1432 Shakespeare Avenue
Bronx, NY 10452BBL 2-02872-0105Map
Owner of record: 1432 Shakespeare Ave LLC
1432 Shakespeare Avenue is a walk-up apartment building built in 1925 in Bronx, 10452. It has 3 residential units across 2 floors. The owner of record is 1432 Shakespeare Ave LLC. HPD has recorded 345 housing violations here, most recently on September 14, 2026. 48 of the 50 most recent violations are still open.
- HPD violations
- 345
- DOB violations
- 0
- ECB violations
- 2
- HPD complaints
- 366
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 345
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Sep 14, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Sep 14, 2026 · Apt 1
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Sep 14, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Sep 14, 2026 · Apt 1
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures at sink in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Sep 14, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Sep 14, 2026 · Apt 1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Sep 14, 2026 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective connection wasteline at sink in the kitchen located at bsmt-apt 1a, 1st bsmt-apt from north at east
Jul 25, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the kitchen located at apt 1a, 1st apartment from north at east
Jul 25, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall, ceiling, south wall in the bathroom located at bsmt-apt 1a, 1st bsmt-apt from north at east
Jul 25, 2026 · Apt 1A
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from west at north wall, north wall in the kitchen located at bsmt-apt 1a, 1st bsmt-apt from north at east
Jul 25, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from south at west wall in the foyer located at bsmt-apt 1a, 1st bsmt-apt from north at east
Jul 25, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at bsmt-apt 1a, 1st bsmt-apt from north at east
Jul 25, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at bsmt-apt 1a, 1st bsmt-apt from north at east
Jul 25, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall in the foyer located at bsmt-apt 1a, 1st bsmt-apt from north at east
Jul 25, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall in the bathroom located at bsmt-apt 1a, 1st bsmt-apt from north at east
Jul 25, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at bsmt-apt 1a, 1st bsmt-apt from north at east
Jul 25, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at bsmt-apt 1a, 1st bsmt-apt from north at east
Jul 25, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq. ft. at base cabinet at sink in the kitchen located at apt 1fl, 1st story, 1st apartment from west at north
Jul 17, 2026 · Apt 1FL
Open — Notice of issuance sent to tenant - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1fl, 1st story, 1st apartment from west at north
Jul 17, 2026 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1fl, 1st story, 1st apartment from west at north
Jul 17, 2026 · Apt 1FL
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1fl, 1st story, 1st apartment from west at north
Jul 17, 2026 · Apt 1FL
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt ground, 1st story, 1st apartment from north at east
Jun 19, 2026 · Apt GROUND
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt ground, 1st story, 1st apartment from north at east
Jun 19, 2026 · Apt GROUND
Open — Notice of issuance sent to tenant - BHazardous
M/d law abate the nuisance consisting of heat on (non heat day) in the entire apartment located at apt ground, 1st story, 1st apartment from north at east
Jun 19, 2026 · Apt GROUND
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Jun 7, 2026 · Apt 1
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from west at north original violation 18986912 issued 07-jun-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jun 7, 2026 · Apt 1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Jun 7, 2026 · Apt 1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Jun 7, 2026 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
M/d law abate the nuisance consisting of acessive heat at all radiators in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Jun 7, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at observed dropings in the entire apartment located at apt ground, 1st story, 1st apartment from west at north
Apr 1, 2026 · Apt GROUND
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 3rd room from north located at apt ground, 1st story, 1st apartment from west at north
Apr 1, 2026 · Apt GROUND
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at west located at apt ground, 1st story, 1st apartment from west at north
Apr 1, 2026 · Apt GROUND
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective hole at wood flooring in the foyer located at apt ground, 1st story, 1st apartment from west at north
Apr 1, 2026 · Apt GROUND
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt ground, 1st story, 1st apartment from west at north
Apr 1, 2026 · Apt GROUND
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace with new the missing access panel at floor in the foyer located at apt ground, 1st apartment from south at west
Mar 14, 2026 · Apt GROUND
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures ... in the entire apartment located at apt ground, 1st apartment from south at west
Mar 14, 2026 · Apt GROUND
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroom located at apt ground, 1st apartment from south at west
Mar 14, 2026 · Apt GROUND
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt ground, 1st apartment from south at west
Mar 14, 2026 · Apt GROUND
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt ground, 1st apartment from south at west
Mar 14, 2026 · Apt GROUND
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt ground, 1st apartment from south at west
Mar 14, 2026 · Apt GROUND
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt ground, 1st apartment from south at west
Mar 14, 2026 · Apt GROUND
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 1st room from east located at apt ground, 1st apartment from south at west
Mar 14, 2026 · Apt GROUND
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east located at apt ground, 1st apartment from south at west
Mar 14, 2026 · Apt GROUND
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt ground, 1st story, 1st apartment from east at south
Mar 9, 2026 · Apt GROUND
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt ground, 1st story, 1st apartment from east at south
Mar 9, 2026 · Apt GROUND
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the foyer located at apt ground, 1st story, 1st apartment from east at south
Mar 9, 2026 · Apt GROUND
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective hole at plywood floor in the foyer located at apt ground, 1st story, 1st apartment from east at south
Mar 9, 2026 · Apt GROUND
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt ground, 1st story, 1st apartment from east at south
Mar 9, 2026 · Apt GROUND
Open — Notice of issuance sent to tenant
DOB building violations · 0
No DOB violations on record
ECB violations · 2
- Class - 1
Occupancy contrary to that allowed by the certificate of occupancy and department records. at time of inspection, observed an illegally created class "a" apartment at the 1st floor, containing a full kitchen an
Feb 5, 2026 · Penalty $6,280
Active - Class - 1
Occupancy in contrary to that allowed by c/o and/or department of building record. illegally created class"a" apartment at 1st sty. with a full bathroom and kitchen. no 2nd means of egress present. vacate warra
Aug 19, 2023 · Penalty $2,500
Active
Complaints
- Unsanitary condition
Mold
Sep 2, 2026 · Apt 1
Close - Plumbing
Water supply
Sep 2, 2026 · Apt 1
Close - Water leak
Slow leak
Jul 17, 2026 · Apt 1
Close - Unsanitary condition
Mold
Jul 17, 2026 · Apt 1
Close - Plumbing
Basin/sink
Jul 10, 2026 · Apt 1FL
Close - Unsanitary condition
Mold
Jul 10, 2026 · Apt 1FL
Close - Heat/hot water
Apartment only
Jun 18, 2026 · Apt GROUND
Close - Heat/hot water
Apartment only
Jun 3, 2026 · Apt 1
Close - Unsanitary condition
Pests
Apr 8, 2026 · Apt 2F
Close - Unsanitary condition
Pests
Mar 18, 2026 · Apt GROUND
Close
Show 40 more ↓
- Plumbing
Water supply
Mar 18, 2026 · Apt GROUND
Close - Flooring/stairs
Stairs
Mar 14, 2026 · Apt 2F
Close - Heat/hot water
Apartment only
Mar 14, 2026 · Apt 2F
Close - Unsanitary condition
Pests
Mar 8, 2026 · Apt GROUND
Close - Flooring/stairs
Floor
Mar 8, 2026 · Apt GROUND
Close - Unsanitary condition
Pests
Mar 8, 2026 · Apt GROUND
Close - Plumbing
Water supply
Mar 8, 2026 · Apt GROUND
Close - Water leak
Slow leak
Mar 8, 2026 · Apt GROUND
Close - Heat/hot water
Apartment only
Mar 8, 2026 · Apt GROUND
Close - Heat/hot water
Apartment only
Feb 26, 2026 · Apt GROUND
Close - Flooring/stairs
Floor
Feb 18, 2026 · Apt 1AGROU
Close - Water leak
Heavy flow
Feb 18, 2026 · Apt 1AGROU
Close - Heat/hot water
Apartment only
Feb 18, 2026 · Apt 1AGROU
Close - Water leak
Slow leak
Feb 18, 2026 · Apt 1AGROU
Close - Water leak
Slow leak
Feb 17, 2026 · Apt GRDFL
Close - Water leak
Heavy flow
Feb 17, 2026 · Apt GRDFL
Close - Flooring/stairs
Floor
Feb 17, 2026 · Apt GRDFL
Close - Water leak
Heavy flow
Feb 16, 2026 · Apt 2F
Close - Door/window
Window frame
Feb 16, 2026 · Apt FIRSTF
Close - Water leak
Slow leak
Feb 16, 2026 · Apt FIRSTF
Close - Flooring/stairs
Floor
Feb 16, 2026 · Apt FIRSTF
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Feb 16, 2026 · Apt FIRSTF
Close - Door/window
Door
Feb 16, 2026 · Apt FIRSTF
Close - Unsanitary condition
Pests
Feb 16, 2026 · Apt FIRSTF
Close - Heat/hot water
Apartment only
Feb 16, 2026 · Apt FIRSTF
Close - Flooring/stairs
Floor
Feb 13, 2026 · Apt GROUND
Close - Heat/hot water
Apartment only
Feb 13, 2026 · Apt GROUND
Close - Door/window
Window frame
Feb 13, 2026 · Apt BUILDI
Close - Heat/hot water
Apartment only
Feb 13, 2026 · Apt BUILDI
Close - Heat/hot water
Entire building
Feb 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Feb 9, 2026 · Apt GROUND
Close - Flooring/stairs
Floor
Feb 9, 2026 · Apt GROUND
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt 2F
Close - Heat/hot water
Apartment only
Feb 9, 2026 · Apt 2
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt 1GROUN
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt 2F
Close - Door/window
Door
Feb 3, 2026 · Apt 2F
Close - Flooring/stairs
Floor
Feb 2, 2026 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1925
- Floors
- 2
- Residential units
- 3
- Building area
- 4,422 ft²
- Lot area
- 3,645 ft²
- Zoning
- R7-1
- Community board
- 204
- Council district
- 16
- Block / lot
- 2872 / 105
- Assessed value
- $79,680
- Landmark / historic district
- No
HPD registration #215336, last renewed Jul 8, 2025.
Questions about 1432 Shakespeare Avenue
Who owns 1432 Shakespeare Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1432 Shakespeare Ave LLC.
Does 1432 Shakespeare Avenue have violations?
Yes. NYC HPD has recorded 345 housing violations at this property.
Is 1432 Shakespeare Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1432 Shakespeare Avenue built?
City records list 1925 as the year it was built.
How many apartments are in 1432 Shakespeare Avenue?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.