roofy

1021 Avenue St John

Bronx, NY 10455BBL 2-02683-0100Map

Owner of record: 1021-1027 Ave St. John Housing Develop F Und Corp

1021 Avenue St John is a walk-up apartment building built in 1925 in Bronx, 10455. It has 77 residential units across 5 floors. The owner of record is 1021-1027 Ave St. John Housing Develop F Und Corp. HPD has recorded 342 housing violations here, most recently on September 7, 2026. 49 of the 50 most recent violations are still open.

HPD violations
342
DOB violations
46
ECB violations
17
HPD complaints
256

What to know

Concern
25 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 7, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 342

  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from north located at apt 3c, 4th story, 1st apartment from west at north

    Sep 7, 2026 · Apt 3C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at east, the 2nd bathroom from north located at apt 3c, 4th story, 1st apartment from west at north

    Sep 7, 2026 · Apt 3C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from east at south wall in the 1st bathroom from north located at apt 3c, 4th story, 1st apartment from west at north

    Sep 7, 2026 · Apt 3C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall, west wall in the 1st bathroom from north located at apt 3c, 4th story, 1st apartment from west at north

    Sep 7, 2026 · Apt 3C

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tile floor in the 1st bathroom from north located at apt 3c, 4th story, 1st apartment from west at north

    Sep 7, 2026 · Apt 3C

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at bath tub in the 2nd bathroom from north located at apt 3c, 4th story, 1st apartment from west at north

    Sep 7, 2026 · Apt 3C

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tile at south wall in the 2nd bathroom from north located at apt 3c, 4th story, 1st apartment from west at north

    Sep 7, 2026 · Apt 3C

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3c, 4th story, 1st apartment from west at north

    Sep 7, 2026 · Apt 3C

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3c, 4th story, 1st apartment from west at north

    Sep 7, 2026 · Apt 3C

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq feet at east wall in the 2nd bathroom from north located at apt 3c, 4th story, 1st apartment from west at north

    Sep 7, 2026 · Apt 3C

    Open — Notice of issuance sent to tenant
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective sagging sloping wood floor in the kitchen located at apt 3c, 4th story, 1st apartment from west at north

    Sep 7, 2026 · Apt 3C

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3c, 4th story, 1st apartment from west at north

    Sep 7, 2026 · Apt 3C

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 4th story, 1st apartment from west at north

    Sep 7, 2026 · Apt 3C

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3c, 4th story, 1st apartment from west at north

    Sep 7, 2026 · Apt 3C

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from east at south wall in the 1st bathroom from north located at apt 3c, 4th story, 1st apartment from west at north

    Sep 7, 2026 · Apt 3C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st bathroom from north, the 2nd bathroom from north located at apt 3c, 4th story, 1st apartment from west at north

    May 29, 2026 · Apt 3C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd bathroom from north located at apt 3c, 4th story, 1st apartment from west at north

    May 29, 2026 · Apt 3C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st bathroom from north located at apt 3c, 4th story, 1st apartment from west at north

    May 29, 2026 · Apt 3C

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building entrance , 1st story, section ''1027''

    May 8, 2026

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story, section ''1027''

    May 8, 2026

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story, section ''1027''

    May 8, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story, section ''1027''

    May 8, 2026

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story, section ''1027''

    May 8, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story, section ''1027''

    May 8, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story, section ''1027''

    May 8, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 30, 2026

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1b, 2nd story, 1st apartment from east at south

    Mar 5, 2026 · Apt 1B

    Open — Notice of issuance sent to tenant
  • C

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2d , 3rd story, 1st apartment from north at east

    Mar 5, 2026 · Apt 2D

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2d , 3rd story, 1st apartment from north at east

    Mar 5, 2026 · Apt 2D

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door to boiler room locked at basement

    Mar 5, 2026

    Open — Nov sent out
  • C

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2a , 3rd story, 2nd apartment from east at south

    Mar 5, 2026 · Apt 2A

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2a , 3rd story, 2nd apartment from east at south

    Mar 5, 2026 · Apt 2A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd closet from south at west wall door frame, east wall, west wall in the 1st private hallway from north at west located at apt 3c, 4th story, 1st apartment from west at north , section ''1023'', 1st from north at northeast

    Jan 16, 2026 · Apt 3C

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective lower and upper glas panes at first window frame from west at north in the 1st room from north at center located at apt 3c, 4th story, 1st apartment from west at north , section ''1023'', 1st from north at northeast

    Jan 16, 2026 · Apt 3C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall in the 1st bathroom from north located at apt 3c, 4th story, 1st apartment from west at north , section ''1023'', 1st from north at northeast

    Jan 16, 2026 · Apt 3C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from west at north wall in the 1st room from north at center located at apt 3c, 4th story, 1st apartment from west at north , section ''1023'', 1st from north at northeast

    Jan 16, 2026 · Apt 3C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, east wall, west wall, 1st window frame from west at north wall, 1st window frame from north at east wall in the 1st room from north at east located at apt 3c, 4th story, 1st apartment from west at north , section ''1023'', 1st from north at northeast

    Jan 16, 2026 · Apt 3C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 2nd bathroom from north located at apt 3c, 4th story, 1st apartment from west at north , section ''1023'', 1st from north at northeast

    Jan 16, 2026 · Apt 3C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame in the foyer located at apt 3c, 4th story, 1st apartment from west at north , section ''1023'', 1st from north at northeast

    Jan 16, 2026 · Apt 3C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 2nd bathroom from north located at apt 3c, 4th story, 1st apartment from west at north , section ''1023'', 1st from north at northeast

    Jan 16, 2026 · Apt 3C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame in the 1st private hallway from north at west located at apt 3c, 4th story, 1st apartment from west at north , section ''1023'', 1st from north at northeast

    Jan 16, 2026 · Apt 3C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 3rd private hallway located at apt 3c, 4th story, 1st apartment from west at north , section ''1023'', 1st from north at northeast

    Jan 16, 2026 · Apt 3C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt 3c, 4th story, 1st apartment from west at north , section ''1023'', 1st from north at northeast

    Jan 16, 2026 · Apt 3C

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the 2nd bathroom from north located at apt 3c, 4th story, 1st apartment from west at north , section ''1023'', 1st from north at northeast

    Jan 16, 2026 · Apt 3C

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3c, 4th story, 1st apartment from west at north , section ''1023'', 1st from north at northeast

    Jan 16, 2026 · Apt 3C

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 4th story, 1st apartment from west at north , section ''1023'', 1st from north at northeast

    Jan 16, 2026 · Apt 3C

    Open — Notice of issuance sent to tenant
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3c, 4th story, 1st apartment from west at north , section ''1023'', 1st from north at northeast

    Jan 16, 2026 · Apt 3C

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective wood floor in the 1st private hallway from north at east located at apt 3c, 4th story, 1st apartment from west at north , section ''1023'', 1st from north at northeast

    Jan 16, 2026 · Apt 3C

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective wood floor in the 1st private hallway from north at west located at apt 3c, 4th story, 1st apartment from west at north , section ''1023'', 1st from north at northeast

    Jan 16, 2026 · Apt 3C

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective wood floor in the 1st room from north at east located at apt 3c, 4th story, 1st apartment from west at north , section ''1023'', 1st from north at northeast

    Jan 16, 2026 · Apt 3C

    Open — Nov sent out

DOB building violations · 46

  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2023

    Jun 23, 2024

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 22, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2022

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2022

    Dob violation - active
Show 36 more ↓
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)

    Aug 21, 2022

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2022

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 1, 2022

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2022

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2021

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2021

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Jun 20, 2021

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2021

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 29, 2020

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)

    Mar 18, 2019

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)

    Mar 27, 2018

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)

    Feb 16, 2017

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2017

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2016

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2015)

    Sep 1, 2016

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2016

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 29, 2016

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2016

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 9, 2016

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2015

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2015

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years

    Jun 1, 2015

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2015

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 6, 2014

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an energy efficiency report (eer) per ad. code sec. 28-308.4

    Dec 31, 2013

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 3, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed

ECB violations · 17

  • Class - 1

    Failure to provide unobstructed exit passageway for summons 39090115p. observed at all exposures obstructed fire-escapes systems with ac units and household items such as flower pots, rugs, crates, and personal

    Feb 25, 2026 · Penalty $25,000

    Active
  • Class - 1

    Upon inspection observed at all 4 exposures; fire escape windows have ac units installed. which is causing an obstruction & hazardous condition in the event of an emergency., remove obstruction

    Jul 12, 2023 · Penalty $6,250

    Active
  • Class - 1

    Unlawful acts.failure to comply w/an order of the comm's.in december 16,2015,february 15,2018.two electrical vio #was issued to the respondent.the respondent failed to comply w/(nyc) electrical code #27.3018(b)

    May 15, 2018 · Penalty $2,500

    Active
  • Class - 1

    Unlawful acts. failure to comply with an order of the commissioner. in december 16, 2015, september 23, 2017 two violations was issued to the respondent. the respondent failed to comply with nyc electrical

    Feb 15, 2018 · Penalty $2,400

    Active
  • Class - 1

    Unlawful acts. failure to comply with an order of the commissioner. in june 26,2017. a electrical violation was issued to the respondent the respondent failed to comply with (nyc) adminstrative code #28-201.1

    Sep 10, 2017 · Penalty $12,000

    Active
  • Class - 1

    Unlawful acts. failure to comply w/ an order of the commissioner. in 12/16/2015, 03/31/2017, 2 electrical violations was issue to the respondent. the respondent failed to comply w/ (nyc)# electrical code# 27-30

    Jun 26, 2017 · Penalty $12,000

    Active
  • Class - 1

    Unlawful acts. failure to comply w/an order of the commissioner. in 12-16-15;1-17-17,2 violation was issued to the respondent. the respondent failed to comply w/nyc electrical code & administrative code #27-301

    Mar 31, 2017 · Penalty $12,000

    Active
  • Class - 1

    Unlawful acts. failure to comply w/an order of the commissioner. in 12-16-15;2-25-16;4-28-16;8-15-16. all these electrical & administrative code violations was issue to the respondent. the respondent failed to

    Jan 17, 2017 · Penalty $12,000

    Active
  • Class - 1

    Unlawful acts. failure to comply w/an order of the commissioner. in 12/16/15,2/25/16,4/28/16. 4 electrical violaitons & 2 administrative violations was issue to the respodent. the respodent failed to comply #

    Aug 15, 2016 · Penalty $12,000

    Active
  • Class - 2

    Failure to comply w/ the comm's order contained in nov#35172775y issued on 3/29/16 & to file a cert of correction pursuant to 28-201.1,28-204.4 & 1rcny 102-01.rem comply w/ comm's order &/or file a cert of corr

    May 21, 2016 · Penalty $2,000

    Resolve
Show 7 more ↓
  • Class - 1

    Unlawful acts. failure to comply with an order of the commissioner. indecember 16, 2015, february 25, 2016 three electrical violations was issued to the respondent failed to comply with the local laws #27-3018

    Apr 28, 2016 · Penalty $12,000

    Active
  • Class - 1

    Failure to maintain building walls and appurtenances. noted: observed defects and cracks at exp#2 wall stucco and cracks at exp#3 wall stucco betw 2nd and 3rd flr. rmdy: maintain exterior building wall.

    Mar 29, 2016 · Penalty $5,000

    Active
  • Class - 1

    Unlawful acts. failure to comply w/an order of the commissioner. on 12-16-16 electrical violation was issued for apt 4b. work w/o a permit respondent failure to comply w/the electrical code 27-3018(b) ecb #

    Feb 25, 2016 · Penalty $12,000

    Active
  • Class - 2

    Failure to provide all fault circuit interrupter (afci) protection in dwelling units.the entire apt#4c:no arc-fault circuit interruptor provided,living room,bedrooms,receptacles outlets,lighting fixtures.rem pr

    Dec 16, 2015 · Penalty $10,000

    Active
  • Class - 2

    Failure to properly bond electrical systems.service switch has 3-400 amps,1-200 amps service switches neutral (bows) are not bonded to enclosures.rem provide broken bonding

    Dec 16, 2015 · Penalty $7,500

    Active
  • Class - 1

    Electrical work w/o a permit.the entire apt#4c:sub panel branch circuit wiring,receptacles outlets,switches,lighting fixtures.not on file.please notice.rem obtain permit.observed the above infractions @ 1015am

    Dec 16, 2015 · Penalty $8,000

    Active
  • Class - 2

    Unapproved/unsafe/unsuitable electrical equipment.apparatus materials,devices,appliances or wiring in use.the entire basement okn defective wiring are in use,(demoed) cables are not supported,(demoed) cables ar

    Dec 16, 2015 · Penalty $4,000

    Active

Complaints

  • Unsanitary condition

    Mold

    Oct 8, 2026 · Apt 3C

    Open
  • Unsanitary condition

    Pests

    Oct 8, 2026 · Apt 3C

    Open
  • Paint/plaster

    Wall

    Oct 8, 2026 · Apt 3C

    Open
  • Plumbing

    Water supply

    Sep 16, 2026 · Apt 4

    Open
  • Flooring/stairs

    Floor

    Aug 26, 2026 · Apt 3C

    Close
  • Unsanitary condition

    Mold

    Aug 26, 2026 · Apt 3C

    Close
  • Unsanitary condition

    Pests

    Aug 26, 2026 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Jun 20, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    May 26, 2026 · Apt 3C

    Close
  • Paint/plaster

    Wall

    May 26, 2026 · Apt 3C

    Close
Show 40 more ↓
  • Electric

    Power outage

    May 18, 2026 · Apt 5C

    Close
  • Electric

    Outlet/switch

    May 18, 2026 · Apt 5C

    Close
  • Heat/hot water

    Entire building

    Apr 8, 2026 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Apr 8, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 8, 2026 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Mar 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 24, 2026 · Apt 3D

    Close
  • Unsanitary condition

    Mold

    Mar 24, 2026 · Apt 3D

    Close
  • Heat/hot water

    Entire building

    Mar 4, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Mar 2, 2026 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Feb 25, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 25, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 23, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 23, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Jan 12, 2026 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Dec 5, 2025 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Nov 5, 2025 · Apt 5C

    Close
  • Unsanitary condition

    Pests

    Jun 27, 2025 · Apt 4D

    Close
  • Unsanitary condition

    Pests

    Jun 1, 2025 · Apt 3D

    Close
  • Unsanitary condition

    Pests

    May 21, 2025 · Apt 4D

    Close
  • Paint/plaster

    Ceiling

    Apr 3, 2025 · Apt 4D

    Close
  • Unsanitary condition

    Pests

    Apr 3, 2025 · Apt 4D

    Close
  • Plumbing

    Bathtub/shower

    Apr 3, 2025 · Apt 4D

    Close
  • Plumbing

    Basin/sink

    Apr 3, 2025 · Apt 4D

    Close
  • Flooring/stairs

    Floor

    Apr 3, 2025 · Apt 4D

    Close
  • Paint/plaster

    Wall

    Apr 3, 2025 · Apt 4D

    Close
  • Unsanitary condition

    Mold

    Apr 3, 2025 · Apt 4D

    Close
  • Unsanitary condition

    Pests

    Mar 31, 2025 · Apt 3D

    Close
  • Unsanitary condition

    Pests

    Mar 24, 2025 · Apt 4D

    Close
  • Paint/plaster

    Wall

    Mar 24, 2025 · Apt 4D

    Close
  • Flooring/stairs

    Floor

    Mar 24, 2025 · Apt 4D

    Close
  • Flooring/stairs

    Floor

    Mar 24, 2025 · Apt 4D

    Close
  • Plumbing

    Basin/sink

    Mar 24, 2025 · Apt 4D

    Close
  • Unsanitary condition

    Pests

    Feb 20, 2025 · Apt 4D

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C6)
Year built
1925
Floors
5
Residential units
77
Building area
61,878 ft²
Lot area
15,500 ft²
Zoning
R7-1
Community board
202
Council district
17
Block / lot
2683 / 100
Assessed value
$1,388,250
Landmark / historic district
No

HPD registration #201713, last renewed Dec 6, 2022.

Questions about 1021 Avenue St John

Who owns 1021 Avenue St John?

The owner of record in NYC Department of City Planning PLUTO data is 1021-1027 Ave St. John Housing Develop F Und Corp.

Does 1021 Avenue St John have violations?

Yes. NYC HPD has recorded 342 housing violations at this property.

Is 1021 Avenue St John rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1021 Avenue St John built?

City records list 1925 as the year it was built.

How many apartments are in 1021 Avenue St John?

It has 77 residential units and 81 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.