
Close - Paint/plaster
Ceiling
Jun 10, 2020 · Apt 3
Close - Safety
Fire escape
Jun 10, 2020 · Apt BLDG
Close - Door/window
Window pane
Jun 10, 2020 · Apt BLDG
Close - Door/window
Door
Jun 10, 2020 · Apt BLDG
Close - Door/window
Door
Jun 10, 2020 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 9, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
May 9, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 27, 2020 · Apt 2
Close - Unsanitary condition
Pests
Mar 11, 2020 · Apt 2
Close - Electric
Power outage
Mar 11, 2020 · Apt 2
Close - Heat/hot water
Entire building
Mar 2, 2020 · Apt 1
Close - Heat/hot water
Entire building
Jan 31, 2020 · Apt 1
Close - Heat/hot water
Apartment only
Jan 21, 2020 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1931
- Floors
- 3
- Residential units
- 5
- Building area
- 3,300 ft²
- Lot area
- 2,500 ft²
- Zoning
- R7-1
- Community board
- 203
- Council district
- 17
- Block / lot
- 2999 / 24
- Assessed value
- $466,200
- Landmark / historic district
- No
Questions about 1452 Bryant Avenue
Who owns 1452 Bryant Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2533 Grand Reatly Corp.
Does 1452 Bryant Avenue have violations?
Yes. NYC HPD has recorded 93 housing violations at this property.
Is 1452 Bryant Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1452 Bryant Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 1452 Bryant Avenue?
It has 5 residential units and 8 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.