1032 Aldus Street
Bronx, NY 10459BBL 2-02755-0029Map
Owner of record: Aldus Green Corp
1032 Aldus Street is an elevator apartment building built in 1927 in Bronx, 10459. It has 49 residential units across 6 floors. The owner of record is Aldus Green Corp. HPD has recorded 391 housing violations here, most recently on October 14, 2026. 50 of the 50 most recent violations are still open.
- HPD violations
- 391
- DOB violations
- 37
- ECB violations
- 19
- HPD complaints
- 1,309
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 391
- CImmediately hazardous
Repair the broken or defective connection at water closet in the bathroom located at apt 6g, 6th story, 1st apartment from west at north
Oct 14, 2026 · Apt 6G
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6g, 6th story, 1st apartment from west at north
Oct 14, 2026 · Apt 6G
Open — Violation will be reinspected - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6g, 6th story, 1st apartment from west at north
Oct 14, 2026 · Apt 6G
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6g, 6th story, 1st apartment from west at north
Oct 14, 2026 · Apt 6G
Open — Civ14 mailed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6b, 6th story, 2nd apartment from north at east
Oct 14, 2026 · Apt 6B
Open — Civ14 mailed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Oct 14, 2026 · Apt 2C
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6g, 6th story, 1st apartment from south at west
Oct 14, 2026 · Apt 6G
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6g, 6th story, 1st apartment from south at west
Oct 14, 2026 · Apt 6G
Open — Civ14 mailed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6g, 6th story, 1st apartment from west at north
Oct 13, 2026 · Apt 6G
Open — Civ14 mailed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 2nd apartment from north at east
Oct 13, 2026 · Apt 1B
Open — Civ14 mailed
Show 40 more ↓
- CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 13, 2026
Open — Nov certified on time - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Oct 12, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6g, 6th story, 1st apartment from west at north
Oct 12, 2026 · Apt 6G
Open — Civ14 mailed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Oct 12, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5e, 5th story, 1st apartment from east at south
Oct 12, 2026 · Apt 5E
Open — Civ14 mailed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5e, 5th story, 1st apartment from east at south
Oct 12, 2026 · Apt 5E
Open — Civ14 mailed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 5e, 5th story, 1st apartment from east at south
Oct 12, 2026 · Apt 5E
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4e, 4th story, 2nd apartment from east at south
Oct 10, 2026 · Apt 4E
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective latch set and assemblies at door in the entrance located at apt 1f, 1st story, 2nd apartment from south at west
Oct 10, 2026 · Apt 1F
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 1f, 1st story, 2nd apartment from south at west
Oct 10, 2026 · Apt 1F
Open — Violation will be reinspected - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the bathroom located at apt 1f, 1st story, 2nd apartment from south at west
Oct 10, 2026 · Apt 1F
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules , missing in the entire apartment located at apt 1f, 1st story, 2nd apartment from south at west
Oct 10, 2026 · Apt 1F
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations , missing in the entire apartment located at apt 1f, 1st story, 2nd apartment from south at west
Oct 10, 2026 · Apt 1F
Open — Civ14 mailed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1f, 1st story, 2nd apartment from south at west
Oct 10, 2026 · Apt 1F
Open — Civ14 mailed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 10, 2026
Open — Nov certified on time - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1f, 1st story, 2nd apartment from south at west
Oct 10, 2026 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5e, 5th story, 2nd apartment from east at south
Oct 9, 2026 · Apt 5E
Open — Civ14 mailed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 9, 2026
Open — Nov certified on time - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 5e, 5th story, 1st apartment from east at south
Oct 7, 2026 · Apt 5E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5e, 5th story, 1st apartment from east at south
Oct 7, 2026 · Apt 5E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective sink base cabinet in the kitchen located at apt 5e, 5th story, 1st apartment from east at south
Oct 7, 2026 · Apt 5E
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Oct 7, 2026
Open — Nov certified on time - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Oct 7, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt apt5e, 5th story, 1st apartment from east at south
Oct 7, 2026 · Apt APT5E
Open — Civ14 mailed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 7, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6a, 6th story, 2nd apartment from west at north
Oct 7, 2026 · Apt 6A
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5e, 5th story, 1st apartment from east at south
Oct 7, 2026 · Apt 5E
Open — Nov certified on time - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Oct 5, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5e, 5th story, 1st apartment from east at south
Oct 5, 2026 · Apt 5E
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5e, 5th story, 1st apartment from east at south
Oct 5, 2026 · Apt 5E
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5e, 5th story, 1st apartment from east at south
Oct 5, 2026 · Apt 5E
Open — Civ14 mailed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4e , 4th story, 2nd apartment from east at south
Oct 4, 2026 · Apt 4E
Open — Civ14 mailed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 4, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4f, 4th story, 1st apartment from east at south
Oct 3, 2026 · Apt 4F
Open — Civ14 mailed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4e, 4th story, 2nd apartment from east at south
Oct 3, 2026 · Apt 4E
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5e, 5th story, 1st apartment from south at west
Oct 3, 2026 · Apt 5E
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5e, 5th story, 1st apartment from south at west
Oct 3, 2026 · Apt 5E
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 3, 2026
Open — Nov certified on time - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 3, 2026
Open — Nov certified on time - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5e, 5th story, 1st apartment from south at west
Oct 3, 2026 · Apt 5E
Open — Civ14 mailed
DOB building violations · 37
- Construction other optional
Failure to maintain building in a code compliant manner. observed damaged/missing mortar joints, step cracks, and spalled brick work in multiple locations on exposure 1,2, and 4. remedy: repair and/or replace
Jun 10, 2026
Dob violation - active - Construction other optional
Emergency work order due to observed bulging lintel bricks,heavy corro ded window lintel,open mortar joints,step cracking,defected/dislodged mortar joints at multiple locations at exp1,2,north and east elevation s.remedy:owner to immediately provide adequate safety measures of all four elevations to secure and protect the public and properties
Jun 10, 2026
Dob violation - active - Construction other optional
Failure to maintain building in a code compliant manner under the nyc admin code.as noted during time of inspection,observed at exp1 and 2,s palling brick,step cracks and missing or loose mortar joints.remedy:re pair and/or replace
Oct 3, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 2, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 13, 2020
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 9, 2019
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 2017
Dob violation - resolved
Show 27 more ↓
- Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 19, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 16, 2015
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 9, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 12, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 15, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 18, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 11, 2008
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 7, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 21, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 22, 2004
Dob violation - resolved - Elevator elevatorrequired
2p4897
Dec 17, 2002
Dob violation - resolved - Elevator elevatorrequired
2p4897
Jul 2, 2001
Dob violation - resolved - Elevator elevatorrequired
2p4897
Aug 12, 1999
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Elevator elevatorrequired
(74)remove illegal locks off of basement hoistway door
Mar 14, 1990
Dob violation - resolved
ECB violations · 19
- Class - 2
B-254 ftm boiler found a slat/fin model #ldwo oil fire consisting of seven modules to be inoperable. correct all violating conditions and submit cert.of correction
Sep 9, 2026 · Penalty $1,250
Active - Class - 1
Failure to provide unobstructed exit passageway on fire escapes. as noted at time of inspection observed flower pots and other house hold objects on fire escapes at exposures 1 and 4. remedy: remove objects in
Oct 3, 2025 · Penalty $1,250
Active - Class - 2
Emergency phone not working, repair; provide evacuation signage in the lobby
Jun 10, 2024 · Penalty $625
Active - Class - 2
At a occupied 6 story building with sidewalk shed . i noticed that on corner of exposure#3 a missing parapet panel and pieces of 2x4 are hanging appoint of dislodgment. as per section 3307.6.5 -3307.6.5.3 sidew
May 9, 2024 · Penalty $2,400
Active - Class - 2
At time of my inspection of a sidewalk shed at a 6 story building. i noticed that sidewalk shed has no information penal creating a situation for first responders locating building address and owner incase of a
Sep 21, 2023 · Penalty $1,250
Resolve - Class - 2
At time of my inspection i observed a unsafe sidewalk shed at a occupied building.failure to maintain in a safe manner junior beams are at point of falling, bent cross brace and supported post is not plum and r
Sep 21, 2023 · Penalty $2,400
Active - Class - 2
At time of my inspection of a occupied 6 story building with a sidewalk shed. i noticed that at emergency fire escape ladders at various location obstruction of plywood and planks are placed blocking fire escap
Sep 21, 2023 · Penalty $1,250
Active - Class - 2
At time of my inspection of a sidewalk shed at a 6 story occupied building. upon reviewing department of building records i noticed sidewalk shed permit#x00505705 expired 04-26-2023 and no other renewed permit
Sep 21, 2023
Resolve - Class - 3
Failure to provide access to boiler room as per hms code 27-2033 to perform boiler inspection, spoke super who called property manager and was denied access
Sep 19, 2023 · Penalty $500
Active - Class - 1
Class 1: fire service missing. install as mandated by code a-17.1 section 3.10.12 of the 2014 nycbc k3. class 2: car door misaligned. adjust door to correct clearances & remove rubbing in hoistway. phone inoper
Feb 8, 2023 · Penalty $1,250
Active
Show 9 more ↓
- Class - 1
Class 1 violation issued , dlm improperly installed on this device. no fireman service present in controller. install fireman service so dlm is in compliance with section 3. 10.12 of appendix. class 2 violation
Apr 9, 2022 · Penalty $1,250
Active - Class - 2
35-m-07, 16-m-07, 71-x-10, 59-bb-07, 64-m-07, 02-x-10, 16-j-10. 35-m#provide electrical box cover on top of car 16-m #provide hole on 6th floor hoistway door to access hoistway 71-x #repair put light.
Aug 6, 2019 · Penalty $625
Active - Class - 2
67l10,59m7,10h11,17h11,56y2,56y13,68m7. communication defective repair. machine brake maintenance tag missing provide, car door gibs worn replace, hoistway door gibs worn replace,hoist machine oil leak clean.h
Aug 31, 2016 · Penalty $500
Resolve - Class - 2
11x10,67x10,39o02,40m07,16d06,17h11,16m07,03d06,35q03,71q03. 11 restore 6th floor to service; 67 phone not working;40 unable to access motor room/provide keys for full inspection;16d secure 5th floor spring clo
May 10, 2016 · Penalty $500
Active - Class - 2
08v10,03m07,52k10: 03 reinstall missing hand rail. 52 rusted with rogue.
Dec 5, 2011 · Penalty $250
Resolve - Class - 2
59h11.73d6.77q3.100d6.59h11 brakes pads 73d6 top section of car rails 100d6 toe guard
Oct 16, 2009 · Penalty $2,500
Resolve - Non-hazardous
38q03,59q03,64q03,71m11,71q03,86bb05. 38-q-03 install guard for light on top of car 71-m-11 replace toe guard underside of platform 71-q-03 install guard for light under car.
Oct 3, 2007
Resolve - Non-hazardous
25d06 38o02 66o02 34q03 #34 eletric wiring on top of car exposed.
Jun 24, 2003 · Penalty $180
Resolve - Non-hazardous
22d06-08v01-40u16 40=top of car
Nov 5, 2001 · Penalty $2,500
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 17, 2026 · Apt 5E
Close - Plumbing
Water supply
Oct 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 14, 2026 · Apt 5G
Close - Heat/hot water
Entire building
Oct 14, 2026 · Apt 5E
Close - Heat/hot water
Apartment only
Oct 14, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Oct 13, 2026 · Apt 6G
Close - Heat/hot water
Apartment only
Oct 13, 2026 · Apt 6F
Close - Heat/hot water
Entire building
Oct 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 13, 2026 · Apt 4E
Close - Heat/hot water
Entire building
Oct 13, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Oct 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 11, 2026 · Apt 5E
Close - Plumbing
Water supply
Oct 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 10, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 10, 2026 · Apt 5E
Close - Plumbing
Water supply
Oct 9, 2026 · Apt BLDG
Close - Plumbing
Water supply
Oct 9, 2026 · Apt 1FBUIL
Close - Heat/hot water
Entire building
Oct 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 8, 2026 · Apt 4E
Close - Heat/hot water
Entire building
Oct 8, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 8, 2026 · Apt 5E
Close - Heat/hot water
Apartment only
Oct 8, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Oct 7, 2026 · Apt 1F
Close - Heat/hot water
Apartment only
Oct 7, 2026 · Apt APT5E
Close - Plumbing
Water supply
Oct 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 5, 2026 · Apt 5G
Close - Plumbing
Water supply
Oct 5, 2026 · Apt BLDG
Close - Paint/plaster
Ceiling
Oct 5, 2026 · Apt 5E
Close - General
Cabinet
Oct 5, 2026 · Apt 5E
Close - Heat/hot water
Apartment only
Oct 5, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Oct 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2026 · Apt 4C
Close - Plumbing
Water supply
Oct 3, 2026 · Apt 1F
Close - Heat/hot water
Entire building
Oct 3, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 3, 2026 · Apt 4F
Close - Plumbing
Water supply
Oct 2, 2026 · Apt 1F
Close - Heat/hot water
Entire building
Oct 2, 2026 · Apt BLDG
Close - Safety
Smoke detector
Oct 2, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Oct 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 2, 2026 · Apt 4E
Close - General
Cabinet
Oct 1, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Oct 1, 2026 · Apt 5E
Close - Plumbing
Bathtub/shower
Oct 1, 2026 · Apt 5E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1927
- Floors
- 6
- Residential units
- 49
- Building area
- 34,380 ft²
- Lot area
- 5,955 ft²
- Zoning
- R7-1
- Community board
- 202
- Council district
- 17
- Block / lot
- 2755 / 29
- Assessed value
- $1,821,150
- Landmark / historic district
- No
HPD registration #213746, last renewed Aug 19, 2025.
Questions about 1032 Aldus Street
Who owns 1032 Aldus Street?
The owner of record in NYC Department of City Planning PLUTO data is Aldus Green Corp.
Does 1032 Aldus Street have violations?
Yes. NYC HPD has recorded 391 housing violations at this property.
Is 1032 Aldus Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1032 Aldus Street built?
City records list 1927 as the year it was built.
How many apartments are in 1032 Aldus Street?
It has 49 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.