791 East 163 Street
Bronx, NY 10456BBL 2-02669-0066Map
Owner of record: Narendranauth Ramlagan
791 East 163 Street is a mixed residential and retail building built in 1920 in Bronx, 10456. It has 2 residential units across 3 floors. The owner of record is Narendranauth Ramlagan. HPD has recorded 74 housing violations here, most recently on November 24, 2025. 47 of the 50 most recent violations are still open.
- HPD violations
- 74
- DOB violations
- 32
- ECB violations
- 23
- HPD complaints
- 107
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 74
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 24, 2025
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 3, 2024
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2023
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 8, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jan 12, 2018
Closed — Violation dismissed - BHazardous
Replace the broken or defective drain pipe at wash basin in the bathroom located at apt 1, 2nd story
May 10, 2013 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective doors at base cabinet at sink in the kitchen located at apt 1, 2nd story
May 10, 2013 · Apt 1
Open — Nov sent out - ANon-hazardous
Replace the broken or defective drain pipe at sink in the kitchen located at apt 1, 2nd story
May 10, 2013 · Apt 1
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the floors of basement throughout at basement
Mar 11, 2013
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 1, 2nd story, 1st apartment from south at west
Sep 6, 2012 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden cabinet at north wall in the kitchen located at apt 1, 2nd story, 1st apartment from south at west
Sep 6, 2012 · Apt 1
Open — Nov sent out - BHazardous
Properly secure the loose wooden cabinet at north wall in the kitchen located at apt 1, 2nd story, 1st apartment from south at west
Sep 6, 2012 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden base at wash basin in the bathroom located at apt 1, 2nd story, 1st apartment from south at west
Sep 6, 2012 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1, 2nd story, 1st apartment from south at west
Sep 6, 2012 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 1, 2nd story, 1st apartment from south at west
Sep 6, 2012 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective reglace bathtub in the bathroom located at apt 3, 2nd story, 1st apartment from north at east
Oct 1, 2009 · Apt 3
Open — Nov sent out - BHazardous
Properly secure the loose electic receptacle at north wall in the 1st room from east located at apt 3, 2nd story, 1st apartment from north at east
Oct 1, 2009 · Apt 3
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt 3, 2nd story, 1st apartment from north at east
Oct 1, 2009 · Apt 3
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin (roaches) in the entire apartment located at apt 1, 2nd story, 1st apartment from south at west
Oct 16, 2006 · Apt 1
Open — Nov sent out - ANon-hazardous
Refit the closet door in the 1st room from north located at apt 1, 2nd story, 1st apartment from south at west
Oct 16, 2006 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective window sashes in the 4th room from north located at apt 1, 2nd story, 1st apartment from south at west
Oct 16, 2006 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin (mice) in the entire apartment located at apt 1, 2nd story, 1st apartment from south at west
Oct 16, 2006 · Apt 1
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in drain pipe at wash basin in the bathroom located at apt 1, 2nd story, 1st apartment from south at west
Oct 16, 2006 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective door saddle in the entrance located at apt 1, 2nd story, 1st apartment from south at west
Oct 16, 2006 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling east wall in the bathroom located at apt 1, 2nd story, apartment at west
Sep 21, 2006 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective doors on closet in the 1st room from north located at apt 1, 2nd story, apartment at west
Sep 21, 2006 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective window counter balance lower sash in the 5th room from north located at apt 1, 2nd story, apartment at west
Sep 21, 2006 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the missing locking device on door in the entrance located at apt 1, 2nd story, apartment at west
Sep 21, 2006 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt 1, 2nd story, apartment at west
Sep 21, 2006 · Apt 1
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line at wash basin in the bathroom located at apt 1, 2nd story, apartment at west
Sep 21, 2006 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective window counter balance lower sash in the 1st room from north located at apt 1, 2nd story, apartment at west
Sep 21, 2006 · Apt 1
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 1, 2nd story, apartment at west
Sep 21, 2006 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed water leak at ceiling in the bathroom located at apt 1, 2nd story, apartment at west
Sep 21, 2006 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electical wire at ceiling in the bathroom located at apt 1, 2nd story, apartment at west
Sep 21, 2006 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the bathroom located at apt 2, 2nd story, apartment at south
Jun 11, 2006 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east wall shower in the bathroom located at apt 2, 2nd story, apartment at south
Jun 11, 2006 · Apt 2
Open — Nov sent out - BHazardous
Properly secure the loose sink /basin in the bathroom located at apt 2, 2nd story, apartment at south
Jun 11, 2006 · Apt 2
Open — Nov sent out - BHazardous
Properly secure the loose metal railing around rear extention roof
Jun 11, 2006
Open — Nov sent out - BHazardous
Replace with new the broken or defective door frame in the entrance located at apt 2, 2nd story, 1st apartment from east at south
Jun 11, 2006 · Apt 2
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of concealed water leak at south wall window sill in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Jun 11, 2006 · Apt 2
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of concealed water leak over window sill at south wall in the 2nd room from north located at apt 2, 2nd story, 1st apartment from east at south
Jun 11, 2006 · Apt 2
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear
Jun 11, 2006
Open — Nov sent out - BHazardous
Properly repair the broken or defective mortise door lock in the entrance located at apt 2, 2nd story, 1st apartment from east at south
Jun 11, 2006 · Apt 2
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at west yard
Mar 13, 2006
Open — Nov sent out - ANon-hazardous
Replace with new the missing doors at base cabinet in the kitchen located at apt 1, 2nd story
Mar 13, 2006 · Apt 1
Open — Nov sent out - ANon-hazardous
Refit lower window sashes in the 4th room from north located at apt 1, 2nd story
Mar 13, 2006 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly secure the loose ceramic tiles at east wall in the bathroom located at apt 1, 2nd story
Mar 13, 2006 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1, 2nd story
Mar 13, 2006 · Apt 1
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1, 2nd story
May 4, 2005 · Apt 1
Open — Nov sent out
DOB building violations · 32
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 23, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 26, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 26, 2021
Dob violation - active
Show 22 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Construction other optional
Due to fire
Jul 20, 2016
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Construction other optional
C-construction other optional
May 1, 2013
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - active
ECB violations · 23
- Class - 1
Unlawful acts. failure to comply with commissioner's order for summons 35566899h, which refers to failure to comply with commissioner's order for violation 39036503j issued on 02/19/2021., comply with commissio
Apr 16, 2026 · Penalty $25,000
Active - Class - 1
Failure to comply w/commissioner's order contained in summons/v34036503j issued2/19/21 &to file c/c pursuant to28-201.1&1rcny102-01.comply w/commissioner's order &/or file c/c.
Feb 17, 2022 · Penalty $25,000
Active - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#39036504l issued on 02/19/21 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissi
Sep 17, 2021 · Penalty $5,000
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#34036503j issued on 02/19/21 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.no permit or application
Sep 17, 2021 · Penalty $25,000
Active - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#39036501x issued on 02/19/21 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.no permit or application
Sep 17, 2021 · Penalty $12,500
Resolve - Class - 1
Failure to comply w/commissioner's order contained in summons/v39036501x issued2/19/21 &to file c/c pursuant to28-201.1&1rcny102-01.comply w/commissioner's order &/or file c/c.
Aug 5, 2021 · Penalty $12,500
Resolve - Class - 1
Failure to comply w/commissioner's order contained in summons/v34036503j issued2/19/21 &to file c/c pursuant to28-201.1&1rcny102-01.comply w/commissioner's order &/or file c/c.
Aug 5, 2021 · Penalty $25,000
Active - Class - 2
Failure to comply w/commissioner's order contained in summons/v39036504l issued2/19/21 &to file c/c pursuant to28-201.1&1rcny102-01.comply w/commissioner's order &/or file c/c.
Aug 5, 2021 · Penalty $5,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#39036504l issued on 02/19/21 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. failure to obey a vacate order from the commissione
Jun 29, 2021 · Penalty $5,000
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#34036503j issued on 02/19/21 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. work w/o permit. remedy: comply w/comm's order &/or
Jun 29, 2021 · Penalty $25,000
Active
Show 13 more ↓
- Class - 1
Failure to comply w/the comm's order contained in summons/vio#39036501x issued on 02/19/21 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. work w/o permit. remedy: comply w/comm's order &/or
Jun 29, 2021 · Penalty $12,500
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#39036501x issued on 2/19/2021 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.no permit filed to corr
May 17, 2021 · Penalty $6,250
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#39036504l issued on 2/19/2021 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.remedy:comply with comm
May 17, 2021 · Penalty $3,125
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#39036503j issued on 2/19/2021 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.no permit filed to corr
May 17, 2021 · Penalty $6,250
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#39038245p issued on 3/23/2021 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.remedy:comply with comm
May 5, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#39036504l issued on 2/19/2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to obey vacate
Mar 31, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#39036501x issued on 2/19/2021 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to comply with
Mar 31, 2021 · Penalty $3,125
Resolve - Class - 1
Removed or defaced a written posted vacate order. at time of inspection, observed, vacate order #110/2017 and sticker/poster has removed, nowhere to be viewed or noticed., comply with code
Mar 23, 2021 · Penalty $2,500
Active - Class - 1
W/o a permit. noted: at 2nd flr - water & waste lines installed for bathtub. at 3rd flr - gas line installed for stove; water & waste lines installed for residential sink at kitchen area., obtain permit
Feb 19, 2021 · Penalty $12,500
Active - Class - 2
Failure to maintain building in code compliant manner. noted: at front yard (exposure 1) - concrete steps to commercial & residential area's observed cracked & deteriorating., repair and/or replace
Feb 19, 2021 · Penalty $3,125
Active - Class - 1
Failure to comply with the commissioner's order to file/perform a final inspection with the department of buildings. noted: at time of inspection observed completed work for job #'s 220552195; 220050030; 220046
Feb 19, 2021 · Penalty $12,500
Active - Class - 2
Residence converted from 1 to 2 families. noted: at time of inspection observed 2nd & 3rd flrs sub-divided & class 'a' apts created at each - 2nd flr: arranged with 3 pc bthrm; kitchen with electric stove, resi
Feb 19, 2021 · Penalty $10,000
Active - Class - 1
Failure to obey a vacate order from the commissioner per 28-207.4. noted: at time of inspection - observed 1st flr occupied & in operation as a restaurant & 3rd flr occupied by family of 3 as a class 'a' apt co
Feb 19, 2021 · Penalty $24,000
Active
Complaints
- Plumbing
Basin/sink
May 6, 2013 · Apt 1
Close - Plumbing
Basin/sink
May 6, 2013 · Apt 1
Close - Plumbing
Sewer
Mar 7, 2013 · Apt 2
Close - Plumbing
Sewer
Mar 7, 2013 · Apt 2
Close - Nonconst
Janitor/super
Aug 21, 2012 · Apt 1
Close - Paint/plaster
Ceiling
Aug 21, 2012 · Apt 1
Close - Nonconst
Vermin
Aug 21, 2012 · Apt 1
Close - Nonconst
Vermin
Aug 21, 2012 · Apt 1
Close - General
Floor
Jun 5, 2012 · Apt 2
Close - Electric
Bell-buzzer/intercom
Jun 5, 2012 · Apt 2
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Jun 5, 2012 · Apt 2
Close - Nonconst
Vermin
Aug 18, 2011 · Apt 1
Close - Plumbing
Shower-stall
Aug 18, 2011 · Apt 1
Close - Heating
Heat related
Feb 24, 2011 · Apt 1
Close - Heating
Heat related
Feb 23, 2011 · Apt 1
Close - Paint/plaster
Ceiling
Sep 29, 2009 · Apt 3
Close - Electric
Wiring
Sep 29, 2009 · Apt 3
Close - Electric
Wiring
Sep 29, 2009 · Apt 3
Close - Plumbing
Toilet
Sep 29, 2009 · Apt 3
Close - Plumbing
Bathtub/shower
Sep 29, 2009 · Apt 3
Close - Nonconst
Vermin
Nov 28, 2006 · Apt 2
Close - Nonconst
Vermin
Nov 28, 2006 · Apt 2
Close - Plumbing
Shower-stall
Nov 28, 2006 · Apt 2
Close - General
Doors
Nov 28, 2006 · Apt 2
Close - Heating
Heat related
Nov 28, 2006 · Apt 2
Close - Heating
Heat related
Oct 24, 2006 · Apt 2
Close - Plumbing
Basin/sink
Oct 6, 2006 · Apt 1
Close - Nonconst
Vermin
Oct 6, 2006 · Apt 1
Close - General
Ceramic-tile
Oct 6, 2006 · Apt 1
Close - General
Windows
Oct 6, 2006 · Apt 1
Close - General
Windows
Oct 6, 2006 · Apt 1
Close - Heating
Heat related
Oct 6, 2006 · Apt 1
Close - General
Windows
Sep 20, 2006 · Apt 1
Close - Nonconst
Vermin
Sep 20, 2006 · Apt 1
Close - Plumbing
Basin/sink
Sep 20, 2006 · Apt 1
Close - Plumbing
Bathtub/shower
Sep 20, 2006 · Apt 1
Close - Plumbing
Sewer
Sep 20, 2006 · Apt 1
Close - Plumbing
Water-leaks
Sep 20, 2006 · Apt 1
Close - Plumbing
Basin/sink
Sep 18, 2006 · Apt 1
Close - Plumbing
Basin/sink
Sep 18, 2006 · Apt 1
Close - Plumbing
Toilet
Sep 18, 2006 · Apt 1
Close - Plumbing
Water-leaks
Sep 18, 2006 · Apt 1
Close - Paint/plaster
Ceiling
Sep 18, 2006 · Apt 1
Close - Paint/plaster
Ceiling
Aug 30, 2006 · Apt 1
Close - Nonconst
Vermin
Aug 30, 2006 · Apt 1
Close - Nonconst
Vermin
Aug 30, 2006 · Apt 1
Close - General
Doors
Aug 30, 2006 · Apt 1
Close - General
Floor
Aug 30, 2006 · Apt 1
Close - General
Floor
Aug 30, 2006 · Apt 1
Close - Plumbing
Water-leaks
Aug 30, 2006 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1920
- Floors
- 3
- Residential units
- 2
- Building area
- 1,450 ft²
- Lot area
- 1,101 ft²
- Zoning
- R6
- Community board
- 203
- Council district
- 17
- Block / lot
- 2669 / 66
- Assessed value
- $39,840
- Landmark / historic district
- No
HPD registration #712239, last renewed Feb 22, 2023.
Questions about 791 East 163 Street
Who owns 791 East 163 Street?
The owner of record in NYC Department of City Planning PLUTO data is Narendranauth Ramlagan.
Does 791 East 163 Street have violations?
Yes. NYC HPD has recorded 74 housing violations at this property.
Is 791 East 163 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 791 East 163 Street built?
City records list 1920 as the year it was built.
How many apartments are in 791 East 163 Street?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.