675 Coster Street
Bronx, NY 10474BBL 2-02765-0266Map
Owner of record: 675 Coster Street H.d.f.c
675 Coster Street is a walk-up apartment building built in 1930 in Bronx, 10474. It has 33 residential units across 5 floors. The owner of record is 675 Coster Street H.d.f.c. HPD has recorded 61 housing violations here, most recently on July 3, 2026. 45 of the 50 most recent violations are still open.
- HPD violations
- 61
- DOB violations
- 18
- ECB violations
- 0
- HPD complaints
- 141
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 61
- BHazardous
Provide in the event of an emergency provide a heavy duty mechanical lock set at street to public hall door , 2nd story
Jul 3, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at 1st public hall bulkhead from north, 6th story
Jul 3, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of electromagnetic locking device installed at street to public hall door , 2nd story
Jul 3, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 2nd story
Jul 3, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at 1st public hall bulkhead from north, 6th story
Jul 3, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and north wall at 1st public hall bulkhead from north, 6th story
Jul 3, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 2nd story
Jul 3, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cracked bricks and mortar joints at parapet wall at north exterior wall
Jun 20, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3f, 4th story, 1st apartment from north at east
Jan 7, 2026 · Apt 3F
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 7, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2025
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2024
Closed — Violation dismissed - ANon-hazardous
Provide a peep hole in entrance door of the dwelling unit so located so as to permit a person inside the dwelling to view any person outside entrance door ... in the entrance located at apt 4a, 5th story, 2nd apartment from north at east
Sep 20, 2024 · Apt 4A
Open — Nov sent out - BHazardous
Refit closet doors in the private hallway located at apt 4a, 5th story, 2nd apartment from north at east
Sep 20, 2024 · Apt 4A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wood door in the 4th room from north located at apt 4a, 5th story, 2nd apartment from north at east
Sep 20, 2024 · Apt 4A
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 2nd story
Sep 20, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 2nd story
Sep 20, 2024
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of electrico magnetic lock device at building entrance door at public hall, 2nd story
Sep 20, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4a, 5th story, 2nd apartment from north at east
Sep 20, 2024 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective heavy duty key operated lock and latch set at font entrance door to building at public hall, 2nd story
Sep 20, 2024
Open — Nov sent out - CImmediately hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet at toilet in the bathroom located at apt 4a, 5th story, 2nd apartment from north at east
Sep 20, 2024 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at the building entrance door at public hall, 2nd story
Sep 11, 2024
Open — Nov sent out - BHazardous
Provide security in the event of power outage by means of an acceptable mechanical heavy duty lock and latch set at the building entrance door (from street to vestibule) at public hall, 2nd story
Sep 11, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 16, 2023
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 17, 2022
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 17, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective all walls at 1st public hall bulkhead from north
Jan 28, 2022
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of wood panels, ladder , sink at 1st public hall bulkhead from north
Jan 28, 2022
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 4th story
Jan 28, 2022
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at south yard
Dec 3, 2021
Open — First no access to re- inspect violation - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south court
Oct 6, 2021
Open — First no access to re- inspect violation - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective leaky shut off valve in the 2nd room from north located at bsmt-apt b, 1st bsmt-apt from east at south
Feb 7, 2020 · Apt B
Open — Nov sent out - BHazardous
Replace with new the missing sewage pipe caps at east section at basement
Sep 25, 2019
Open — First no access to re- inspect violation - BHazardous
M/d law abate the nuisance consisting of leaky pipe at sewage line at north wall at east section at basement
Sep 25, 2019
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair the broken or defective paving at west at fire passage way
Sep 25, 2019
Open — First no access to re- inspect violation - CImmediately hazardous
Remove the illegal fastening lockable slide bolt on door in the entrance located at apt b, 1st story, 1st apartment from east at south
Sep 6, 2019 · Apt B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt b, 1st story, 1st apartment from east at south
May 21, 2019 · Apt B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt b, 1st story, 1st apartment from east at south
May 21, 2019 · Apt B
Open — Notice of issuance sent to tenant - BHazardous
Arrange and make self-closing the doors ... in the entrance located at apt b, 1st story, 1st apartment from east at south
May 21, 2019 · Apt B
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective located at apt b, 1st story, 1st apartment from east at south
May 21, 2019 · Apt B
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt b, 1st story, 1st apartment from east at south
May 21, 2019 · Apt B
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 9, 2017
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt b, 1st story, 1st apartment from north at east
Jun 17, 2017 · Apt B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt b, 1st story, 1st apartment from north at east
Jun 17, 2017 · Apt B
Open — Nov sent out
DOB building violations · 18
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - active
Show 8 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Appliance
Electric/gas range
Sep 23, 2026 · Apt 3B
Open - General
Cooking gas
Aug 18, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 17, 2026 · Apt B
Close - Flooring/stairs
Floor
Aug 17, 2026 · Apt B
Close - Door/window
Window frame
Aug 17, 2026 · Apt B
Close - Paint/plaster
Wall
Aug 17, 2026 · Apt B
Close - General
Cooking gas
Aug 17, 2026 · Apt B
Close - Appliance
Electric/gas range
Aug 17, 2026 · Apt B
Close - Unsanitary condition
Pests
Aug 17, 2026 · Apt B
Close - Door/window
Door
Aug 17, 2026 · Apt B
Close
Show 40 more ↓
- Plumbing
Water supply
Jul 2, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jul 2, 2026 · Apt 4A
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Plumbing
Bathtub/shower
Jan 21, 2026 · Apt 4A
Close - Door/window
Door
Jan 21, 2026 · Apt 4A
Close - Heat/hot water
Entire building
Jan 5, 2026 · Apt 4A
Close - Heat/hot water
Entire building
Jan 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 31, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Dec 15, 2025 · Apt 2F
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - General
Cabinet
Nov 21, 2025 · Apt 5D
Close - Paint/plaster
Wall
Nov 21, 2025 · Apt 5D
Close - Unsanitary condition
Mold
Nov 21, 2025 · Apt 5D
Close - Water leak
Heavy flow
Nov 21, 2025 · Apt 5D
Close - Paint/plaster
Wall
Nov 21, 2025 · Apt 5D
Close - Plumbing
Basin/sink
Mar 18, 2025 · Apt B
Close - Unsanitary condition
Pests
Mar 18, 2025 · Apt B
Close - Door/window
Window frame
Mar 18, 2025 · Apt B
Close - Plumbing
Basin/sink
Mar 18, 2025 · Apt B
Close - Door/window
Door
Jan 21, 2025 · Apt 4A
Close - Heat/hot water
Apartment only
Dec 23, 2024 · Apt 3F
Close - Door/window
Door
Oct 1, 2024 · Apt 4A
Close - Unsanitary condition
Pests
Oct 1, 2024 · Apt 4A
Close - Unsanitary condition
Mold
Oct 1, 2024 · Apt 4A
Close - Door/window
Door
Sep 15, 2024 · Apt 4A
Close - Door/window
Door
Sep 15, 2024 · Apt 4A
Close - Plumbing
Toilet
Sep 12, 2024 · Apt 4A
Close - Door/window
Door
Sep 12, 2024 · Apt 4A
Close - Water leak
Heavy flow
Aug 18, 2024 · Apt B
Close - Plumbing
Basin/sink
Aug 18, 2024 · Apt B
Close - Flooring/stairs
Floor
Aug 18, 2024 · Apt B
Close - Door/window
Window frame
Aug 18, 2024 · Apt B
Close - Paint/plaster
Ceiling
Aug 18, 2024 · Apt B
Close - Heat/hot water
Entire building
Jan 17, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 24, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2022 · Apt BLDG
Close - Unsanitary condition
Mold
Dec 4, 2021 · Apt 5D
Close - Unsanitary condition
Pests
Dec 4, 2021 · Apt 5D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1930
- Floors
- 5
- Residential units
- 33
- Building area
- 27,105 ft²
- Lot area
- 5,000 ft²
- Zoning
- R6
- Community board
- 202
- Council district
- 17
- Block / lot
- 2765 / 266
- Assessed value
- $445,950
- Landmark / historic district
- No
HPD registration #206160, last renewed Dec 16, 2024.
Questions about 675 Coster Street
Who owns 675 Coster Street?
The owner of record in NYC Department of City Planning PLUTO data is 675 Coster Street H.d.f.c.
Does 675 Coster Street have violations?
Yes. NYC HPD has recorded 61 housing violations at this property.
Is 675 Coster Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 675 Coster Street built?
City records list 1930 as the year it was built.
How many apartments are in 675 Coster Street?
It has 33 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.