roofy

1918 Daly Avenue

Bronx, NY 10460BBL 2-02992-0029Map

Owner of record: Islam, Sadiya

1918 Daly Avenue is a two-family home built in 1901 in Bronx, 10460. It has 2 residential units across 2 floors. The owner of record is Islam, Sadiya. HPD has recorded 44 housing violations here, most recently on November 13, 2024. 28 of the 44 most recent violations are still open.

HPD violations
44
DOB violations
0
ECB violations
0
HPD complaints
50

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Nov 13, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 44

  • C

    Replace with new the missing missing lock at west door in the entrance located at apt 2, 2nd story, 1st apartment from north at east

    Nov 13, 2024 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the private hallway located at apt 2, 2nd story, 1st apartment from north at east

    Nov 13, 2024 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 4th room from east at south located at apt 2, 2nd story, 1st apartment from north at east

    Nov 13, 2024 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st door frame from east at south wall, 1st window frame from west at north wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from north at east

    Nov 13, 2024 · Apt 2

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from north at east

    Nov 13, 2024 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall, 1st closet from south at west wall door frame, 1st door frame from north at east wall, 1st door frame from south at west wall, north wall, 1st window frame from north at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    Nov 13, 2024 · Apt 2

    Closed — Violation closed
  • B

    Properly secure the loose unhinged door at south wall in the 4th room from east at north located at apt 2, 2nd story, 1st apartment from north at east

    Nov 13, 2024 · Apt 2

    Open — Nov sent out
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 2, 2nd story, 1st apartment from north at east

    Nov 13, 2024 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt 2, 2nd story, 1st apartment from north at east

    Nov 13, 2024 · Apt 2

    Open — Nov sent out
  • C

    Properly secure the loose unhinged door at west wall in the entrance located at apt 2, 2nd story, 1st apartment from north at east

    Nov 13, 2024 · Apt 2

    Open — Nov sent out
Show 34 more ↓
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Nov 13, 2024 · Apt 2

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Nov 13, 2024 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall, 1st closet from north at east wall door frame, 1st door frame from west at north wall, 1st closet from north at east wall door in the 4th room from east at south located at apt 2, 2nd story, 1st apartment from north at east

    Nov 13, 2024 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall, 1st door from south at west wall, 1st window frame from east at south wall in the private hallway located at apt 2, 2nd story, 1st apartment from north at east

    Nov 13, 2024 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall, south wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from north at east

    Nov 13, 2024 · Apt 2

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Aug 23, 2024

    Open — Info nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective adjust the hinges in the entrance located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the private hallway located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 4th room from east at north located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall in the 4th room from east at south located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st door frame from east at south wall, 1st window frame from west at north wall in the 3rd room from east located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall in the 3rd room from east located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the 2nd room from east at north located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at north located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st room from east at north located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st door frame from south at west wall, north wall, south wall, 1st window frame from north at east wall in the kitchen located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the foyer located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the north wall in the private hallway located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall in the foyer located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st door frame from north at east wall, north wall, south wall, east wall in the 4th room from east at north located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the south wall, north wall, east wall, 1st door from west at north wall in the bathroom located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall in the 1st room from east at north located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall, 1st door frame from east at south wall, 1st door from east at south wall in the 2nd room from east at north located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, west wall, east wall in the 3rd room from east located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from north at east wall, 1st door from east at south wall, west wall in the 4th room from east at north located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door frame, 1st closet from north at east wall door, 1st door from west at north wall, 1st door frame from west at north wall, 1st window frame from south at west wall in the 4th room from east at south located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in at drain pipe under the bathtub in the bathroom located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 4th room from east at south located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical outlet at south wall in the 1st room from east at north located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Open — Nov sent out
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt floor2, 2nd story, 1st apartment from west at north

    Aug 21, 2024 · Apt FLOOR2

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Plumbing

    Bathtub/shower

    Aug 29, 2025 · Apt BASEME

    Close
  • Safety

    Carbon monoxide detector

    Aug 29, 2025 · Apt BASEME

    Close
  • Paint/plaster

    Wall

    Aug 29, 2025 · Apt BASEME

    Close
  • Unsanitary condition

    Mold

    Aug 29, 2025 · Apt BASEME

    Close
  • Unsanitary condition

    Pests

    Aug 29, 2025 · Apt BASEME

    Close
  • Unsanitary condition

    Sewage

    Aug 29, 2025 · Apt BASEME

    Close
  • Plumbing

    Steam pipe/riser

    Aug 29, 2025 · Apt BASEME

    Close
  • Unsanitary condition

    Sewage

    Aug 21, 2025 · Apt BASEME

    Close
  • Heat/hot water

    Apartment only

    Aug 21, 2025 · Apt BASEME

    Close
  • Paint/plaster

    Wall

    Aug 21, 2025 · Apt BASEME

    Close
Show 40 more ↓
  • Plumbing

    Toilet

    Aug 21, 2025 · Apt BASEME

    Close
  • Paint/plaster

    Wall

    Aug 21, 2025 · Apt BASEME

    Close
  • Unsanitary condition

    Mold

    Aug 21, 2025 · Apt BASEME

    Close
  • Safety

    Carbon monoxide detector

    Aug 21, 2025 · Apt BASEME

    Close
  • Plumbing

    Bathtub/shower

    Aug 21, 2025 · Apt BASEME

    Close
  • Flooring/stairs

    Floor

    Aug 21, 2025 · Apt BASEME

    Close
  • Plumbing

    Basin/sink

    Jan 5, 2025 · Apt BASEME

    Close
  • Paint/plaster

    Wall

    Jan 5, 2025 · Apt BASEME

    Close
  • Unsanitary condition

    Mold

    Jan 5, 2025 · Apt BASEME

    Close
  • Door/window

    Door

    Jan 5, 2025 · Apt BASEME

    Close
  • Unsanitary condition

    Pests

    Jan 5, 2025 · Apt BASEME

    Close
  • Paint/plaster

    Wall

    Jan 5, 2025 · Apt BASEME

    Close
  • Heat/hot water

    Apartment only

    Jan 5, 2025 · Apt BASEME

    Close
  • Flooring/stairs

    Floor

    Jan 5, 2025 · Apt BASEME

    Close
  • Plumbing

    Bathtub/shower

    Nov 12, 2024 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Nov 12, 2024 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Nov 12, 2024 · Apt 2

    Close
  • Paint/plaster

    Wall

    Nov 12, 2024 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Nov 12, 2024 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Nov 12, 2024 · Apt 2

    Close
  • Door/window

    Door

    Nov 12, 2024 · Apt 2

    Close
  • Plumbing

    Toilet

    Oct 21, 2024 · Apt 42

    Close
  • Heat/hot water

    Apartment only

    Oct 21, 2024 · Apt 42

    Close
  • Flooring/stairs

    Floor

    Oct 21, 2024 · Apt 42

    Close
  • Unsanitary condition

    Mold

    Oct 21, 2024 · Apt 42

    Close
  • Electric

    No lighting

    Oct 21, 2024 · Apt 42

    Close
  • Unsanitary condition

    Pests

    Oct 21, 2024 · Apt 42

    Close
  • Unsanitary condition

    Pests

    Oct 21, 2024 · Apt 42

    Close
  • Door/window

    Door

    Oct 21, 2024 · Apt 42

    Close
  • Plumbing

    Bathtub/shower

    Oct 21, 2024 · Apt 42

    Close
  • Unsanitary condition

    Pests

    Oct 21, 2024 · Apt 42

    Close
  • Unsanitary condition

    Pests

    Oct 21, 2024 · Apt 42

    Close
  • Paint/plaster

    Wall

    Oct 21, 2024 · Apt 42

    Close
  • Electric

    No lighting

    Sep 21, 2024 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Aug 13, 2024 · Apt FLOOR2

    Close
  • Unsanitary condition

    Pests

    Aug 13, 2024 · Apt FLOOR2

    Close
  • Electric

    Outlet/switch

    Aug 13, 2024 · Apt FLOOR2

    Close
  • Plumbing

    Toilet

    Aug 13, 2024 · Apt FLOOR2

    Close
  • Door/window

    Door

    Aug 13, 2024 · Apt FLOOR2

    Close
  • Unsanitary condition

    Mold

    Aug 13, 2024 · Apt FLOOR2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B2)
Year built
1901
Floors
2
Residential units
2
Building area
2,432 ft²
Lot area
3,241 ft²
Zoning
R7-1
Community board
206
Council district
15
Block / lot
2992 / 29
Assessed value
$45,360
Landmark / historic district
No

Questions about 1918 Daly Avenue

Who owns 1918 Daly Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Islam, Sadiya.

Does 1918 Daly Avenue have violations?

Yes. NYC HPD has recorded 44 housing violations at this property.

Is 1918 Daly Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1918 Daly Avenue built?

City records list 1901 as the year it was built.

How many apartments are in 1918 Daly Avenue?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.