1839 Sedgwick Avenue
Bronx, NY 10453BBL 2-02881-0093Map
Owner of record: Njr 1839 Sedgwick Management Corp.
1839 Sedgwick Avenue is a walk-up apartment building built in 1891 in Bronx, 10453. It has 7 residential units across 3 floors. The owner of record is Njr 1839 Sedgwick Management Corp.. HPD has recorded 254 housing violations here, most recently on September 22, 2026. 47 of the 50 most recent violations are still open.
- HPD violations
- 254
- DOB violations
- 6
- ECB violations
- 0
- HPD complaints
- 247
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 254
- BHazardous
Replace with new the missing latch set and its assemblys at street door at public hall, 1st story
Sep 22, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [latch set] street door at public hall, 1st story
Sep 22, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective latch set and its assemblys at vestibule door at public hall, 1st story
Sep 22, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [latch set] vestibule door at public hall, 1st story
Sep 22, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceacked concrete tread 2nd up from bottom at building front entrance stairs
Sep 22, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective concrete flashing at south exterior wall
Sep 22, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mechanical heavy duty lock at biilding entrance door. , 1st story
Sep 21, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story
Sep 21, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
Sep 21, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 3rd story
Sep 21, 2026
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 2nd story
Sep 21, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd story
Sep 21, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 2nd story
Sep 21, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 3, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Sep 3, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Sep 3, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Sep 3, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the private hallway located at apt 1a, 1st story, 1st apartment from west at north
Apr 13, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked and no response to knock.at door at basement
Apr 13, 2026
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq ft at east wall in the 1st bathroom from east located at apt 1a, 1st story, 1st apartment from west at north
Apr 13, 2026 · Apt 1A
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Apr 13, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Apr 13, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Apr 13, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd room from east at north located at apt 1a, 1st story, 1st apartment from west at north
Apr 9, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Apr 9, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door frame in the 2nd bathroom from east located at apt 1a, 1st story, 1st apartment from west at north
Apr 9, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd bathroom from east located at apt 1a, 1st story, 1st apartment from west at north
Apr 9, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile at east wall in the 1st bathroom from east located at apt 1a, 1st story, 1st apartment from west at north
Apr 9, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the 1st bathroom from east located at apt 1a, 1st story, 1st apartment from west at north
Apr 9, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Apr 9, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Apr 9, 2026 · Apt 1A
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 30 square feet of mold at east, north, west wall and window casing in the 1st bathroom from east located at apt 1a, 1st story, 1st apartment from west at north
Apr 9, 2026 · Apt 1A
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the 1st bathroom from east located at apt 1a, 1st story, 1st apartment from west at north
Apr 9, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Apr 9, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective rotted wood floor in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Mar 30, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd bathroom located at apt 1a, 1st story, 1st apartment from west at north
Mar 30, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective located at apt 1a, 1st story, 1st apartment from west at north
Mar 30, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective located at apt 1a, 1st story, 1st apartment from west at north
Mar 30, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective faucets at bathtub in the 1st bathroom located at apt 1a, 1st story, 1st apartment from west at north
Mar 30, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tile in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Mar 30, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective defective hinges at door leading basement at public hall, 1st story
Mar 25, 2026
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective electrical outlet plate at north wall in the 5th room from east at south located at apt 2a, 2nd story, 2nd apartment from west at north
Mar 25, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective concrete tread, 2nd from bottom up at front stoop , 1st story
Mar 25, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective defective door hinges at vestibule at public hall, 1st story
Mar 25, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Feb 7, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile at south wall in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Feb 7, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Feb 7, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less the 20 square feet at north east south and west wall in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Feb 7, 2026 · Apt 1A
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, east wall, 1st window frame from west at north wall in the 2nd bathroom from east located at apt 1a, 1st story, 1st apartment from west at north
Feb 5, 2026 · Apt 1A
Closed — Violation closed
DOB building violations · 6
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Electric
Outlet/switch
Sep 21, 2026 · Apt 1A
Close - Electric
Outlet/switch
Sep 21, 2026 · Apt 1A
Close - Paint/plaster
Wall
Sep 21, 2026 · Apt 1A
Close - Unsanitary condition
Mold
Sep 21, 2026 · Apt 1A
Close - Plumbing
Basin/sink
Sep 21, 2026 · Apt 1A
Close - General
Cabinet
Sep 21, 2026 · Apt 1A
Close - Paint/plaster
Wall
Sep 21, 2026 · Apt 1A
Close - Paint/plaster
Wall
Sep 21, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Sep 21, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Sep 21, 2026 · Apt 1A
Close
Show 40 more ↓
- Safety
Carbon monoxide detector
Sep 21, 2026 · Apt 1A
Close - Safety
Smoke detector
Sep 21, 2026 · Apt 1A
Close - Door/window
Door
Sep 21, 2026 · Apt BLDG
Close - Outside building
Roof door/hatch
Sep 21, 2026 · Apt BLDG
Close - Plumbing
Water supply
Aug 17, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Apr 12, 2026 · Apt 1A
Close - Electric
No lighting
Apr 12, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Apr 12, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Apr 12, 2026 · Apt 1A
Close - Unsanitary condition
Mold
Apr 12, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Apr 12, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Apr 8, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Apr 7, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Feb 23, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Feb 5, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Jan 23, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BUILDI
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 16, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Jan 6, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 4, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Dec 31, 2025 · Apt 1A
Close - Heat/hot water
Apartment only
Dec 29, 2025 · Apt 1A
Close - Heat/hot water
Apartment only
Dec 27, 2025 · Apt 1A
Close - Heat/hot water
Apartment only
Dec 26, 2025 · Apt 1A
Close - Heat/hot water
Apartment only
Dec 22, 2025 · Apt 1A
Close - Heat/hot water
Apartment only
Dec 14, 2025 · Apt 1A
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt 1A
Close - Safety
Window guard broken/missing
Dec 1, 2025 · Apt 1A
Close - Heat/hot water
Apartment only
Nov 29, 2025 · Apt 1A
Close - Heat/hot water
Apartment only
Nov 23, 2025 · Apt 1A
Close - Safety
Window guard broken/missing
Nov 10, 2025 · Apt 1A
Close - Heat/hot water
Apartment only
Oct 13, 2025 · Apt 1A
Close - Safety
Carbon monoxide detector
Sep 19, 2025 · Apt 1A
Close - Safety
Window guard broken/missing
Sep 19, 2025 · Apt 1A
Close - Safety
Smoke detector
Sep 19, 2025 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1891
- Floors
- 3
- Residential units
- 7
- Building area
- 9,963 ft²
- Lot area
- 9,492 ft²
- Zoning
- R6
- Community board
- 205
- Council district
- 16
- Block / lot
- 2881 / 93
- Assessed value
- $602,550
- Landmark / historic district
- No
HPD registration #202829, last renewed Dec 1, 2025.
Questions about 1839 Sedgwick Avenue
Who owns 1839 Sedgwick Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Njr 1839 Sedgwick Management Corp..
Does 1839 Sedgwick Avenue have violations?
Yes. NYC HPD has recorded 254 housing violations at this property.
Is 1839 Sedgwick Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1839 Sedgwick Avenue built?
City records list 1891 as the year it was built.
How many apartments are in 1839 Sedgwick Avenue?
It has 7 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.