1918 Daly Avenue
Bronx, NY 10460BBL 2-02992-0029Map
Owner of record: Islam, Sadiya
1918 Daly Avenue is a two-family home built in 1901 in Bronx, 10460. It has 2 residential units across 2 floors. The owner of record is Islam, Sadiya. HPD has recorded 44 housing violations here, most recently on November 13, 2024. 28 of the 44 most recent violations are still open.
- HPD violations
- 44
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 50
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 44
- CImmediately hazardous
Replace with new the missing missing lock at west door in the entrance located at apt 2, 2nd story, 1st apartment from north at east
Nov 13, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the private hallway located at apt 2, 2nd story, 1st apartment from north at east
Nov 13, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 4th room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Nov 13, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st door frame from east at south wall, 1st window frame from west at north wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from north at east
Nov 13, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from north at east
Nov 13, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall, 1st closet from south at west wall door frame, 1st door frame from north at east wall, 1st door frame from south at west wall, north wall, 1st window frame from north at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Nov 13, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly secure the loose unhinged door at south wall in the 4th room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Nov 13, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Nov 13, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt 2, 2nd story, 1st apartment from north at east
Nov 13, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Properly secure the loose unhinged door at west wall in the entrance located at apt 2, 2nd story, 1st apartment from north at east
Nov 13, 2024 · Apt 2
Open — Nov sent out
Show 34 more ↓
- BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Nov 13, 2024 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Nov 13, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall, 1st closet from north at east wall door frame, 1st door frame from west at north wall, 1st closet from north at east wall door in the 4th room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Nov 13, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall, 1st door from south at west wall, 1st window frame from east at south wall in the private hallway located at apt 2, 2nd story, 1st apartment from north at east
Nov 13, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall, south wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from north at east
Nov 13, 2024 · Apt 2
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Aug 23, 2024
Open — Info nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective adjust the hinges in the entrance located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the private hallway located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 4th room from east at north located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall in the 4th room from east at south located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st door frame from east at south wall, 1st window frame from west at north wall in the 3rd room from east located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall in the 3rd room from east located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the 2nd room from east at north located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at north located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st room from east at north located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st door frame from south at west wall, north wall, south wall, 1st window frame from north at east wall in the kitchen located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the foyer located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the private hallway located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall in the foyer located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st door frame from north at east wall, north wall, south wall, east wall in the 4th room from east at north located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, north wall, east wall, 1st door from west at north wall in the bathroom located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall in the 1st room from east at north located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall, 1st door frame from east at south wall, 1st door from east at south wall in the 2nd room from east at north located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, west wall, east wall in the 3rd room from east located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from north at east wall, 1st door from east at south wall, west wall in the 4th room from east at north located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door frame, 1st closet from north at east wall door, 1st door from west at north wall, 1st door frame from west at north wall, 1st window frame from south at west wall in the 4th room from east at south located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at drain pipe under the bathtub in the bathroom located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from east at south located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at south wall in the 1st room from east at north located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt floor2, 2nd story, 1st apartment from west at north
Aug 21, 2024 · Apt FLOOR2
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Plumbing
Bathtub/shower
Aug 29, 2025 · Apt BASEME
Close - Safety
Carbon monoxide detector
Aug 29, 2025 · Apt BASEME
Close - Paint/plaster
Wall
Aug 29, 2025 · Apt BASEME
Close - Unsanitary condition
Mold
Aug 29, 2025 · Apt BASEME
Close - Unsanitary condition
Pests
Aug 29, 2025 · Apt BASEME
Close - Unsanitary condition
Sewage
Aug 29, 2025 · Apt BASEME
Close - Plumbing
Steam pipe/riser
Aug 29, 2025 · Apt BASEME
Close - Unsanitary condition
Sewage
Aug 21, 2025 · Apt BASEME
Close - Heat/hot water
Apartment only
Aug 21, 2025 · Apt BASEME
Close - Paint/plaster
Wall
Aug 21, 2025 · Apt BASEME
Close
Show 40 more ↓
- Plumbing
Toilet
Aug 21, 2025 · Apt BASEME
Close - Paint/plaster
Wall
Aug 21, 2025 · Apt BASEME
Close - Unsanitary condition
Mold
Aug 21, 2025 · Apt BASEME
Close - Safety
Carbon monoxide detector
Aug 21, 2025 · Apt BASEME
Close - Plumbing
Bathtub/shower
Aug 21, 2025 · Apt BASEME
Close - Flooring/stairs
Floor
Aug 21, 2025 · Apt BASEME
Close - Plumbing
Basin/sink
Jan 5, 2025 · Apt BASEME
Close - Paint/plaster
Wall
Jan 5, 2025 · Apt BASEME
Close - Unsanitary condition
Mold
Jan 5, 2025 · Apt BASEME
Close - Door/window
Door
Jan 5, 2025 · Apt BASEME
Close - Unsanitary condition
Pests
Jan 5, 2025 · Apt BASEME
Close - Paint/plaster
Wall
Jan 5, 2025 · Apt BASEME
Close - Heat/hot water
Apartment only
Jan 5, 2025 · Apt BASEME
Close - Flooring/stairs
Floor
Jan 5, 2025 · Apt BASEME
Close - Plumbing
Bathtub/shower
Nov 12, 2024 · Apt 2
Close - Heat/hot water
Apartment only
Nov 12, 2024 · Apt 2
Close - Unsanitary condition
Mold
Nov 12, 2024 · Apt 2
Close - Paint/plaster
Wall
Nov 12, 2024 · Apt 2
Close - Flooring/stairs
Floor
Nov 12, 2024 · Apt 2
Close - Unsanitary condition
Pests
Nov 12, 2024 · Apt 2
Close - Door/window
Door
Nov 12, 2024 · Apt 2
Close - Plumbing
Toilet
Oct 21, 2024 · Apt 42
Close - Heat/hot water
Apartment only
Oct 21, 2024 · Apt 42
Close - Flooring/stairs
Floor
Oct 21, 2024 · Apt 42
Close - Unsanitary condition
Mold
Oct 21, 2024 · Apt 42
Close - Electric
No lighting
Oct 21, 2024 · Apt 42
Close - Unsanitary condition
Pests
Oct 21, 2024 · Apt 42
Close - Unsanitary condition
Pests
Oct 21, 2024 · Apt 42
Close - Door/window
Door
Oct 21, 2024 · Apt 42
Close - Plumbing
Bathtub/shower
Oct 21, 2024 · Apt 42
Close - Unsanitary condition
Pests
Oct 21, 2024 · Apt 42
Close - Unsanitary condition
Pests
Oct 21, 2024 · Apt 42
Close - Paint/plaster
Wall
Oct 21, 2024 · Apt 42
Close - Electric
No lighting
Sep 21, 2024 · Apt 2
Close - Flooring/stairs
Floor
Aug 13, 2024 · Apt FLOOR2
Close - Unsanitary condition
Pests
Aug 13, 2024 · Apt FLOOR2
Close - Electric
Outlet/switch
Aug 13, 2024 · Apt FLOOR2
Close - Plumbing
Toilet
Aug 13, 2024 · Apt FLOOR2
Close - Door/window
Door
Aug 13, 2024 · Apt FLOOR2
Close - Unsanitary condition
Mold
Aug 13, 2024 · Apt FLOOR2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1901
- Floors
- 2
- Residential units
- 2
- Building area
- 2,432 ft²
- Lot area
- 3,241 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 2992 / 29
- Assessed value
- $45,360
- Landmark / historic district
- No
Questions about 1918 Daly Avenue
Who owns 1918 Daly Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Islam, Sadiya.
Does 1918 Daly Avenue have violations?
Yes. NYC HPD has recorded 44 housing violations at this property.
Is 1918 Daly Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1918 Daly Avenue built?
City records list 1901 as the year it was built.
How many apartments are in 1918 Daly Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.