roofy

750 Kelly Street

Bronx, NY 10455BBL 2-02708-0036Map

Owner of record: 750 Kelly Holdings LLC

750 Kelly Street is a walk-up apartment building built in 1899 in Bronx, 10455. It has 9 residential units across 2 floors. The owner of record is 750 Kelly Holdings LLC. HPD has recorded 77 housing violations here, most recently on August 10, 2026. 32 of the 50 most recent violations are still open.

HPD violations
77
DOB violations
2
ECB violations
2
HPD complaints
83

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 10, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 77

  • B

    Properly repair or replace the broken or defective electrial outlet west walls in the kitchenette located at apt 1c, 1st story, 1st apartment from south at west

    Aug 10, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective outlet at north wall (no power) in the bathroom located at apt 1c, 1st story, 1st apartment from south at west

    Aug 10, 2026 · Apt 1C

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective entrance door in the bathroom located at apt 1c, 1st story, 1st apartment from south at west

    Aug 10, 2026 · Apt 1C

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Aug 10, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1c, 1st story, 1st apartment from south at west

    Aug 10, 2026 · Apt 1C

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at frame missing at public hall

    Aug 10, 2026

    Open — Nov certified on time
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east

    Jul 5, 2026 · Apt 1B

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at north wall at public hall

    Jul 5, 2026

    Open — Nov certified on time
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 30, 2026

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at bsmt-apt bb, 1st bsmt-apt from north at east

    Sep 29, 2025 · Apt BB

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at bsmt-apt bb, 1st bsmt-apt from north at east

    Sep 29, 2025 · Apt BB

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of electric wiring at ceiling in the foyer located at bsmt-apt bb, 1st bsmt-apt from north at east

    Sep 29, 2025 · Apt BB

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective light fixture at ceiling in the foyer located at bsmt-apt bb, 1st bsmt-apt from north at east

    Sep 29, 2025 · Apt BB

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective glass pane at upper sash at 2nnd window frame from east at south in the 3rd room from north located at bsmt-apt bb, 1st bsmt-apt from north at east

    Sep 29, 2025 · Apt BB

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective light fixture at ceiling in the 3rd room from north located at bsmt-apt bb, 1st bsmt-apt from north at east

    Sep 29, 2025 · Apt BB

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective light fixture at ceiling in the 2nd room from north at west located at bsmt-apt bb, 1st bsmt-apt from north at east

    Sep 29, 2025 · Apt BB

    Open — Nov sent out
  • A

    Refit shower door at north in the bathroom located at bsmt-apt bb, 1st bsmt-apt from north at east

    Sep 29, 2025 · Apt BB

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the 3rd room from east located at apt 2b, 2nd story, 1st apartment from south at west original violation 18113226 issued 25-jul-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Jul 25, 2025 · Apt 2B

    Open — First no access to re- inspect violation
  • A

    Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the 3rd room from east located at apt 2b, 2nd story, 1st apartment from south at west

    Jul 25, 2025 · Apt 2B

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing

    Jul 25, 2025

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 5, 2025

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective window lower sash spring balance at east wall in the 1st room from north located at bsmt-apt bc, 1st bsmt-apt from east at south

    May 9, 2025 · Apt BC

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color peeling/ splitting at ceiling in the 1st room from east located at apt 2c, 2nd story, 1st apartment from east at south

    Jan 29, 2025 · Apt 2C

    Open — First no access to re- inspect violation
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing

    Jan 29, 2025

    Open — Not complied with
  • B

    Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing

    Jan 29, 2025

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Jan 29, 2025

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Jan 29, 2025

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.

    Jan 29, 2025

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing

    Jan 29, 2025

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Jan 29, 2025

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective (intercom) not communicating properly with intercom at building front (s) at south wall in the foyer located at apt 2b, 2nd story, 1st apartment from north at east

    Jan 29, 2025 · Apt 2B

    Open — Not complied with
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color water stains at ceiling in the 1st room from east located at apt 2b, 2nd story, 1st apartment from north at east

    Jan 29, 2025 · Apt 2B

    Open — Not complied with
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    Jan 29, 2025

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Dec 30, 2024

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing

    Dec 30, 2024

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing

    Dec 30, 2024

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at frame missing

    Dec 30, 2024

    Open — Not complied with
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Dec 30, 2024

    Closed — Violation closed
  • A

    Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided.

    Dec 30, 2024

    Open — Not complied with
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Dec 30, 2024

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over ceiling in the 2nd room from north located at apt 2c, 2nd story, 1st apartment from south at west

    Dec 30, 2024 · Apt 2C

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 2c, 2nd story, 1st apartment from south at west

    Dec 30, 2024 · Apt 2C

    Open — First no access to re- inspect violation
  • A

    Post, in the form approved by the commissioner, and maintain the notice about prevention, detection and removal of bedbug infestation required by §27-2018.1 in common area of the building or provide to each tenant, according to the certification made on such annual bedbug report.

    Dec 30, 2024

    Open — Not complied with
  • C

    Properly repair or replace the broken or defective mortise lock at entrance in the entrance located at apt bc, 1st apartment from east at south

    Nov 24, 2024 · Apt BC

    Open — Not complied with
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at 1st story at public hall

    Nov 24, 2024

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall

    Nov 24, 2024

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall

    Nov 24, 2024

    Open — Not complied with
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Nov 24, 2024

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Nov 24, 2024

    Open — Not complied with
  • B

    Properly repair or replace the broken or defective return buzzer intercom from the building entrance door to the apartment wall panel at west wall in the foyer located at apt bc, 1st apartment from east at south

    Nov 24, 2024 · Apt BC

    Open — Not complied with

DOB building violations · 2

  • Landmark none

    Landmk-landmark none

    Mar 11, 2024

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 29, 2016

    Dob violation - resolved

ECB violations · 2

  • Class - 2

    Observed construction debis, garbage, dirt and rocks thoughtout the building. power tool cords not secured properly. all of these hazards cause tripping conditions for workers and others entering construction s

    Jan 17, 2024

    Resolve
  • Class - 2

    Observed temp wiring installed with no permit on file for scope of work, obtain all permits

    Jan 17, 2024 · Penalty $3,125

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Sep 24, 2026 · Apt 1B

    Open
  • Unsanitary condition

    Pests

    Sep 24, 2026 · Apt 1B

    Open
  • Appliance

    Electric/gas range

    Aug 6, 2026 · Apt 1C

    Open
  • Heat/hot water

    Apartment only

    Aug 6, 2026 · Apt 1C

    Open
  • Appliance

    Electric/gas range

    Aug 6, 2026 · Apt 1C

    Open
  • Plumbing

    Bathtub/shower

    Aug 6, 2026 · Apt 1C

    Open
  • Unsanitary condition

    Pests

    Aug 3, 2026 · Apt 1C

    Close
  • Unsanitary condition

    Pests

    Aug 3, 2026 · Apt 1C

    Close
  • Electric

    Power outage

    Aug 3, 2026 · Apt 1C

    Close
  • Unsanitary condition

    Pests

    Jul 13, 2026 · Apt FRONTE

    Close
Show 40 more ↓
  • Door/window

    Window pane

    Jul 13, 2026 · Apt BB

    Close
  • Heat/hot water

    Apartment only

    Jul 2, 2026 · Apt 1B

    Close
  • Unsanitary condition

    Sewage

    Jun 22, 2026 · Apt BB

    Open
  • Unsanitary condition

    Pests

    Jun 22, 2026 · Apt BB

    Open
  • Plumbing

    Basin/sink

    Mar 19, 2026 · Apt 2A

    Close
  • Plumbing

    Basin/sink

    Mar 19, 2026 · Apt 2A

    Close
  • Water leak

    Slow leak

    Mar 19, 2026 · Apt 2A

    Close
  • Unsanitary condition

    Mold

    Mar 16, 2026 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Mar 10, 2026 · Apt 2A

    Close
  • Plumbing

    Basin/sink

    Mar 10, 2026 · Apt 2A

    Close
  • Water leak

    Heavy flow

    Mar 10, 2026 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2026 · Apt ALL

    Close
  • Unsanitary condition

    Mold

    Jan 12, 2026 · Apt 2B

    Close
  • Paint/plaster

    Wall

    Jan 12, 2026 · Apt 2B

    Close
  • Water leak

    Damp spot

    Dec 26, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Mold

    Dec 26, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Mold

    Nov 7, 2025 · Apt 2B

    Close
  • Water leak

    Damp spot

    Nov 7, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Nov 5, 2025 · Apt BB

    Close
  • Unsanitary condition

    Sewage

    Sep 6, 2025 · Apt BB

    Close
  • Unsanitary condition

    Sewage

    Sep 6, 2025 · Apt APTBB

    Close
  • Unsanitary condition

    Sewage

    Sep 6, 2025 · Apt BB

    Close
  • Unsanitary condition

    Sewage

    Sep 6, 2025 · Apt BB

    Close
  • General

    Janitor/super

    Sep 6, 2025 · Apt BB

    Close
  • General

    Cooking gas

    Aug 19, 2025 · Apt BC

    Close
  • Door/window

    Window frame

    Aug 19, 2025 · Apt BC

    Close
  • Door/window

    Window pane

    Aug 19, 2025 · Apt BC

    Close
  • Door/window

    Door

    Aug 19, 2025 · Apt BC

    Close
  • Door/window

    Door

    Aug 19, 2025 · Apt BC

    Close
  • Heat/hot water

    Apartment only

    Aug 19, 2025 · Apt BC

    Close
  • Door/window

    Window frame

    Aug 15, 2025 · Apt BB

    Close
  • Safety

    Window guard broken/missing

    Aug 15, 2025 · Apt BB

    Close
  • Door/window

    Door frame

    Aug 15, 2025 · Apt BB

    Close
  • Electric

    Lighting

    Aug 15, 2025 · Apt BB

    Close
  • Unsanitary condition

    Mold

    Jun 16, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Mold

    Jun 16, 2025 · Apt 2B

    Close
  • Door/window

    Window frame

    May 21, 2025 · Apt BC

    Close
  • Electric

    Lighting

    May 12, 2025 · Apt BC

    Close
  • Plumbing

    Bathtub/shower

    May 12, 2025 · Apt BC

    Close
  • General

    Cabinet

    May 12, 2025 · Apt BC

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1899
Floors
2
Residential units
9
Building area
3,520 ft²
Lot area
2,500 ft²
Zoning
R7-1
Community board
202
Council district
17
Block / lot
2708 / 36
Assessed value
$229,950
Landmark / historic district
Longwood Historic District

HPD registration #214599, last renewed Jun 27, 2025.

Questions about 750 Kelly Street

Who owns 750 Kelly Street?

The owner of record in NYC Department of City Planning PLUTO data is 750 Kelly Holdings LLC.

Does 750 Kelly Street have violations?

Yes. NYC HPD has recorded 77 housing violations at this property.

Is 750 Kelly Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 750 Kelly Street built?

City records list 1899 as the year it was built.

How many apartments are in 750 Kelly Street?

It has 9 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.