1372 Franklin Avenue
Bronx, NY 10456BBL 2-02933-0029Map
Owner of record: 1372 Franklin Ave Hsg
1372 Franklin Avenue is an elevator apartment building built in 1931 in Bronx, 10456. It has 48 residential units across 6 floors. The owner of record is 1372 Franklin Ave Hsg. HPD has recorded 356 housing violations here, most recently on September 22, 2026. 39 of the 50 most recent violations are still open.
- HPD violations
- 356
- DOB violations
- 25
- ECB violations
- 8
- HPD complaints
- 394
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 356
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 1a, 1st story, 2nd apartment from east at south
Sep 22, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the bathroom located at apt 1a, 1st story, 2nd apartment from east at south
Sep 22, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 1a, 1st story, 2nd apartment from east at south
Sep 22, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 3rd room from east at north located at apt 1a, 1st story, 2nd apartment from east at south
Sep 22, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the 3rd room from east at north located at apt 1a, 1st story, 2nd apartment from east at south
Sep 22, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Sep 9, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wired glass pane at vestibule door , 1st story
Sep 9, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective rubber gasket seal at refrigerator door in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
Sep 9, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Sep 9, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in drain pipe wash basin in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Sep 9, 2026 · Apt 1A
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Sep 9, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Apr 30, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Apr 30, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Apr 30, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 1a, 1st story, 1st apartment from east at south
Apr 30, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt 1a, 1st story, 1st apartment from east at south
Apr 30, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story, section ''south''
Feb 19, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at 2nd public hall bulkhead from north, 6th story, section ''south''
Feb 19, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling at 2nd public hall bulkhead from north, 6th story, section ''south''
Feb 19, 2026
Open — Nov sent out - BHazardous
Remove the illegal fastening consisting of panic bar installed on roof door that do not allowre entry from roof to public hall at 2nd public hall bulkhead from north, 6th story, section ''south''
Feb 19, 2026
Open — Nov sent out - BHazardous
Remove the illegal fastening consisting of panic bar installed on roof door that do not allowre entry from roof to public hall at 1st public hall bulkhead from north, 6th story, section ''south''
Feb 19, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1a, 1st story, 2nd apartment from east at south
Feb 19, 2026 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story, section ''south''
Feb 19, 2026
Open — Nov certified late - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1a, 1st story, 2nd apartment from east at south
Feb 19, 2026 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1a, 1st story, 2nd apartment from east at south
Feb 19, 2026 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at the bathtub in the bathroom located at apt 1a, 1st story, 2nd apartment from east at south
Feb 19, 2026 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1a, 1st story, 2nd apartment from east at south
Feb 19, 2026 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at 2nd public hall bulkhead from north, 6th story, section ''south''
Feb 19, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles near to staircase at public hall, 6th story, section at east
Jan 30, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material ceiling, at 1st public hall bulkhead from east, 6th story
Jan 30, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall, in the kitchen located at apt 2b, 2nd story, apartment at west
Jan 30, 2026 · Apt 2B
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of hasp with eye capable of being padlocked at door leading to fire escape located at apt 5h, 5th story, 1st apartment from east at south
Jan 30, 2026 · Apt 5H
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective intercommunication system located at apt 5h, 5th story, 1st apartment from east at south
Jan 30, 2026 · Apt 5H
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling , at 1st public hall bulkhead from east, 6th story
Jan 30, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges, in the entrance located at apt 5h, 5th story, 1st apartment from east at south
Jan 30, 2026 · Apt 5H
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [hinge] door to roof at bulkhead at public hall stairs, 6th story, section ''east''
Dec 15, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [hinge] door to roof at bulkhead at public hall stairs, 6th story, section ''east''
Dec 15, 2025
Closed — Violation closed - BHazardous
Fire escape defective. replace with new the broken, defective and/or missing west guide at 1st fire escape from north at west exterior wall at fire escape
Nov 23, 2025
Open — Not complied with - BHazardous
Refit door at public hall, 6th story, section ''east''
Nov 23, 2025
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Nov 23, 2025
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at vestibule entrance at public hall, 1st story
Nov 23, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at vestibule at public hall, 1st story
Nov 23, 2025
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south
Oct 11, 2025 · Apt 5A
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south
Oct 11, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective broken/ damaged (wash basin vainty) in the bathroom located at apt 5a, 5th story, 1st apartment from east at south
Oct 11, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom located at apt 5a, 5th story, 1st apartment from east at south
Oct 11, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets constant dripping at bathtub (faucet) in the bathroom located at apt 5a, 5th story, 1st apartment from east at south
Oct 11, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallway located at apt 5a, 5th story, 1st apartment from east at south
Oct 11, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceiling in the 1st room from east at south located at apt 5a, 5th story, 1st apartment from east at south
Oct 11, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 5a, 5th story, 1st apartment from east at south
Oct 11, 2025 · Apt 5A
Open — Nov sent out
DOB building violations · 25
- Construction other optional
Partial vacate order due to severely cracked/spalling stucco on bulkhead directly above courtyard at exposure #4 south elevation remedy: vacate entire courtyard at exposure #4 south elevation & restrict access to vacated area
Jul 17, 2026
Dob violation - active - Construction other optional
Failure to maintain building in a code compliant manner as per section 28.301.1 of the nyc admin code.noted at time of inspection,observed at exposure 2 numerous vertical crack on fire escapes.at roof elevation,d amaged coping stones,cracks and spalling along parapets.remedy:repair and/or replace
Jun 23, 2026
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 8, 2021
Dob violation - active - Hazardous condition (facade) facade required
Fisphaz-hazardous condition (facade) facade required
Jul 10, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 1, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 15, 2013
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 24, 2012
Dob violation - resolved
Show 15 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Nov 10, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 21, 2010
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 27, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 18, 2008
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 10, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 24, 2005
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 21, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 6, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 17, 1992
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
18 replace missing interlock covers where necessary 35 provide access to motor rm 15 pulling on hoistway doors should not stop elevator adjust interlocks 74 renew car door saddle 74 clean car top 74 replace missing splice box covers
Sep 4, 1990
Dob violation - resolved - Elevator elevatorrequired
(50)motor room
Jan 20, 1989
Dob violation - resolved - Elevator elevatorrequired
Restore elev. to service so a proper inspection may be made by an inspector from this dept
Aug 11, 1988
Dob violation - resolved
ECB violations · 8
- Class - 2
Failure to file acceptable cycle 9c report indicating correction of unsafe condition described in initial facades report required by 28-302.5 for control #916968. remedy: file acceptable report.
Apr 20, 2026 · Penalty $1,250
Active - Class - 2
70o02,39o02,98bb05,52h10.
Feb 9, 2009 · Penalty $2,500
Resolve - Class - 2
97x10.40p16.97x10 1rcny 11-02 only elevator in bldg out of service restore to service 40p16 provide access to motor rm so that a full inspection can be done
Jan 13, 2009 · Penalty $2,500
Resolve - Non-hazardous
73x11-31q07-33p07-35p07. 73-restore to servife so a full insp fan be done by this dept fall 646-248-8732 when ready, 31-thru out shaft & owner car.
Jun 18, 2002 · Penalty $440
Resolve - Non-hazardous
73x11-31m7-33p17-35p17-36p17. 73-restore to secivce to be properly insp by dob 31-exposed wire under provide cover.
Jan 24, 2002 · Penalty $350
Resolve - Non-hazardous
47h12,15b1,75u5,33o2,3o2,30i11,57o2,17b12.
Sep 21, 1999
Resolve - Non-hazardous
11q, 14m, 37n, 46h. 37. selector tape noisy and rubbing, shorten & ad-just.
Oct 18, 1994
Resolve - Non-hazardous
14m,08v,35p. 74 a replace missing interlock covers 74 repair can floor35 provide access to motor room.
Dec 17, 1992
Resolve
Complaints
- Heat/hot water
Entire building
Oct 22, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Sep 18, 2026 · Apt 1A
Close - Plumbing
Bathtub/shower
Sep 3, 2026 · Apt 1A
Close - Plumbing
Bathtub/shower
Sep 3, 2026 · Apt 1A
Close - Appliance
Electric/gas range
Sep 3, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
Sep 3, 2026 · Apt 1A
Close - Appliance
Refrigerator
Sep 3, 2026 · Apt 1A
Close - Plumbing
Water supply
Jul 2, 2026 · Apt 6H
Close - Paint/plaster
Wall
Jun 16, 2026 · Apt 5A
Close - Electric
Outlet/switch
Jun 16, 2026 · Apt 5A
Close
Show 40 more ↓
- Flooring/stairs
Floor
Jun 16, 2026 · Apt 5A
Close - Plumbing
Basin/sink
Jun 16, 2026 · Apt 5A
Close - Water leak
Heavy flow
Apr 23, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Apr 3, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Mar 2, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Feb 19, 2026 · Apt BLDG
Close - Electric
Power outage
Feb 18, 2026 · Apt ENTIRE
Close - Water leak
Heavy flow
Dec 15, 2025 · Apt 1A
Close - Heat/hot water
Entire building
Dec 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 10, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 10, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 21, 2025 · Apt 6H
Close - Heat/hot water
Entire building
Oct 11, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 9, 2025 · Apt 5A
Close - Door/window
Window frame
Jan 6, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Jan 6, 2025 · Apt 2A
Close - Water leak
Slow leak
Jan 6, 2025 · Apt 2A
Close - Flooring/stairs
Floor
Jan 6, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Jan 5, 2025 · Apt BLDG
Close - Electric
No lighting
Oct 7, 2024 · Apt 2E
Close - Paint/plaster
Ceiling
Jun 26, 2024 · Apt 4F
Close - General
Ventilation system
Jun 12, 2024 · Apt 2E
Close - Appliance
Refrigerator
Jun 12, 2024 · Apt 2E
Close - Water leak
Heavy flow
Jan 25, 2024 · Apt 1A
Close - Water leak
Damp spot
Jan 10, 2024 · Apt 1A
Close - Water leak
Heavy flow
Jan 10, 2024 · Apt 1A
Close - Water leak
Heavy flow
Apr 3, 2023 · Apt 1A
Close - Unsanitary condition
Mold
Dec 14, 2021 · Apt 1D
Close - Unsanitary condition
Sewage
Dec 14, 2021 · Apt 1D
Close - Water leak
Heavy flow
Dec 14, 2021 · Apt 1D
Close - Plumbing
Steam pipe/riser
Dec 14, 2021 · Apt 1D
Close - Unsanitary condition
Pests
Dec 6, 2021 · Apt 6E
Close - Heat/hot water
Entire building
Apr 2, 2021 · Apt 4A
Close - Heat/hot water
Entire building
Feb 8, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2021 · Apt BLDG
Close - Water leak
Damp spot
Oct 12, 2019 · Apt 1D
Close - Safety
Carbon monoxide detector
Oct 12, 2019 · Apt 1D
Close - Plumbing
Bathtub/shower
Oct 12, 2019 · Apt 1D
Close - General
Cabinet
Oct 12, 2019 · Apt 1D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1931
- Floors
- 6
- Residential units
- 48
- Building area
- 48,852 ft²
- Lot area
- 10,165 ft²
- Zoning
- R6
- Community board
- 203
- Council district
- 17
- Block / lot
- 2933 / 29
- Assessed value
- $1,085,850
- Landmark / historic district
- No
HPD registration #204536, last renewed Sep 29, 2025.
Questions about 1372 Franklin Avenue
Who owns 1372 Franklin Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1372 Franklin Ave Hsg.
Does 1372 Franklin Avenue have violations?
Yes. NYC HPD has recorded 356 housing violations at this property.
Is 1372 Franklin Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1372 Franklin Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 1372 Franklin Avenue?
It has 48 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.