463 East 173 Street
Bronx, NY 10457BBL 2-02906-0093Map
Owner of record: Tasma LLC
463 East 173 Street is a warehouse built in 1945 in Bronx, 10457. The owner of record is Tasma LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 8
- ECB violations
- 26
- HPD complaints
- 37
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 8
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 29, 2023
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 24, 2021
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 21, 2016
Dob violation - resolved
ECB violations · 26
- Class - 2
Observed throughout the building obstructed sprinkler heads , missing trap wrap insulation under bathrooms sinks and missing escutcheon plates for water lines going to toilets. secound floor bathroom open waste
Dec 30, 2025 · Penalty $1,250
Active - Class - 2
Observed on the ground floor: the water meter and sprinkler main are located in the same room as the electrical service meter, and the dedicated sprinkler line is connected to the domestic water line which is c
Dec 30, 2025 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code-compliant manner. observed painted sprinkler head in stairwell b. located on the 2nd floor. also fallen plaster next to sprinkler pipe., repair and/or replace
Apr 8, 2025 · Penalty $625
Active - Class - 2
Class 2 item: hoist ropes show signs of rouge. replace.
Apr 7, 2025 · Penalty $625
Active - Class - 2
Observed on the 3rd floor in the water heater room sprinkler head is obstructed by ceiling. as per 102.3 maintenance. installations, both existing and new, and parts thereof shall be maintained in proper operat
Sep 5, 2023 · Penalty $3,125
Active - Class - 2
Illegal hardware, (bolt lock) inside the electrical & sprinkler control mechanical room located on ground level/brewery warehouse side., provide legal hardware
Sep 5, 2023
Resolve - Class - 1
I observed on the upper and lower roofs the improper installation of equipment disconnect switches. the equipment disconnects are required to shut down power to energizing the a.c units the switches are wired a
Sep 5, 2023
Resolve - Class - 2
I observed on the 3rd floor the hot water heater room with no remote shut-down as required in mc 1006.8.1 for the gas fired systems.; mc 1006.8.1, comply with code
Sep 5, 2023 · Penalty $1,250
Resolve - Class - 2
Combustion air fan to boiler room not interlocked with burner and fan is not operating. no body drain installed from safety valve.
Sep 5, 2023
Resolve - Class - 2
I observed in the lobby the use of extension cords to supply power for the x-ray scanner. as per ec 400.8 the use of flexible cords as wiring for permanent fixed equipment is not permitted.; ec 400.8, comply wi
Sep 5, 2023 · Penalty $400
Active
Show 16 more ↓
- Class - 2
Safety valve is leaking-back flow valve leaking and flooding up boiler room floor-ball valve on hot water pipe to mixing valve is leaking on floor.
Apr 10, 2023 · Penalty $625
Resolve - Class - 2
Sprinkler head on the water heater room located on the 3rd floor is obstructed by ceiling. as per102.3 maintenance. installations, both existing and new, and parts thereof shall be maintained in proper operatin
Apr 10, 2023 · Penalty $312
Active - Class - 1
I observed on both the upper and lower roofs the failure to install an equipment disconnect on the hvac units. as per ec 440 a disconnect shall be located on or near and provided to open power prior to entering
Apr 10, 2023
Resolve - Class - 2
I observed on the lower roof the unpermitted use of emt in an outdoor installation, supplying power to the roof hvac systems. photos taken., comply with ec code; use proper raceways.
Apr 10, 2023 · Penalty $1,250
Resolve - Class - 2
I observed on the rooftop boiler room entrance no remote shut-down for the fuel burning systems as required in mc 1006.8.1. a remote shut-down shall be installed for all the gas fired systems at the immediate p
Apr 10, 2023 · Penalty $3,125
Resolve - Class - 1
No door lock monitoring installed in controller as mandated in 3.10.12 of appendix k3 of 2014 bc. remedy: file application, install dlm, file and perform test with nyc dob
Feb 19, 2020
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. noted: obseved on the 2nd floor-two (2) lounge rooms and one(1) cafeteria, a second door was added at stair a, at 3rd floor
Jan 8, 2019
Resolve - Class - 2
Failure to maintain building in code-compliant manner. noted: failure to provide emergency and standby power for the 2nd and 3rd floor as per bc 2702.2.20 (3) for all group r1 occupancy.rmdy:comply with code/
Jan 8, 2019 · Penalty $625
Resolve - Class - 2
Bc1704.1.1 failure to file for tr-1. at time of inspeciton after search at bis noted that there is no tri for structural stability as required by code. rmdy: comply with code.
Apr 6, 2018
Resolve - Class - 2
Bc3301.9.2.failure to provide/post permits at job sitr pursuant to subsection.at time of inspection observed that there was no permit for sidewalk shed posted as required by code.rem:comply with code
Apr 6, 2018
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operation: installation of cement blocks at upper level of a "2 story warehouse" as per nb #220169163 expire 1/11/14 w/o proper protection to
Jan 30, 2013 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/ the comms order contained in nov#34852547p issued on 12/20/11.note:load bearing wall removed.no permits.rem:comply w/ the comms order.
Feb 23, 2012
Resolve - Class - 1
Work w/o a permit: illegal work noted - 1) at 1st flr having removed rear envelop wall & connected 1st flr level w/adjacent property to west,known as 3990 park ave an approx 40'section of exterior wall removed
Dec 20, 2011
Resolve - Non-hazardous
Work without a permit. <noted>constructions of concrete walls at the front and side (e.173st) of property approx 70'x70'x23' high. remedy:obtain approvals and permit if feasible or remove illegal construction.
Jun 7, 2001 · Penalty $2,500
Active - Non-hazardous
Work w/o a permit. work noted: construction of concrete block walls atfront & side of property approx 70'x70'x23'. remedy: obtain permit orrestore premises to prior legal condition.
May 25, 1999 · Penalty $10,000
Active - Non-hazardous
Work without a permit. work noted: having constructed masonry block walls approx 50'x50' at front & side. remedy: file plans & obtain approval w/ permit or restore back to legal prior condition.
Mar 23, 1998 · Penalty $2,500
Active
Complaints
- Heat/hot water
Entire building
Dec 8, 2025 · Apt 4
Close - Heat/hot water
Entire building
Jun 11, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 7, 2025 · Apt 10
Close - Heat/hot water
Entire building
Feb 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2025 · Apt 29A
Close - Heat/hot water
Entire building
Dec 23, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 24, 2024 · Apt 44B
Close - Heat/hot water
Entire building
Aug 19, 2023 · Apt 232B D
Close
Show 27 more ↓
- Heat/hot water
Entire building
May 4, 2023 · Apt BUILDI
Close - Heat/hot water
Entire building
Mar 26, 2023 · Apt 76B
Close - Heat/hot water
Entire building
Nov 18, 2022 · Apt 56B
Close - Heat/hot water
Entire building
Jan 31, 2022 · Apt 37A
Close - Heat/hot water
Entire building
Jan 30, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2022 · Apt 15B
Close - Heat/hot water
Entire building
Feb 21, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 3, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
May 27, 2020 · Apt 37
Close - Heat/hot water
Entire building
Nov 15, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 15, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 6, 2019 · Apt 58
Close - Heat/hot water
Entire building
Jul 14, 2019 · Apt 77
Close - Heat/hot water
Entire building
May 13, 2019 · Apt 70
Close - Heat/hot water
Entire building
Apr 26, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 19, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2019 · Apt 69
Close - Heat/hot water
Entire building
Feb 11, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 11, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2018 · Apt 31
Close - Heat/hot water
Entire building
Dec 20, 2018 · Apt 33
Close - Heat/hot water
Entire building
Dec 20, 2018 · Apt 33
Close - Heat/hot water
Entire building
Dec 19, 2018 · Apt 33
Close - Heat/hot water
Entire building
Dec 19, 2018 · Apt 33
Close - Heat/hot water
Entire building
Dec 19, 2018 · Apt 31
Close - Heat/hot water
Entire building
Dec 18, 2018 · Apt 33
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Warehouse (E9)
- Year built
- 1945
- Floors
- 3
- Residential units
- —
- Building area
- 54,700 ft²
- Lot area
- 19,114 ft²
- Zoning
- M1-4
- Community board
- 203
- Council district
- 15
- Block / lot
- 2906 / 93
- Assessed value
- $1,935,900
- Landmark / historic district
- No
Questions about 463 East 173 Street
Who owns 463 East 173 Street?
The owner of record in NYC Department of City Planning PLUTO data is Tasma LLC.
Does 463 East 173 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 463 East 173 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 463 East 173 Street built?
City records list 1945 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.