29 Featherbed Lane
Bronx, NY 10453BBL 2-02865-0122Map
Owner of record: Featherbed Development LLC
29 Featherbed Lane is an elevator apartment building built in 2022 in Bronx, 10453. It has 160 residential units across 12 floors. The owner of record is Featherbed Development LLC. HPD has recorded 7 housing violations here, most recently on June 12, 2026.
- HPD violations
- 7
- DOB violations
- 5
- ECB violations
- 55
- HPD complaints
- 13
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 7
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door stair 'a' at public hall, 12th story
Jun 12, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door stair 'b' at public hall, 12th story
Jun 12, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at refuse room at public hall, 10th story
Jun 12, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper door in refuse room at public hall, 5th story
Jun 12, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper door in refuse room at public hall, 6th story
Jun 12, 2026
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall, 1st story
Dec 17, 2025
Closed — Violation dismissed
DOB building violations · 5
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 7, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 1, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed
ECB violations · 55
- Class - 1
In response to incident where worker fell off supported pipe scaffold hurting his left leg while doing facade work on 9th floor it was reported that mortar bucket slipped and hit worker ( helper ) in chest caus
Dec 1, 2023 · Penalty $10,000
Resolve - Class - 1
In response to incident where worker got injured upon request to see pre-shift safety meeting log the one provided did not show worker was present and no mention as to what his task was also no mention of preca
Dec 1, 2023 · Penalty $5,000
Resolve - Class - 1
Fire extinguishers. at time of inspection at new 12 story building active jobsite i observed fire extinguishers with outdated tags from 2022 still in use throughout jobsite.provide updated and inspected fire ex
Dec 1, 2023 · Penalty $1,250
Resolve - Class - 1
T time of inspection i observed supported pipe scaffold erected and inadequately maintain with material and debris scattered throughout creating a trip and fall hazard to workers and persons accessing scaffold
Dec 1, 2023 · Penalty $2,500
Resolve - Class - 1
Material storage in street. at time of inspection i observed material, machine and debris stored in street not properly enclosed with yodok and missing chain link fence to prevent pedestrians from going in als
Dec 1, 2023 · Penalty $2,500
Resolve - Class - 1
Failure to maintain safety measures. at time of inspection i observed active construction work in progress. i observed missing circuit breaker cover panels throughout jobsite showing exposed electrical wires cr
Dec 1, 2023 · Penalty $2,500
Resolve - Class - 1
In response to incident where worker got injured when he fell off scaffold hurting his left leg upon request to see his site specific orientation the one provided was not site specific and no mention as to spec
Dec 1, 2023
Resolve - Class - 2
At the time of my inspection i observed a metal storage locker being used as an office by the site safety coordinator as an office on the street surrounded by yodocks. comply with dot regualations
Aug 17, 2023
Resolve - Class - 1
At the time of my inspection of a new 12 story building i observed toe boards, end gates and safety scaffolding pins missing on several elevations at both exposures 1 and 3provide and maintain supported scaffol
Aug 17, 2023 · Penalty $2,530
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements.as noted:at time of inspection at an active jobsite for proposed 12 storybuilding already at the bulkhead observed inadequate housekeeping of l
Jun 1, 2023 · Penalty $1,250
Resolve
Show 40 more ↓
- Class - 2
12 story nb active site. observed concrete operations in progress at exp#1 street level. unfiltered concrete washout water running down to sewer/catch basin/drain leeching onto ground no washout box. observed 2
Apr 17, 2023 · Penalty $2,500
Resolve - Class - 1
12 story nb active site.observed holes on concrete slab approx 2'x2'ft openings on all floors.not adequately protected with guardrail system for fall protection.plywood not properly secured/loose as per 3306.9.
Apr 17, 2023 · Penalty $2,500
Resolve - Class - 2
A 12 story nb active site. i observed construction debris accumulated through out site bricks/wood cardboard piles etc.combustible materials at multiple locations walkways interior/exterior. not properly stored
Apr 17, 2023 · Penalty $625
Resolve - Class - 2
12 story nb active site.observed sidewalk shed exp#1 with pipe scaffolding on top at all exposures.scaffold at exp#1 missing tie back on 8 fl.at rear exp#3 base level mudsills covered with dirt/debris (2) c cha
Apr 17, 2023 · Penalty $625
Resolve - Class - 1
Failure to provide adequate storage zone as per code specifications. at time of inspection observed storage zone yodok's in place not filled with water, missing some connections and missing 4' barrier on top of
Mar 15, 2023 · Penalty $625
Resolve - Class - 1
Note: at the time of inspection 12 sty bldg. under construction at 11th floor level, active job site. also observed unsafe scaffold platform at exp1, 9th floor level. platform not fully planked (bc3314.5.1), no
Jan 11, 2023
Resolve - Class - 1
Note: at the time of inspection observed concrete plank installation operation in progress at 11th floor level. also observed site have standpipe system, asking for hydrostatic pressure test report, nothing pro
Jan 11, 2023
Resolve - Class - 1
Note: at the time of inspection 12 sty bldg. under construction at 11th floor level, active job site. also observed inadequate housekeeping at cellar have excavated dart, stagnant water, discarded woods creatin
Jan 11, 2023
Resolve - Class - 1
At the time of my inspection of a 12 story building at 8th floor level approximately 75 feet in height construction work in progress, i observed that there were no horizontal netting in place as require and the
Oct 19, 2022 · Penalty $2,530
Resolve - Class - 1
At time of my inspection of a proposed 12 story building at 8th floor,75 ft in height i noticed no standpipe in readiness. as per code construction of a new building, reaches a height of 75 feet or greater ab
Oct 18, 2022 · Penalty $2,530
Resolve - Class - 1
At time of my inspection of a new building proposed 12 story at the 8th floor . i noticed no hoist in readiness as per code. code requires hoist to be in readiness once building reaches 75ft about ground level
Oct 18, 2022 · Penalty $2,530
Resolve - Class - 1
Bc 3309.14 protection of windows.as noted:at time of inspection at an active jobsite for a proposed 12 story building at 5th floor level.observed windows of adjoining property within 20 feet facing the new cons
Oct 12, 2022 · Penalty $625
Resolve - Class - 1
At time of inspection of a proposed 12 story nb active site. i observed workers installing rebar at exp#1. within 5 ft of active pedestrian walkway in a high traffic area. with no adequate protection or other m
Jul 13, 2022 · Penalty $2,500
Resolve - Class - 2
At time of inspection of a proposed 12 story nb active jobsite. i observed construction fence in place at exp#1,3,4. at exp#2 fence was missing/not in place also at exp#1 fence was not maintained plywood sectio
Jul 13, 2022
Resolve - Class - 1
At time of inspection of a proposed 12 story nb active site i observed rebar in place approx. 12 ft high with no protection in place fence missing at exp#2. also observed construction fence not extended 5 ft ov
Jul 13, 2022 · Penalty $500
Resolve - Class - 2
At time of inspection of a proposed 12 story active site i observed a sidewalk shed in place at exp#1,4. upon futher inspection of sidewalk shed it was observed that shed was missing horizontal brace at 2 secti
Jul 13, 2022
Resolve - Class - 2
Failure to post or properly post permit for work at premises(construction fence permit)at the time of my inspection on a closed and permitted jobsite which appears to be in excavation phase,i observed jobsite f
Jan 13, 2022
Resolve - Class - 2
Expired permit for construction fence at time of inspection on a active permit site of earthwork observed jobsite fence in place not maintained and upon research in department records i discovered the fence per
Oct 15, 2021 · Penalty $625
Resolve - Class - 2
Jobsite fence not constructed or maintained per code at time of inspection on a active permit site of earhwork for 8 story new building i observed jobsite fence in place not constructed or maintained note:missi
Oct 15, 2021 · Penalty $500
Resolve - Class - 1
Sec. 3307.2.1;3307.2.6 failure comply dot requirements. pedestrian pathway. note: observed exp#1 temporary pathway for pdestrian at public street,width of pathway not compliant w/dot requirements(5 feet width)
Jun 7, 2021 · Penalty $312
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation #39012570n issued on 11/08/2019,and to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2).an acceptible cert
Dec 2, 2020
Resolve - Class - 2
Failure to maintain viewing panels pursuant to sub-section.at time time of inspection,the construction fence at exposure#1(feather bed lane)and at the return fence corner of expo#4,the cut-outs for the viewing
Apr 24, 2020
Resolve - Class - 2
Failure to comply with d.d.t regulations(public pathway).at time of inspection a timber street barrier system was installed the length of the property at front exposure#1(f batherbed lane).however at the right
Apr 24, 2020
Resolve - Class - 2
Failure to post permit for work at fence project information panel.at time of inspection,a fence project information panel was in place at front exposure#1(featherbed lane).however,the active foundation earthwo
Apr 24, 2020
Resolve - Class - 2
Jobsite fence uot maintained pursuant to sub-section.at time of inspection the fence at exposure#1 was filled with unlawful vanalized markings,at exposure #2 sections of the fence had collapsed.expo#2 is adjace
Apr 24, 2020
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirement.at time of inspection it was observed that multiples areas of the public side of the construction site property was littered with general househ
Apr 24, 2020 · Penalty $625
Resolve - Class - 2
Excavation work (and also construction fence) onto department of transportation stair/street property at east side of lot contrary to approved plans job number 220453168., conform work to approved construction
Nov 8, 2019 · Penalty $1,250
Resolve - Class - 2
3301.9.1.2:information panel at time of inspection of a proposed 8 sty nb @ grade level i observed jobsite fence in place with no information panel jobsite construction fenceis required to have panel posted wit
Jul 24, 2019
Resolve - Class - 2
View panels at time of inspection of a porposed 8 sty nb # grade level i observed jobsite construction hemce in place with inadequate view panels which makes it difficulte to see onto jobsit provide adequate vi
Jul 24, 2019
Resolve - Class - 2
Job site plywood construction fence not pursuant to subsection. as noted, at time of inspection, closed, graded site i observed at exp1 plywood construction fence leaning inward and outward endangering the
May 1, 2018
Resolve - Class - 2
Failure to maintain chain link fence. 1-at east side near steps - horizontal head bar dislodged from post (vertical post) 2-north west corner intersection exp #2 & #3 missing fence. remedy: maintain fence as
Feb 8, 2013 · Penalty $2,500
Active - Class - 2
Sec. 28-105.1 work w/o a permit - expired permit #200812264-01-eq fence express 12/4/07. remedy: renew permit.
Feb 8, 2013 · Penalty $4,000
Active - Hazardous
Job site fence defective. construction fence erected under permit #200812255 issued 09/10/06 expires 12-31-06 construction fence has collapsed into lot of construction site. site is now open & accessible
Jun 9, 2006 · Penalty $500
Resolve - Hazardous
Defective job site fence. job site fence erected under permit #200812255. solid wood fence has totally collapsed onto construction site rentering the site hazardous open & accessible to unauthorized entry.
Jun 8, 2006 · Penalty $500
Resolve - Hazardous
Jobsite fence defective.note:at the front of this excavated site, the jobsite fence has collapsed, the fence on the east side has also partially collapsed.remedy:repair or replace fence
May 24, 2006 · Penalty $500
Resolve - Hazardous
Failure to provide 8' high fence where required during excavation operation.lot has been partially excavated with only 4' high fence provided on the west side of the property.remedy:provide 8' high fence
May 24, 2006 · Penalty $1,250
Resolve - Hazardous
Failure to provide protection at sides of excavation.note:no sheeting,shoring or bracing has been provided to the sides of this approx 14' deep excavation which is on a sloping site.
May 24, 2006 · Penalty $1,000
Resolve - Hazardous
Failure to provide 8' high fence where required during excavation operations approx 32 linear feet of wooden construction fence @ front of site has collapsed leaving site open & unprotected to public. remedy:
May 8, 2006 · Penalty $480
Resolve - Hazardous
Failure to maintain-hazardous. construction fence has collapsed into the site. remedy: maintain fence.
Mar 6, 2006 · Penalty $800
Resolve - Hazardous
Failure to provide 8'foot high fence where required during excavation operations. as per prior violation #13106c5fg01 no fence at west side of property. conditions still exist. (note) fence at front of property
Feb 22, 2006 · Penalty $1,250
Resolve
Complaints
- Appliance
Electric/gas range
Aug 10, 2026 · Apt 10K
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt APT1J
Close - Heat/hot water
Apartment only
Feb 11, 2018 · Apt 4C
Close - Heat/hot water
Apartment only
Feb 16, 2017 · Apt 3
Close - Heat/hot water
Apartment only
Feb 16, 2017 · Apt 3
Close - Heat/hot water
Entire building
Jan 30, 2017 · Apt 3FL
Close - Plumbing
Water supply
Jan 28, 2017 · Apt BLDG
Close - Electric
Power outage
Jan 28, 2017 · Apt 2FLOOR
Close
Show 3 more ↓
- Heat/hot water
Apartment only
Jan 28, 2017 · Apt 2FLOOR
Close - Heat/hot water
Entire building
Dec 8, 2016 · Apt 2FL
Close - Appliance
Electric/gas range
Dec 8, 2016 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2022
- Floors
- 12
- Residential units
- 160
- Building area
- 115,685 ft²
- Lot area
- 16,080 ft²
- Zoning
- R8A
- Community board
- 205
- Council district
- 14
- Block / lot
- 2865 / 122
- Assessed value
- $8,281,350
- Landmark / historic district
- No
HPD registration #229346, last renewed Jul 24, 2025.
Questions about 29 Featherbed Lane
Who owns 29 Featherbed Lane?
The owner of record in NYC Department of City Planning PLUTO data is Featherbed Development LLC.
Does 29 Featherbed Lane have violations?
Yes. NYC HPD has recorded 7 housing violations at this property.
Is 29 Featherbed Lane rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 29 Featherbed Lane built?
City records list 2022 as the year it was built.
How many apartments are in 29 Featherbed Lane?
It has 160 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.