2024 Davidson Avenue
Bronx, NY 10453BBL 2-02863-0016Map
Owner of record: 1988 Davidson LLC
2024 Davidson Avenue is an elevator apartment building built in 1926 in Bronx, 10453. It has 16 residential units across 5 floors. The owner of record is 1988 Davidson LLC. HPD has recorded 79 housing violations here, most recently on May 21, 2026. 2 of the 50 most recent violations are still open.
- HPD violations
- 79
- DOB violations
- 24
- ECB violations
- 3
- HPD complaints
- 73
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 79
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all ceiling, wall, doors, trims, borders, casings, sills, and frames in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
May 21, 2026 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
May 21, 2026 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1a, 1st story, 1st apartment from west at north
May 21, 2026 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
May 21, 2026 · Apt 1A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
May 21, 2026 · Apt 1A
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees f at all water fixtures in the entire apartment located at apt 5a, 5th story, 1st apartment from west at north
Feb 6, 2026 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees f at all water fixtures in the entire apartment located at apt 2c, 2nd story, 2nd apartment from east at south
Feb 6, 2026 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 6, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closure arm at building entrance door , 1st story
Feb 6, 2026
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt 2c, 2nd story, 2nd apartment from east at south
Feb 6, 2026 · Apt 2C
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5a, 5th story, 1st apartment from west at north
Feb 6, 2026 · Apt 5A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Jan 31, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at .. in the entrance located at apt 1a, 1st story, 1st apartment from west at north
Jan 31, 2026 · Apt 1A
Closed — Violation dismissed - BHazardous
Replace with new the missing electrical outlet cover plate in the 3rd room from east at north located at apt 1a, 1st story, 1st apartment from west at north
Jan 31, 2026 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective inoperable hinges at door in the entrance located at apt 1a, 1st story, 1st apartment from west at north
Jan 31, 2026 · Apt 1A
Open — Not complied with - BHazardous
Refit door in the 1st room from north at east located at apt 1a, 1st story, 1st apartment from west at north
Jun 5, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective splintering wooden door frame in the 1st room from north at east located at apt 1a, 1st story, 1st apartment from west at north
Jun 5, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at east located at apt 1a, 1st story, 1st apartment from west at north
Jun 5, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Jun 5, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Jun 5, 2024 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeds the maximum of 130 degrees in the entire apartment located at apt 5a, 5th story, 2nd apartment from west at north
Jan 22, 2024 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from east located at apt 5a, 5th story, 2nd apartment from west at north
Jan 22, 2024 · Apt 5A
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Jan 6, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets tub spout in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Jan 6, 2024 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Jan 6, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Jan 6, 2024 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Jan 6, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective at ceiling (light fixture) in the foyer located at apt 1a, 1st story, 1st apartment from west at north
Jan 6, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective ceiling light fixture in the private hallway located at apt 1a, 1st story, 1st apartment from west at north
Jan 6, 2024 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system lock door at boiler room
Jan 6, 2024
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at north located at apt 5b, 5th story, 1st apartment from east at south
Aug 30, 2023 · Apt 5B
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of metal studs at ceiling in the 1st room from east at north located at apt 5b, 5th story, 1st apartment from east at south
Aug 30, 2023 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Aug 29, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Aug 29, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 29, 2023
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 3rd room from north located at apt 5b, 5th story, 1st apartment from east at south
Aug 29, 2023 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Jan 24, 2020 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at basement
Jan 24, 2020
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock installed at door to room with fire escape in the 1st room from east located at apt 1b, 1st story, 1st apartment from east at south
Jan 24, 2020 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective located at apt 1b, 1st story, 1st apartment from east at south
Jan 24, 2020 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 1b, 1st story, 1st apartment from east at south
Jan 24, 2020 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1b, 1st story, 1st apartment from east at south
Jan 24, 2020 · Apt 1B
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wall erected sub dividing room into 2 in the 2nd room from east at south located at apt 1b, 1st story, 1st apartment from east at south
Jan 24, 2020 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration low door frame installed in the kitchen located at apt 1b, 1st story, 1st apartment from east at south
Jan 24, 2020 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Dec 11, 2019 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system no sign posted , 1st story
Dec 11, 2019
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective ceramic tiles at south wall in the 1st bathroom from north located at apt 4c, 4th story, 1st apartment from south at west
Dec 10, 2019 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors ... in the entrance located at apt 4c, 4th story, 1st apartment from south at west
Dec 10, 2019 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west
Dec 10, 2019 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west
Dec 10, 2019 · Apt 4C
Closed — Violation dismissed
DOB building violations · 24
- Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 27, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 15, 2017
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 21, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 9, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2011
Dob violation - resolved
Show 14 more ↓
- Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 15, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 26, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 25, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 4, 2005
Dob violation - resolved - Elevator elevatorrequired
2p5201
Feb 8, 2002
Dob violation - resolved - Elevator elevatorrequired
2p5201
Nov 24, 1999
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed - Elevator elevatorrequired
Device #2p5201
Mar 28, 1991
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 7, 1988
Dob violation - resolved - Elevator elevatorrequired
(51)restore elevator to service so a proper inspection may be made by an inspector from this dept
Sep 6, 1988
Dob violation - resolved
ECB violations · 3
- Class - 1
(42m7/2x10)42m7-no door lock monitoring installed in controller as mandated by 3/10/12 of apendix k3 of 2014 nyc building code.remedy:file application & install.
Jul 29, 2021 · Penalty $1,250
Active - Class - 2
B254,36. 36- as per class 254-36 boiler not registere as per dob records correct all violating conditions and submit a certificate of correction.
Aug 9, 2017 · Penalty $500
Active - Class - 2
05x10,08v01,19m07,26d06,39x10,42g11. 05x10-repair zone lock for car door; 19m07-provide bottom safety retainer (fire gibbs) for 4th & 2nd flr hoistway door; 39x10-repair light top of car; 42g11-replace bridge
May 29, 2013
Resolve
Complaints
- Door/window
Door
May 6, 2026 · Apt 1A
Close - Paint/plaster
Wall
May 6, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
May 6, 2026 · Apt 1A
Close - Plumbing
Bathtub/shower
May 6, 2026 · Apt 1A
Close - Door/window
Window frame
May 6, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt 3C
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 1A
Close
Show 40 more ↓
- Unsanitary condition
Garbage/recycling storage
Dec 28, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 28, 2025 · Apt 1A
Close - Water leak
Slow leak
Oct 24, 2025 · Apt 5A
Close - Heat/hot water
Apartment only
Feb 2, 2025 · Apt 5A
Close - Heat/hot water
Entire building
Dec 8, 2024 · Apt 5A
Close - Heat/hot water
Entire building
Jan 20, 2024 · Apt 5A
Close - Heat/hot water
Apartment only
Jan 3, 2024 · Apt 1A
Close - Plumbing
Bathtub/shower
Jan 3, 2024 · Apt 1A
Close - Electric
Outlet/switch
Jan 3, 2024 · Apt 1A
Close - Paint/plaster
Ceiling
Aug 29, 2023 · Apt 5B
Close - Unsanitary condition
Mold
Aug 29, 2023 · Apt 5B
Close - Paint/plaster
Ceiling
Aug 27, 2023 · Apt 5B
Close - Unsanitary condition
Mold
Aug 27, 2023 · Apt 5B
Close - Paint/plaster
Ceiling
Aug 27, 2023 · Apt 5B
Close - Water leak
Heavy flow
Aug 27, 2023 · Apt 5B
Close - Heat/hot water
Apartment only
Feb 4, 2023 · Apt 5A
Close - Heat/hot water
Apartment only
Nov 15, 2022 · Apt 4C
Close - Heat/hot water
Entire building
Jan 8, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 27, 2021 · Apt 4C
Close - Heat/hot water
Apartment only
Jan 22, 2020 · Apt 1A
Close - Heat/hot water
Apartment only
Dec 10, 2019 · Apt 1A
Close - Heat/hot water
Apartment only
Dec 6, 2019 · Apt 1A
Close - Paint/plaster
Ceiling
Dec 5, 2019 · Apt 4C
Close - Paint/plaster
Ceiling
Dec 5, 2019 · Apt 4C
Close - Paint/plaster
Wall
Dec 5, 2019 · Apt 4C
Close - Paint/plaster
Wall
Dec 5, 2019 · Apt 4C
Close - Unsanitary condition
Mold
Dec 5, 2019 · Apt 4C
Close - General
Cooking gas
Dec 5, 2019 · Apt 4C
Close - General
Cooking gas
Dec 2, 2019 · Apt 1A
Close - Heat/hot water
Entire building
Dec 27, 2018 · Apt 1
Close - Heat/hot water
Apartment only
Dec 9, 2017 · Apt 4C
Close - Heat/hot water
Entire building
Dec 4, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2016 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 13, 2016 · Apt 1A
Close - Unsanitary condition
Pests
Aug 13, 2016 · Apt 1A
Close - Unsanitary condition
Pests
Aug 13, 2016 · Apt 1A
Close - Unsanitary condition
Pests
Aug 13, 2016 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 22, 2016 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 22, 2016 · Apt 1A
Close - Unsanitary condition
Pests
Jan 22, 2016 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1926
- Floors
- 5
- Residential units
- 16
- Building area
- 12,250 ft²
- Lot area
- 3,600 ft²
- Zoning
- R7-1
- Community board
- 205
- Council district
- 14
- Block / lot
- 2863 / 16
- Assessed value
- $793,350
- Landmark / historic district
- No
HPD registration #201949, last renewed Aug 21, 2025.
Questions about 2024 Davidson Avenue
Who owns 2024 Davidson Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1988 Davidson LLC.
Does 2024 Davidson Avenue have violations?
Yes. NYC HPD has recorded 79 housing violations at this property.
Is 2024 Davidson Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2024 Davidson Avenue built?
City records list 1926 as the year it was built.
How many apartments are in 2024 Davidson Avenue?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.