212 East Tremont Avenue
Bronx, NY 10457BBL 2-02804-0011Map
Owner of record: 210-12 East Tremont Ave H D F C
212 East Tremont Avenue is a walk-up apartment building built in 1912 in Bronx, 10457. It has 10 residential units across 5 floors. The owner of record is 210-12 East Tremont Ave H D F C. HPD has recorded 207 housing violations here, most recently on April 30, 2026. 41 of the 50 most recent violations are still open.
- HPD violations
- 207
- DOB violations
- 45
- ECB violations
- 5
- HPD complaints
- 113
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 207
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed - BHazardous
Provide approve glass at building entrance door ( from street to vestibule door) at public hall, 1st story
Apr 20, 2026
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of plexiglass at building entrance door ( from street to vestibule door) at public hall, 1st story
Apr 20, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective roof bulkhead door
Jul 31, 2025
Closed — Violation closed - BHazardous
Remove the illegal fastening consisting of key operated push bar at roof bulkhead door to allow for re-entry
Jul 31, 2025
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective intercom system located at apt 4, 4th story, 2nd apartment from east at south
Jul 31, 2025 · Apt 4
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 4, 4th story, 2nd apartment from east at south
Jul 31, 2025 · Apt 4
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 4, 4th story, 2nd apartment from east at south
Jul 31, 2025 · Apt 4
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 4, 4th story, 2nd apartment from east at south
Jul 31, 2025 · Apt 4
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt 4, 4th story, 2nd apartment from east at south
Jul 31, 2025 · Apt 4
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4, 4th story, 2nd apartment from east at south
Jul 31, 2025 · Apt 4
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4, 4th story, 2nd apartment from east at south
Jul 31, 2025 · Apt 4
Open — Notice of issuance sent to tenant - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling , 1st story
Jul 31, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Feb 11, 2025
Open — Not complied with - ANon-hazardous
Paint or post a sign indicating floors missing at public hall, 1st story
Feb 11, 2025
Open — Not complied with - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Feb 11, 2025
Open — Not complied with - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Feb 11, 2025
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Feb 11, 2025
Open — Not complied with - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Feb 11, 2025
Open — Not complied with - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Feb 11, 2025
Open — Not complied with - BHazardous
Repair the roof so that it will not leak above the ceiling at public hall, 5th story
Jun 5, 2024
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jun 5, 2024
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jun 5, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jun 5, 2024
Open — Not complied with - ANon-hazardous
Properly repair or replace the broken or defective upper and lower window sash counter balance at 1st window from west at north in the 1st room from north located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 1st room from north located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair or replace the broken or defective upper and lower window sash counter balance at 1st window from east at south in the 2nd room from north located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - ANon-hazardous
Properly secure the loose upper and lower window sash counter balance at 1st window from south at west in the kitchen located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective upper and lower window sash counter balance at the 1st window from south at west in the bathroom located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - ANon-hazardous
Replace with new the missing door lock at entrance door in the 5th room from north located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective upper and lower window sash spring balance at the 1st window from south at west in the 5th room from north located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective upper and lower window sash spring balance at the 1st window from east at south in the 6th room from north at west located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the south wall in the 6th room from north at west located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at the west wall in the 6th room from north at west located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 6th room from north at west located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 6th room from north at west located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective upper and lower window sash counter balance at 1st window from east at south in the 6th room from north at east located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of key operated lock installed at door to fire escape window in the 6th room from north at east located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 6th room from north at east located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 6th room from north at east located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 10, 5th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 10
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at the ceiling at public hall, 5th story
Jun 5, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and the ceiling at public hall, 5th story
Jun 5, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 5, 2024
Open — Not complied with
DOB building violations · 45
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active
Show 35 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Construction other optional
C-construction other optional
Jan 15, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - active
ECB violations · 5
- Class - 2
Work without a permit created an additional apt with 3pcs bathroom &kitchen with gas stove at west section of bsmt remedy obtain permit or restore to prior legal condition
Dec 24, 2009 · Penalty $4,000
Active - Class - 2
Residence altered for occupancy as a dwelling for more than the legally approved # of families. noted: 1) hpd - i cards records show one legal apt at basement. 2) an additional apt was created and presently
Dec 24, 2009 · Penalty $6,000
Active - Class - 2
Failure to maintain bldg in code compliant manner. defect noted: at 2nd story apt #3 east section of bldg evidence of water leaks from aboveapt at bthrm plaster is missing and mold and mildew is present on coil
Jul 31, 2009 · Penalty $2,500
Active - Hazardous
Failure to maintain haz. defects are: fire stopping missing in variousareas of ceiling of cellar. partically collapsed ceiling in same cellar directly under bathrm of apt 2. interior walls & ceiling removed.
Aug 21, 2006 · Penalty $2,500
Active - Non-hazardous
Work w/o a permit work noted:installed new sheetrock & wood framing thru out apt approx 5 new separate areas have been created bathroom fixtures have been removed exposing roughing new roughing being installed
Jul 25, 2006 · Penalty $2,500
Active
Complaints
- Heat/hot water
Entire building
Apr 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Aug 31, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Feb 8, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Feb 5, 2025 · Apt 2
Close - Door/window
Door
Jan 14, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Dec 3, 2024 · Apt 2
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Nov 4, 2024 · Apt 2
Close - Heat/hot water
Apartment only
Oct 19, 2024 · Apt 2
Close - Heat/hot water
Apartment only
Oct 19, 2024 · Apt 2
Close - Door/window
Window frame
Jun 3, 2024 · Apt 10
Close - Unsanitary condition
Pests
Jun 3, 2024 · Apt 10
Close - Flooring/stairs
Floor
Jun 3, 2024 · Apt 10
Close - Water leak
Slow leak
Jun 3, 2024 · Apt 10
Close - Heat/hot water
Apartment only
Feb 8, 2024 · Apt 2
Close - Heat/hot water
Entire building
Feb 5, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 14, 2024 · Apt 2
Close - General
Bell/buzzer/intercom
Jan 11, 2024 · Apt 2
Close - Heat/hot water
Apartment only
Jan 9, 2024 · Apt 2
Close - Heat/hot water
Apartment only
Jan 9, 2024 · Apt 2
Close - Electric
No lighting
Jan 9, 2024 · Apt 2
Close - Heat/hot water
Entire building
Oct 19, 2023 · Apt 2
Close - Door/window
Window frame
Aug 15, 2022 · Apt 10
Close - Flooring/stairs
Floor
Jun 28, 2022 · Apt 4
Close - Flooring/stairs
Floor
Jun 28, 2022 · Apt 4
Close - Door/window
Window frame
Jun 28, 2022 · Apt 4
Close - Heat/hot water
Entire building
Jan 21, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2022 · Apt BLDG
Close - Paint/plaster
Wall
Nov 19, 2019 · Apt 4
Close - Heat/hot water
Entire building
Mar 8, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 6, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 6, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 6, 2019 · Apt 1
Close - Heat/hot water
Entire building
Mar 1, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 28, 2019 · Apt 5
Close - Heat/hot water
Entire building
Feb 6, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2019 · Apt 2
Close - Safety
Smoke detector
Jan 11, 2018 · Apt 10
Close - Safety
Carbon monoxide detector
Jan 11, 2018 · Apt 10
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Feb 19, 2026 | $165,000 | Coops - walkup apartments | — |
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1912
- Floors
- 5
- Residential units
- 10
- Building area
- 15,970 ft²
- Lot area
- 3,632 ft²
- Zoning
- R8
- Community board
- 205
- Council district
- 15
- Block / lot
- 2804 / 11
- Assessed value
- $965,700
- Landmark / historic district
- No
HPD registration #201873, last renewed Sep 8, 2025.
Questions about 212 East Tremont Avenue
Who owns 212 East Tremont Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 210-12 East Tremont Ave H D F C.
Does 212 East Tremont Avenue have violations?
Yes. NYC HPD has recorded 207 housing violations at this property.
Is 212 East Tremont Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 212 East Tremont Avenue built?
City records list 1912 as the year it was built.
How many apartments are in 212 East Tremont Avenue?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.