1156 East 165 Strreet
Bronx, NY 10459BBL 2-02756-0090Map
Owner of record: Hp Whitlock II Housing Development Fund Company,
1156 East 165 Strreet is an elevator apartment building built in 2025 in Bronx, 10459. It has 251 residential units across 14 floors. The owner of record is Hp Whitlock II Housing Development Fund Company,. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 4
- ECB violations
- 29
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 4
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 7, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 17, 2021
Dob violation - dismissed - Immediate emergency anythingoptional
Install approximately 170 linear feet of sidewalk shed along exposure# 2 and wrap around approximately 50 linear feet into exposure#1
Nov 25, 2020
Dob violation - dismissed - Immediate emergency anythingoptional
Install approx. 140ft of sidewalk shed along exp#1. front of the building
Feb 8, 2019
Dob violation - dismissed
ECB violations · 29
- Class - 2
Atoi of a proposed 14-story nb, the job site was non-active with no personnel present. the site exceeded 22,000 sq ft.required a designated watch person. i observed that no watch person was provided maintained
Aug 27, 2026 · Penalty $2,500
Resolve - Class - 2
At the time of my inspection of a 14 story nb approximately 22712 square feet, i observed closed site with no construction activity. upon shouting at perimeter and banging on fence and door to alert watchperson
Aug 8, 2026 · Penalty $2,530
Resolve - Class - 2
Obs. active constr. ops. for hvac work at mult. flrs. contr. to stipulations of ahv permit no. x00992202-i1-gc. workers performed hvac installation while permit auth. only housekeeping, framing, sheetrock & fin
Aug 1, 2026 · Penalty $1,280
Resolve - Class - 2
At time of inspection, observed proposed 14-story building where material storage was located at exposure 4 without required solid 4-foot barriers separating the storage area from the public walkway. condition
Jul 6, 2026 · Penalty $2,500
Resolve - Class - 2
At time of inspection, during high wind conditions, observed proposed 14-story building with horizontal safety netting at approximately the 11th floor not properly secured. loose netting may become dislodged an
Jul 6, 2026 · Penalty $2,500
Resolve - Class - 2
At time of inspection, 14-story building observed with missing debris netting between the perimeter fence and sidewalk shed at exposures 3 and 4 adjacent to neighboring property at 1142 e. 165 street, apt 1c. c
Jul 6, 2026 · Penalty $2,500
Resolve - Class - 2
At the time of inspection of a proposed 13-story new building, i observed no watch person on site or in the area of the premises. the job site exceeded a 22712 sq. ft. footprint and required a designated watch
Jun 11, 2026 · Penalty $2,500
Resolve - Class - 2
Observed 14 nb on super structure phase @ 7th fl working deck. adjacent property @ expo 3 with inadequate adjacent property protection as per code and approved ssp plan review on site. no roof protection instal
Apr 22, 2026 · Penalty $5,000
Resolve - Class - 2
At the time of inspection of a proposed 14-story new building, i observed no watch person on site or in the area of the premises. the job site exceeded a 22,000 sq. ft. footprint and required a designated watch
Feb 22, 2026 · Penalty $2,500
Resolve - Class - 1
Observed active jobsite in soe/foundation operations. guardrail system installed around perimeter of soe @ exposure 1 & 4are inadequate. the guardrail system is missing toe boards and the the system is not conn
Jan 30, 2026 · Penalty $5,000
Resolve
Show 19 more ↓
- Class - 2
Observed construction fence installed around perimeter of jobsite at exposure 1 &4. the construction fence does not have viewing panels installed every 25 ft as per code requires.provide/viewing panels every 25
Jan 30, 2026 · Penalty $1,000
Resolve - Class - 1
A proposed 14 story nb active site at soe / foundation phase. upon review of cs logs. cs not present. no cs logs was presented, jeffrey pizarro reg#29769 as the designated construction superintendent. however,
Dec 11, 2025 · Penalty $10,030
Resolve - Class - 2
14 story nb site currently in the soe/foundation phase,observed to be proceeding contrary to the approved support of excavation (soe) plans.exp#1,missing and/or inadequate whalers, rakers,and heel blocks, resul
Dec 10, 2025
Resolve - Class - 2
Proposed 14-story nb active site. observed a yellow metal fdny flammable liquid storage box containing diesel fuel left unlocked/accessible. upon requesting the nyc fdny permit for fuel use/storage, none were v
Dec 10, 2025 · Penalty $1,280
Resolve - Class - 1
At a proposed 14-story nb site in the soe/foundation phase, work was observed proceeding at the adjacent property. at excavation area #2, the adjacent wall was not weatherproof, exposing the structure to potent
Dec 10, 2025 · Penalty $5,030
Resolve - Class - 1
At time of inspection of a 14-story new building, active site at excavation phase upon reviewing the approve ssp plan i noticed jobsite ramp and roadway barriers not as per plan roadway has concrete and timber
Oct 20, 2025 · Penalty $2,500
Resolve - Class - 2
At time of inspection of 14-story new building,active site at excavation i observed drilling operation inside to site and dewatering into sewer line not as per code 3303.5.3 clogging. i observed workers on road
Oct 20, 2025 · Penalty $2,500
Resolve - Class - 2
At time of inspection of a 14-story new building, active site excavation phase with drilling operation and air pollution not as per code 3303.5.4 i observed dust and airborne particles from construction during
Oct 20, 2025 · Penalty $2,500
Resolve - Class - 1
At time of inspection of a 14-story new building, active site at excavation upon requesting site safety manger onsite for pre shift meeting,optical monitoring,vibration monitoring and pre construction survey no
Oct 20, 2025 · Penalty $2,500
Resolve - Class - 1
At time of inspection of inspection of a 14-story new building, active site i observed concrete wall with con edison electrical power wire inside jobsite. upon review the approve soe and ssp plan condition not
Oct 20, 2025 · Penalty $2,500
Resolve - Class - 2
Observed at exp4 swing fence entering into public sidewalk hazard to pedestrians created strike by construction equipment leads to injuries or fatal.bc3307.7.2 stipulates construction fence shall swing into ar
May 16, 2025
Resolve - Class - 2
At the time of inspection demolition job site i observed construction fence has permit expired on : 08/20/2022 under job# x00580055-i1-fn.
Mar 6, 2023
Resolve - Class - 2
Failure to maintain construction fence.at time of my inspection on a demolition sign-off site.observed that the construction fence had been poorly maintained.for instance,there is unlawful vancalized markings a
May 5, 2022
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. note at time of inspection at exp#1&2 multiple cracks & missing mortar observed sidewalk shed installed permit#x00131146 exp 3/11/2020 permit to demo not issue
May 21, 2021 · Penalty $500
Resolve - Class - 1
Faailure to maintain bldg in code compliant manner. noted: at time of my inspection i observed at exp#1&2 multiple cracks & missing mortar from bricks also coping stone at roof level has areas where it is missi
Apr 6, 2021 · Penalty $500
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner.note: at exp.#1 & 2 observed multiple cracks & missing mortar from bricks also coping stone at roof level has areas where it is missing & some look lease.at exp
Feb 8, 2021 · Penalty $1,563
Resolve - Class - 1
Failure to maintain. at time of inspection at exposure #1 observed step cracks, missing mortar joints and loose stucco. at exposure # 2 observed many missing and loose coping stones along with missing, loose an
Nov 25, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35305023h issued on 01-31-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01(d)(2). an acceptable certificate has not been filed despite the
Nov 13, 2019
Resolve - Class - 2
Failure to maintain building in code complaint manner.at time of inspection the violating conditions are as follows 1)loose missing mortoar joints on the facade of exposure #1 2)cracks on the facade where 2)cra
Jan 31, 2019
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2025
- Floors
- 14
- Residential units
- 251
- Building area
- 233,220 ft²
- Lot area
- 27,251 ft²
- Zoning
- R8A
- Community board
- 202
- Council district
- 17
- Block / lot
- 2756 / 90
- Assessed value
- $868,950
- Landmark / historic district
- No
Questions about 1156 East 165 Strreet
Who owns 1156 East 165 Strreet?
The owner of record in NYC Department of City Planning PLUTO data is Hp Whitlock II Housing Development Fund Company,.
Does 1156 East 165 Strreet have violations?
NYC HPD has no housing violations on record for this property.
Is 1156 East 165 Strreet rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1156 East 165 Strreet built?
City records list 2025 as the year it was built.
How many apartments are in 1156 East 165 Strreet?
It has 251 residential units and 252 units in total.