roofy

755 East 168 Street

Bronx, NY 10456BBL 2-02663-0062Map

Owner of record: Parrocks Associates

755 East 168 Street is an elevator apartment building built in 1904 in Bronx, 10456. It has 62 residential units across 6 floors. The owner of record is Parrocks Associates. HPD has recorded 422 housing violations here, most recently on September 8, 2026. 5 of the 50 most recent violations are still open.

HPD violations
422
DOB violations
40
ECB violations
22
HPD complaints
955

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Watch
Last violation Sep 8, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 422

  • A

    Paint metal in accordance with dept. regulation radiator cover in the bathroom located at apt a2h, 2nd story, 1st apartment from north at east

    Sep 8, 2026 · Apt A2H

    Open — Civ14 mailed
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt a2h, 2nd story, 1st apartment from north at east

    Sep 8, 2026 · Apt A2H

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department . in the kitchen located at apt a2h, 2nd story, 1st apartment from north at east

    Sep 8, 2026 · Apt A2H

    Open — Civ14 mailed
  • A

    Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt a2h, 2nd story, 1st apartment from north at east

    Sep 8, 2026 · Apt A2H

    Open — Civ14 mailed
  • B

    Properly repair with similar material the broken or defective wood window stool at east wall in the 1st room from east located at apt 4k, 4th story, 2nd apartment from east at south

    Jan 16, 2026 · Apt 4K

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective vynil floor tiles in the kitchen located at apt 1b, 1st story, 1st apartment from south at west

    Jan 16, 2026 · Apt 1B

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective shower mixing valve at bathtub in the bathroom located at apt 3d, 3rd story, 1st apartment from west at north , section ''center''

    Dec 31, 2025 · Apt 3D

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 3d, 3rd story, 1st apartment from west at north , section ''center''

    Dec 31, 2025 · Apt 3D

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 6k, 6th story, 1st apartment from east at south

    Dec 31, 2025 · Apt 6K

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story, 1st apartment from west at north

    Dec 16, 2025 · Apt 3C

    Closed — Violation closed
Show 40 more ↓
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system wrong sign posted at 1st story at public hall

    Dec 16, 2025

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing [wood wedge] at north 3 door to stairs at 1st story (west section) at public hall

    Dec 16, 2025

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing [wood wedge] at 2nd door from east at 4th story at public hall

    Dec 16, 2025

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing [wood wedge ]at 2nd door from east at public hall, 6th story

    Dec 16, 2025

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3c, 3rd story, 1st apartment from west at north

    Dec 16, 2025 · Apt 3C

    Closed — Violation closed
  • B

    Properly secure the loose doors at closet at south in the 2nd room from north at west located at apt 1b, 1st story, 1st apartment from south at west

    Nov 7, 2025 · Apt 1B

    Closed — Violation dismissed
  • B

    Properly secure the loose doors at closet at north in the foyer located at apt 1b, 1st story, 1st apartment from south at west

    Nov 7, 2025 · Apt 1B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west

    Nov 7, 2025 · Apt 1B

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation steam risers and radiators in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west

    Nov 7, 2025 · Apt 1B

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling all walls and trim works in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west

    Nov 7, 2025 · Apt 1B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west

    Nov 7, 2025 · Apt 1B

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west

    Nov 7, 2025 · Apt 1B

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west

    Nov 7, 2025 · Apt 1B

    Closed — Violation dismissed
  • B

    Properly secure the loose closet doors at closet at west in the 2nd private hallway from north located at apt 1b, 1st story, 1st apartment from south at west

    Nov 7, 2025 · Apt 1B

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1b, 1st story, 1st apartment from south at west

    Nov 7, 2025 · Apt 1B

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective reglaze bathtub in the bathroom located at apt 4h, 4th story, 1st apartment from north at east

    Jun 25, 2025 · Apt 4H

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4h, 4th story, 1st apartment from north at east

    Jun 25, 2025 · Apt 4H

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the bathroom located at apt 4h, 4th story, 1st apartment from north at east

    Jun 25, 2025 · Apt 4H

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective wood floor in the 3rd room from north at west located at apt 1h, 1st story, 1st apartment from north at east

    Mar 18, 2025 · Apt 1H

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color south wall and west wall in the 3rd room from north at west located at apt 1h, 1st story, 1st apartment from north at east

    Mar 18, 2025 · Apt 1H

    Closed — Violation closed
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl : in the bathroom located at apt 1h, 1st story, 1st apartment from north at east

    Mar 18, 2025 · Apt 1H

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective porcelain finish in bathtub in the bathroom located at apt 1h, 1st story, 1st apartment from north at east

    Mar 18, 2025 · Apt 1H

    Open — Not complied with
  • A

    Refit lower sash at first window from north at east in the 1st room from north at east located at apt 1h, 1st story, 1st apartment from north at east

    Mar 18, 2025 · Apt 1H

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing

    Jan 19, 2025

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch and its assemblies at hopper chute door at public hall, 6th story

    Jan 19, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at hopper chute door at public hall, 6th story

    Jan 19, 2025

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 6d, 6th story, 1st apartment from west at north , section ''center''

    Jan 9, 2025 · Apt 6D

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 6d, 6th story, 1st apartment from west at north , section ''center''

    Jan 9, 2025 · Apt 6D

    Closed — Violation dismissed
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts at all stories at building front at fire escape

    Sep 6, 2024

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective bathtub at north wall by method of reglaze porcelain enamel in the bathroom located at apt 3h, 3rd story, 1st apartment from north at east

    Aug 8, 2024 · Apt 3H

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective cracked decorative cement cornice at 3rd story (building front)

    Aug 8, 2024

    Closed — Violation dismissed
  • A

    § 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder (tack welded) use appropriate nuts and bolts at 1st fire escape from west at south exterior wall

    Aug 8, 2024

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood at west wall (lower sink cabinet) rotted in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west

    Aug 8, 2024 · Apt 2B

    Closed — Violation dismissed
  • C

    Provide an adequate supply of gas to the fixtures range at west wall in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west

    Aug 8, 2024 · Apt 2B

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic wall bathroom tile at north wall (bathtub) in the bathroom located at apt 3h, 3rd story, 1st apartment from north at east

    Aug 8, 2024 · Apt 3H

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic floor tile at bathroom in the bathroom located at apt 3h, 3rd story, 1st apartment from north at east

    Aug 8, 2024 · Apt 3H

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective fire retardant material at the ceiling at public hall, 6th story

    Jul 16, 2024

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 6th story

    Jul 16, 2024

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak above the ceiling at public hall, 6th story

    Jul 16, 2024

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish by method of reglaze at bathtub in the bathroom located at apt 3h, 3rd story, 1st apartment from north at east

    Apr 28, 2024 · Apt 3H

    Closed — Violation closed

DOB building violations · 40

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 5, 2020

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 11, 2019

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2019

    Dob violation - dismissed
Show 30 more ↓
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2017

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 28, 2017

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 21, 2017

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 8, 2017

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 13, 2016

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 18, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 26, 2015

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 8, 2013

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 3, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 1, 2011

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 12, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 6, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 18, 2005

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 21, 2004

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 7, 2003

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 21, 2003

    Dob violation - active
  • Elevator elevatorrequired

    2p5290

    Jun 29, 2001

    Dob violation - resolved
  • Elevator elevatorrequired

    2p5290

    May 15, 2000

    Dob violation - resolved
  • Elevator elevatorrequired

    2p5290

    Apr 23, 1999

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 5, 1990

    Dob violation - resolved

ECB violations · 22

  • Class - 1

    42-m-7, no door lock monitoring installed in this controller as mandated by 3.10.12. of appendix k3. of 2014. file application , install dlm,and perform and file test with nyc dob , 67-l-10 communication defect

    May 8, 2020 · Penalty $1,250

    Active
  • Class - 1

    Upon inspection, the device is found to be out-of-service creating a hazardous condition as per 1rcny 11-02. this device provides service in a six story building, remedy; restore to service immediately and, not

    Apr 8, 2020 · Penalty $1,250

    Active
  • Class - 1

    Restore to service

    Mar 27, 2020 · Penalty $3,125

    Resolve
  • Class - 1

    97x17:97-x-17=entire device remains inoperative on a 6th story building w/ no alternate service creating a hazardous condition and a hassle to tenants. this is a recurring condition agg-1 per 1rcny 102-01(f)-mu

    Feb 27, 2020 · Penalty $3,125

    Active
  • Class - 1

    Upon inspection, the device is found to be out-of-service creating a hazardous condition as per 1rcny 11-02. this device provides service in a six story building. remedy ; restore to service immediately and, no

    Dec 24, 2019 · Penalty $3,125

    Active
  • Class - 1

    97-x-17 upon inspection device was found to be out of service. this isthat only elevator in the buildings. restore to service immediately & contact nyc dob for a complete inspection.

    Nov 4, 2019 · Penalty $3,125

    Active
  • Class - 1

    Cease use 97-x-17-the only elevator in the building out of service. based upon my inspection the device is found to be out of service creating a hazardous condition as per 1rcny 11-02. remedy restore to service

    Sep 9, 2019 · Penalty $1,250

    Active
  • Class - 2

    70z09,03i10,100m07,39o02,52d02,46b07,35m07,59bb07,56y10,39o02. 70z-remove water from pit; 03i-repair inside car; 100m-provide and install handrail in car; 39o-clean car top; 52o-clean ropes; 46b-provide in mo

    Jun 30, 2019 · Penalty $625

    Active
  • Class - 1

    97x17 the only elevator in blg (or section of bldg) out of service.upon inspection, the device is found to be out of service. creating a hazardous condition as per 1rcny 11-02. restore to service immediately

    Jan 14, 2018 · Penalty $1,000

    Resolve
  • Class - 1

    97x17 the only elevator in building out of service.upon inspection the device is found to be out of service creating hazardous condition asper 1rcny 11-02 rmdy:restore to service immediately and notify nycdob

    Apr 5, 2017 · Penalty $1,000

    Resolve
Show 12 more ↓
  • Class - 1

    97x17 the only elevator in bldg out of service. upon inspection the device is found to be out of service creating a hazardous condition as per 14cny 11-02. rmdy: restore to service immediately and notify nycdo

    Mar 29, 2017 · Penalty $1,000

    Resolve
  • Class - 1

    05x10,70o02,70z09,67y10,42q03/05)door restrictor not working;42)provide guards for restrictor rack;70)remove water from pit;42)on top of car

    Dec 10, 2016 · Penalty $1,000

    Active
  • Class - 2

    97x10 repair elevator and return to service as soon as possible so that a full inspection can be made by the department.

    Mar 13, 2016 · Penalty $500

    Resolve
  • Class - 1

    Cu59l10,cu01l10,cu07x10n59u15,41t07,57bb11,58h11,52u15,39l10,16h11,17h11,100m07,70o02,18h11. 59-upon tripping governor overspeed brakes delay to stop car; 01-in car stop switch defective car continues to drift

    Feb 17, 2016 · Penalty $1,000

    Active
  • Class - 2

    03m11,15m11,29q03,67x10,70z02,71x10,77x10. 04m11-replace handrail in car; 67x10-repair communication in car (telephone); 77x10-repair lightunder car.

    Oct 20, 2015 · Penalty $500

    Active
  • Class - 2

    01l10,67x10,70o02,100m07,03m07. 01-defective when activated car continue to close door and start going up and down on relevel; 67-communication inoperative must repair and provide; 70-pit dirty clean; 100m-main

    Mar 30, 2015 · Penalty $500

    Resolve
  • Class - 2

    17h1116r0941d06. 17h11 replace worn hoistway door gibs. 16r09 remove locked gate basement hall door causing illegal condition as well as (0)clearance vestibule. 41d06 properly secure.

    Jun 14, 2009 · Penalty $500

    Active
  • Non-hazardous

    84i10.66o02.40d06.58m07.11l10.16h11. 84i10.car saddle is loose properly saddle 40d06 machine rm door is unsecured properly secure 58m07 carfer pins 11l10 push buttons in elevator don't work car won't stop at al

    Jun 27, 2008 · Penalty $350

    Active
  • Non-hazardous

    23m07,25d06,41a11,41d06,58a07,40t07,16r09,38o02,66o02.23m07-provide missing,2fl hall button station.25d06-properly secure top emergency cover.41a11-remove all wires hanging from terminal strip properly secure a

    Jul 10, 2007 · Penalty $180

    Resolve
  • Non-hazardous

    83x16/39p16-83x16-restore elevator back to service so that a proper inspection can be done by this dept.39p16-provide access to motor rm so that a proper inspection can be done by this department

    Sep 9, 2006 · Penalty $350

    Resolve
  • Non-hazardous

    5k10 15k10 22d6 31q3 57d6 57o2 56l11 15k10=1 to 6 31q3=car top 57d6=pit ladder

    Jun 30, 2000

    Resolve
  • Non-hazardous

    14m,35p,57o.

    Jul 13, 1995 · Penalty $1,000

    Active

Complaints

  • Unsanitary condition

    Pests

    Sep 20, 2026 · Apt 5K

    Close
  • Paint/plaster

    Wall

    Aug 26, 2026 · Apt A2H

    Close
  • Plumbing

    Bathtub/shower

    Aug 26, 2026 · Apt A2H

    Close
  • Plumbing

    Basin/sink

    Aug 26, 2026 · Apt A2H

    Close
  • Plumbing

    Toilet

    Aug 26, 2026 · Apt A2H

    Close
  • Unsanitary condition

    Pests

    Aug 26, 2026 · Apt A2H

    Close
  • Appliance

    Refrigerator

    Aug 26, 2026 · Apt A2H

    Close
  • Flooring/stairs

    Floor

    Aug 26, 2026 · Apt A2H

    Close
  • General

    Cabinet

    Aug 26, 2026 · Apt A2H

    Close
  • Unsanitary condition

    Mold

    Aug 26, 2026 · Apt A2H

    Close
Show 40 more ↓
  • Plumbing

    Radiator

    Jul 17, 2026 · Apt 3D

    Close
  • Flooring/stairs

    Floor

    Jul 17, 2026 · Apt 3D

    Close
  • General

    Cabinet

    Jul 17, 2026 · Apt 3D

    Close
  • Water leak

    Heavy flow

    May 26, 2026 · Apt 2K

    Close
  • Heat/hot water

    Entire building

    Jan 28, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 19, 2026 · Apt 6J

    Close
  • Door/window

    Door

    Jan 19, 2026 · Apt 6J

    Close
  • Heat/hot water

    Apartment only

    Dec 29, 2025 · Apt 3D

    Close
  • Water leak

    Heavy flow

    Dec 17, 2025 · Apt 6E

    Close
  • Paint/plaster

    Ceiling

    Dec 17, 2025 · Apt 6E

    Close
  • Heat/hot water

    Entire building

    Dec 15, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 14, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Electric

    Outlet/switch

    Nov 24, 2025 · Apt 3B

    Close
  • Door/window

    Door

    Nov 24, 2025 · Apt 4H

    Close
  • Unsanitary condition

    Pests

    Nov 24, 2025 · Apt 4H

    Close
  • Plumbing

    Basin/sink

    Nov 24, 2025 · Apt 4J

    Close
  • Paint/plaster

    Ceiling

    Nov 24, 2025 · Apt 6B

    Close
  • Unsanitary condition

    Pests

    Nov 24, 2025 · Apt 6K

    Close
  • Paint/plaster

    Ceiling

    Nov 24, 2025 · Apt BLDNG

    Close
  • Paint/plaster

    Wall

    Nov 24, 2025 · Apt BLDNG

    Close
  • Door/window

    Door

    Nov 24, 2025 · Apt 3C

    Close
  • Unsanitary condition

    Pests

    Nov 24, 2025 · Apt 3C

    Close
  • Paint/plaster

    Ceiling

    Nov 24, 2025 · Apt 4J

    Close
  • Paint/plaster

    Ceiling

    Nov 24, 2025 · Apt 6B

    Close
  • Door/window

    Door

    Nov 24, 2025 · Apt 6J

    Close
  • Unsanitary condition

    Pests

    Nov 24, 2025 · Apt 6J

    Close
  • Plumbing

    Bathtub/shower

    Nov 24, 2025 · Apt 6K

    Close
  • Unsanitary condition

    Pests

    Nov 24, 2025 · Apt 6K

    Close
  • Paint/plaster

    Door/frame

    Nov 3, 2025 · Apt 1B

    Close
  • Paint/plaster

    Wall

    Nov 3, 2025 · Apt 1B

    Close
  • Paint/plaster

    Ceiling

    Nov 3, 2025 · Apt 1B

    Close
  • Paint/plaster

    Wall

    Sep 8, 2025 · Apt 1B

    Close
  • Electric

    No lighting

    Jul 25, 2025 · Apt 1J

    Close
  • Plumbing

    Bathtub/shower

    Jun 24, 2025 · Apt 4H

    Close
  • Plumbing

    Radiator

    Jun 24, 2025 · Apt 4H

    Close
  • Door/window

    Door

    Jun 24, 2025 · Apt 4H

    Close
  • Water leak

    Slow leak

    Jun 24, 2025 · Apt 4H

    Close
  • Paint/plaster

    Wall

    Jun 24, 2025 · Apt 4H

    Close
  • Unsanitary condition

    Mold

    Apr 25, 2025 · Apt 1B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D5)
Year built
1904
Floors
6
Residential units
62
Building area
74,966 ft²
Lot area
16,990 ft²
Zoning
R6
Community board
203
Council district
17
Block / lot
2663 / 62
Assessed value
$1,778,400
Landmark / historic district
No

HPD registration #210114, last renewed Aug 19, 2025.

Questions about 755 East 168 Street

Who owns 755 East 168 Street?

The owner of record in NYC Department of City Planning PLUTO data is Parrocks Associates.

Does 755 East 168 Street have violations?

Yes. NYC HPD has recorded 422 housing violations at this property.

Is 755 East 168 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 755 East 168 Street built?

City records list 1904 as the year it was built.

How many apartments are in 755 East 168 Street?

It has 62 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.