1405 Vyse Avenue
Bronx, NY 10459BBL 2-02987-0052Map
Owner of record: Skmf Vyse Management LLC
1405 Vyse Avenue is an elevator apartment building built in 2025 in Bronx, 10459. It has 73 residential units. The owner of record is Skmf Vyse Management LLC. HPD has recorded 63 housing violations here, most recently on November 24, 2025. 36 of the 50 most recent violations are still open.
- HPD violations
- 63
- DOB violations
- 2
- ECB violations
- 42
- HPD complaints
- 0
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 63
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 24, 2025
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 3, 2024
Open — Info nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and all walls (lower level duplex apt) in the 1st room from east located at apt unit2, 2nd story
Oct 16, 2020 · Apt UNIT2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt unit2, 2nd story
Oct 16, 2020 · Apt UNIT2
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling (lower level duplex apt) in the 1st room from east located at apt unit2, 2nd story
Oct 16, 2020 · Apt UNIT2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at north wall (lower level duplex apt) in the private hallway located at apt unit2, 2nd story
Oct 16, 2020 · Apt UNIT2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood base cabinet (lower level duplex apt) in the kitchen located at apt unit2, 2nd story
Oct 16, 2020 · Apt UNIT2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at all walls (upper level duplex apt) in the 2nd room from east at north located at apt unit2, 2nd story
Oct 16, 2020 · Apt UNIT2
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture (upper level duplex apt) in the bathroom located at apt unit2, 2nd story
Oct 16, 2020 · Apt UNIT2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at north wall (upper level duplex apt) in the private hallway located at apt unit2, 2nd story
Oct 16, 2020 · Apt UNIT2
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair the broken or defective electrical outlet at aouth and east wall (upper level duplex apt) in the 2nd room from east at north located at apt unit2, 2nd story
Oct 16, 2020 · Apt UNIT2
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 8, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 1, 2018
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Feb 12, 2018 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Feb 12, 2018 · Apt 2
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures .. in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Jan 10, 2018 · Apt 2
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures ... in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Jan 10, 2018 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Jan 10, 2018 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the broken or defective sink base cabinet in the kitchen located at apt 1 lower level, 2nd story
May 5, 2017 · Apt 1
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from east located at apt 1 upper level, 2nd story
May 5, 2017 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling & west wall. in the 2nd room from east located at apt 1 upper level, 2nd story
May 5, 2017 · Apt 1
Open — Nov sent out - ANon-hazardous
Refit upper & lower sash windows in the entire apartment located at apt 1 lower level, 2nd story
May 5, 2017 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling & south wall in the 1st room from east located at apt 1 upper level, 2nd story
May 5, 2017 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective door in the 1st room from east located at apt 1 upper level, 2nd story
May 5, 2017 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective electric light fixture at ceiling in the 1st room from east located at apt 1 upper level, 2nd story
May 5, 2017 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling & walls in the 1st room from east at south located at apt 1 upper level, 2nd story
May 5, 2017 · Apt 1
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1 lower level, 2nd story
May 5, 2017 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective connection at waste line at sink in the kitchen located at apt 1 lower level, 2nd story
May 5, 2017 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at west wall in the 3rd room from east located at apt 1 upper level, 2nd story
May 5, 2017 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from north at west located at apt 1 lower level, 2nd story
May 5, 2017 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at west located at apt 1 lower level, 2nd story
May 5, 2017 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1 lower level, 2nd story
May 5, 2017 · Apt 1
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 1 lower level, 2nd story
May 5, 2017 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 1 lower level, 2nd story
May 5, 2017 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the missing hand rail at 1st story public hall stairs.
May 5, 2017
Open — Violation will be reinspected - ANon-hazardous
Refit upper & lower sash windows in the entire apartment located at apt 1 upper level, 2nd story
May 5, 2017 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retarding plaster at walls & ceiling at 2nd story public hall
May 5, 2017
Open — Violation will be reinspected - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at walls & ceiling at 2nd story public hall
May 5, 2017
Open — Violation will be reinspected - CImmediately hazardous
Abate the nuisance consisting of lockable roll down gate at door to rear yard. in the 1st room from north at west located at apt 1 lower level, 2nd story
May 5, 2017 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt pvt, 2nd story, 1st apartment from west at north
Dec 9, 2016 · Apt PVT
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt pvt, 2nd story, 1st apartment from west at north
Dec 9, 2016 · Apt PVT
Closed — Violation dismissed - ANon-hazardous
Refit upper and lower window sashes in the entire apartment located at apt pvt, 2nd story, 1st apartment from west at north
Dec 9, 2016 · Apt PVT
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures ... in the kitchen located at apt 1, 2nd story, apartment at north
Jun 24, 2016 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Jun 10, 2016 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
May 13, 2016 · Apt 2
Closed — Violation closed - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the excessive garbage, wood and debris, approximately 20 cubic yards, at rear yard
May 13, 2016
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color south wall in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
May 13, 2016 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 2f, 2nd story
Feb 2, 2016 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at stove in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Dec 3, 2015 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Dec 3, 2015 · Apt 2
Closed — Violation closed
DOB building violations · 2
- Construction other optional
Borough commissioner has ordered all work stopped under permit#x01228952 on 08/07/25. notice to revoke: failed audit.
Aug 7, 2025
Dob violation - dismissed - Construction other optional
Borough commissioner has ordered all work stopped under permit#x01228952, on 08/07/25. notice to revoke: failed audit.
Aug 7, 2025
Dob violation - dismissed
ECB violations · 42
- Class - 2
Closed 13-story nb, no workers observed on site. the permit holder failed to timely submit an acceptable required certificate of correction for class one violation 39553495y issued on 04/24/2026. as of the dat
Jun 23, 2026 · Penalty $625
Resolve - Class - 1
13 story nb active site.observed exterior work finished at exp#4.research on inspection plus dob now/bis department records.partial stop work order issued/posted/served on 6/8/2026,failure to provide pedestrian
Jun 16, 2026 · Penalty $2,500
Resolve - Class - 1
13 story nb active site.observed exterior work finished at exp#4.research on inspection plus dob now/bis dob records.partial stop work order issued/posted/served on 6/8/2026.ecb#39555603l ssc allowed work again
Jun 16, 2026 · Penalty $2,500
Resolve - Class - 1
Active site observed with articulating boom lift at exp 1&4 performing facade work above 2nd floor without required flagger, pedestrian protection. property owner, pedestrians was exposed to overhead and site r
Jun 8, 2026 · Penalty $4,800
Resolve - Class - 1
. contractor failed to file required incident report and 16-item incident information within 3 business days. no report filed by 04/27/2026 for 04/24/2026 ladder fall injury at 13-story site under job #x0068569
May 15, 2026 · Penalty $10,000
Resolve - Class - 1
At time of inspection, active 13-story new building, topped off, in finishing phase. worker injury occurred at approximately 10:00 am and was later reported in the day per logbook review. failure to timely noti
Apr 24, 2026 · Penalty $5,000
Resolve - Class - 2
At time of inspection, active 13-story new building, topped off, in finishing phase. injured worker reported fall from ladder on 8th floor. manufacturer specifications not followed; step ladder used in place of
Apr 24, 2026 · Penalty $1,250
Resolve - Class - 2
At time of inspection, active 13-story new building, topped off, in finishing phase. work area not properly maintained; photos show debris and unsafe housekeeping conditions around work zone at time of incident
Apr 24, 2026
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons 39155154m., file a certificate of correction
Mar 17, 2026
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons 39127498h., file a certificate of correction
Mar 17, 2026 · Penalty $625
Resolve
Show 32 more ↓
- Class - 2
At the time of inspection of a proposed 13-story new building, i observed no watch person on site or in the area of the premises. the site exceeded a 13,000 sq. ft. footprint and required a designated watch per
Feb 1, 2026 · Penalty $2,500
Resolve - Class - 1
At the time of inspection, i observed plastic barriers installed on the roadway not in accordance with manufacturer specifications. the barriers were not interlocking and not filled with water or sand, and coul
Feb 1, 2026 · Penalty $2,500
Resolve - Class - 2
At the time of inspection of a proposed 13-story new building, i observed improperly supported scaffolding and loose netting during windy conditions. this condition created an immediate hazard of flying debris
Feb 1, 2026 · Penalty $2,500
Resolve - Class - 1
At time of inspection, multiple open edges were observed from the 9th through 11th floors without guardrail systems or other fall protection in place. the unsecured elevated edges created an immediate fall haza
Jan 22, 2026 · Penalty $5,000
Resolve - Class - 1
At time of inspection, observed combustible materials and debris accumulated inside building throughout site and near hoist area, left in place overnight from 1/22/26 to 1/23/26. contrary to bc 3303.4 & 3301.2
Jan 22, 2026 · Penalty $5,000
Resolve - Class - 2
At time of inspection, observed full closure of public street for construction operations with no dot permit posted or available. contrary to bc 3301.2 and bc 3307.1, failure to maintain required dot authorizat
Jan 22, 2026 · Penalty $2,500
Resolve - Class - 2
At time of inspection, observed supported scaffold with concrete debris and construction material accumulated on multiple levels; scaffold not maintained in clean, safe condition. contrary to bc 3314.4.4.5 & 33
Jan 22, 2026 · Penalty $2,500
Resolve - Class - 1
At the time of my inspection of a 8 story new building approximately 9,887 square feet, site was closed and there was no construction activity. upon shouting at perimeter and banging on fence to alert watchpers
Dec 21, 2025 · Penalty $5,000
Resolve - Class - 1
At time of inspection observed site safety log from 11-28-25 to current date signed by multiple workers not on pw2 failing to notify department of absence of registered professional as per 3310.5.1notify as re
Dec 19, 2025 · Penalty $5,000
Resolve - Class - 2
At time of inspection of nb in progress observed pedestrian protection in place not meeting the requirement causing hazardous conditions without 5' clearance for safe travel though construction operations.provi
Dec 18, 2025 · Penalty $2,400
Resolve - Class - 1
At time of inspection of proposed 13 story new building observed stairs poured above 75' 9th floor, access ladders to floors above and hoist not in state of readiness as per 3303.12 causing hazardous condition.
Dec 18, 2025 · Penalty $5,000
Resolve - Class - 2
At time of inspection of proposed 13 story building observed concrete operation without adequate concrete washout procedure in place 1. washout box (1) for 15 trucks 2. filers/sleeves missing in public water sy
Dec 18, 2025 · Penalty $2,500
Resolve - Class - 1
At time of inspection of 13 story new building in progress with supported scaffolding being erected signed off to the 7th floor where workers working on facade above 7th fl with unsafe conditions guard rails no
Dec 18, 2025 · Penalty $5,000
Resolve - Class - 1
At time of inspection of proposed 13 story building in progress observed no construction superintendent designated as required causing hazardous conditions.assign required superintendent
Dec 18, 2025 · Penalty $10,000
Resolve - Class - 1
At the time of my inspection of a 13 story building at 10 floor level construction work in progress. review of department records reveal that no permit for standpipe was not applied,approved or issued as requir
Dec 18, 2025 · Penalty $2,500
Resolve - Class - 1
At time of inspection of proposed 13 story building observed no valid documentation/information of standpipe in system causing hazardous conditions as per 1704.24.1/1705.30.1provide required step for safe opera
Dec 18, 2025 · Penalty $5,000
Resolve - Class - 2
Failure to comply with manufacturer specifications. bc 3301.1.3 at time of inspection, i observed the yodock barrier system in place with multiple missing interlock couplers and not filled with water or sand. t
Oct 15, 2025 · Penalty $3,125
Resolve - Class - 2
(3303.3) at time of my inspection of a 8-story proposed nb, building approximately 9887 square feet. site closed and there were no construction activity. upon shouting at perimeter and banging on fence and door
Oct 4, 2025 · Penalty $2,500
Resolve - Class - 2
At time of inspection of a 8-story proposed new building, jobsite closed and no construction activity observed during my inspection i noticed storage not in compliance as per (3307.4.7) missing fence on top jer
Oct 4, 2025 · Penalty $2,400
Resolve - Class - 1
At time of my inspection of a closed jobsite proposed 8 story building, i noticed yodak barrier on street not as per manufacture specification.manufacture spec requires barrier to be attached with pin and fille
Aug 9, 2025 · Penalty $1,250
Resolve - Class - 2
At the time of my inspection of a 8 story new building at roof, building approx 7,732square feet. site closed and there were no construction activity. upon shouting at perimeter and banging on fence and door to
Aug 9, 2025 · Penalty $2,500
Resolve - Class - 1
Work with out permit: at time of inspection of a new building under construction observed approx. 70 worker on site doing construction. dob records indicate the 8 story nb filing is approved but not permitted.
Jul 28, 2025
Resolve - Class - 2
Inactive closed jobsite, i observed existing 8feet plywood construction with expired permit x00699457-i1-fn with expiration dated 04/25/2024. upon search in bis & dob now for renewal updated, none was found.
Mar 20, 2025
Resolve - Class - 2
Manufacturer specifications & industry safety standard for ballast filled yoduck as barriers. i observed existing yoducks placed on roadway exposure 1&2 with garbage & poor housekeeping conditions not maintaine
Mar 20, 2025
Resolve - Class - 2
& industry safety standard for ballast filled yoduck as barriers. i observed existing yoducks on street with garbage & poor housekeeping condition, not maintained & filled with ballast (ie:water). this conditio
Mar 20, 2025
Resolve - Class - 1
Observed active soe work 1407 & 1405 vyse ave for 8 stories merged under stamped pe tr4 plot plan, w/out lots merged @ department records, no construction superintendent on site nor designated comp person, only
Feb 19, 2025 · Penalty $12,500
Resolve - Class - 2
3301.7 documents to be maintained on site-observed active soe work 1407 & 1405 vyse ave for 8 stories under stamped pe tr4 plot plan, no soe approved plans & site safety plan provided/ available for job sites t
Feb 19, 2025 · Penalty $2,500
Resolve - Class - 2
Work without an after hours variance permit contrary to 28-105.12.5 on10/15/24 at 7:20pm observed 3 male workers at demolition site with tools inside site working. remedy: stop all after hours work and obtain v
Oct 15, 2024 · Penalty $625
Resolve - Class - 1
At time of inspection i observerd working demo site with excessive dirt and debris causing danger to public, maintain and carry out demolition operations in a safe manner
Oct 15, 2024 · Penalty $5,000
Resolve - Non-hazardous
Occupancy contrary to that allowed by bldg dept records. demo #71 of 1975 indicates legal use of lot is vacant land. current use is storageof 13 unregistered automobiles. remedy: discontinue illegal use.
Mar 8, 1999 · Penalty $2,500
Resolve - Non-hazardous
Occupancy contrary to that allowed by the department of building records. demotition 71-75 vacont lot-now occupied as auto repair shop and storage of motor vehicles throughout lot. remedy: discontinue illegal
Jul 16, 1998 · Penalty $2,500
Active - Non-hazardous
Illegal use in a commercial district. auto repairs, dead storage & dismanteling on open lot. lot is within a c1-4 commercial overlay. remedy: discontinue illegal use.
Nov 18, 1997 · Penalty $2,500
Active
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2025
- Floors
- —
- Residential units
- 73
- Building area
- 49,558 ft²
- Lot area
- 7,155 ft²
- Zoning
- R7-1
- Community board
- 203
- Council district
- 17
- Block / lot
- 2987 / 52
- Assessed value
- $158,400
- Landmark / historic district
- No
HPD registration #711453, last renewed Aug 22, 2023.
Questions about 1405 Vyse Avenue
Who owns 1405 Vyse Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Skmf Vyse Management LLC.
Does 1405 Vyse Avenue have violations?
Yes. NYC HPD has recorded 63 housing violations at this property.
Is 1405 Vyse Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1405 Vyse Avenue built?
City records list 2025 as the year it was built.
How many apartments are in 1405 Vyse Avenue?
It has 73 residential units and 74 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.