roofy

588 Timpson Place

Bronx, NY 10455BBL 2-02603-0073Map

Owner of record: Timpson Place Associates LLC

588 Timpson Place is an elevator apartment building built in 1920 in Bronx, 10455. It has 50 residential units across 6 floors. The owner of record is Timpson Place Associates LLC. HPD has recorded 91 housing violations here, most recently on July 7, 2026. 18 of the 50 most recent violations are still open.

HPD violations
91
DOB violations
37
ECB violations
4
HPD complaints
283

What to know

Concern
7 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Jul 7, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 91

  • B

    Properly repair or replace the broken or defective base sink cabinet at south wall in the kitchen located at apt 2g, 2nd story, 4th apartment from west at north

    Jul 7, 2026 · Apt 2G

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 3rd room from north at east located at apt 2g, 2nd story, 4th apartment from west at north

    Jul 7, 2026 · Apt 2G

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 30, 2026

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling , west and north walls in the bathroom located at apt 2g, 2nd story, 4th apartment from west at north

    Apr 25, 2026 · Apt 2G

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 2g, 2nd story, 4th apartment from west at north

    Apr 25, 2026 · Apt 2G

    Closed — Violation dismissed
  • A

    M/d law abate the nuisance consisting of vinyl floor tiles ( cracked) creating potential trip hazard in the private hallway located at apt 2g, 2nd story, 4th apartment from west at north

    Apr 25, 2026 · Apt 2G

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling , west and north walls in the bathroom located at apt 2g, 2nd story, 4th apartment from west at north original violation 18813205 issued 25-apr-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Apr 25, 2026 · Apt 2G

    Open — Notice of issuance sent to tenant
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at hopper door at compactor closet, 2nd story

    Apr 25, 2026

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 2g, 2nd story, 4th apartment from west at north

    Apr 25, 2026 · Apt 2G

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective closing arm at building entrance , 1st story

    Apr 18, 2026

    Closed — Violation closed
Show 40 more ↓
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2g, 2nd story, 2nd apartment from south at west , section ''north''

    Jun 24, 2025 · Apt 2G

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Jun 24, 2025

    Open — Not complied with
  • B

    Provide adequate supply of hot water for the fixtures inadequate hot water volume at sink in the kitchen located at apt 3d, 3rd story, 2nd apartment from south at west , section ''south''

    Jun 24, 2025 · Apt 3D

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Mar 6, 2025

    Closed — Violation closed
  • C

    Trace and repair the source and abate the visible mold condition... approximately 20 sq ft at ceiling, 12 sq ft at west wall, 8 sq ft at north wall , 6 sq ft at east wall, 4 sq ft at south wall in the bathroom located at apt 2f, 2nd story, 3rd apartment from north at east

    Apr 23, 2024 · Apt 2F

    Open — Notice of issuance sent to tenant
  • B

    Remove all obstructions and repair all defects in waste line drain pipe at wash basin in the bathroom located at apt 2f, 2nd story, 3rd apartment from north at east

    Apr 23, 2024 · Apt 2F

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 2f, 2nd story, 3rd apartment from north at east

    Apr 23, 2024 · Apt 2F

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2f, 2nd story, 3rd apartment from north at east

    Apr 23, 2024 · Apt 2F

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 3rd apartment from north at east

    Apr 23, 2024 · Apt 2F

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 3rd apartment from north at east

    Apr 23, 2024 · Apt 2F

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 2f, 2nd story, 3rd apartment from north at east

    Apr 23, 2024 · Apt 2F

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective marble saddle in the bathroom located at apt 2g, 2nd story, 2nd apartment from west at north , section ''east''

    Apr 13, 2024 · Apt 2G

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 2g, 2nd story, 2nd apartment from west at north , section ''east''

    Apr 13, 2024 · Apt 2G

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of bulging and sloping vinyl floor tiles [near bathroom] in the private hallway located at apt 2g, 2nd story, 2nd apartment from west at north , section ''east''

    Apr 13, 2024 · Apt 2G

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from north at west located at apt 2g, 2nd story, 2nd apartment from west at north , section ''east''

    Apr 13, 2024 · Apt 2G

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall and east wall in the 2nd room from north located at apt 2g, 2nd story, 2nd apartment from west at north , section ''east''

    Apr 13, 2024 · Apt 2G

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective sink base cabinet in the kitchen located at apt 2g, 2nd story, 2nd apartment from west at north , section ''east''

    Apr 13, 2024 · Apt 2G

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective door at closet in the foyer located at apt 2g, 2nd story, 2nd apartment from west at north , section ''east''

    Apr 13, 2024 · Apt 2G

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective heavy duty mortise lock and its assembly at door in the entrance located at apt 2g, 2nd story, 2nd apartment from west at north , section ''east''

    Apr 13, 2024 · Apt 2G

    Open — Nov sent out
  • C

    Remove device preventing door from being self-closing kickstand doorstop permanent device installed at door at laundry room at 1st story public hall

    Apr 13, 2024

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hopper chute door at compactor closet at 2nd story public hall

    Apr 13, 2024

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4d, 4th story, 1st apartment from west at north

    Dec 15, 2023 · Apt 4D

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 18, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 18, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 5, 2021

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 6e, 6th story, 2nd apartment from south at west

    Mar 18, 2021 · Apt 6E

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at basement at basement

    Mar 18, 2021

    Closed — Violation dismissed
  • C

    Remove the illegal double cylinder key operated locking device at door at apartment entrance located at apt 5f, 5th story, 3rd apartment from west at north

    Feb 16, 2020 · Apt 5F

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6e, 6th story, 2nd apartment from west at north

    Dec 5, 2019 · Apt 6E

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system boiler room door locked at basement

    Dec 5, 2019

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective entrance door glass at vestibule at public hall, 1st story

    Nov 13, 2019

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective bell/buzzer intercom system in the foyer located at apt 6g, 6th story, 4th apartment from west at north

    Feb 8, 2018 · Apt 6G

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective intercome system at public hall vestibule , 1st story

    Feb 2, 2018

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective bell /buzzer intercom system. in the foyer located at apt 4c, 4th story, 1st apartment from south at west

    Sep 17, 2016 · Apt 4C

    Closed — Violation dismissed
  • A

    § 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder welded shoes at northwest and southwest fire escapes

    May 13, 2016

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective door hindge in the 1st room from north located at apt 4c, 4th story, 1st apartment from south at west

    Jan 31, 2016 · Apt 4C

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchen located at apt 4c, 4th story, 1st apartment from south at west

    Jan 31, 2016 · Apt 4C

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jan 5, 2016

    Closed — Violation dismissed
  • B

    Remove the illegal fastening consisting of key operated lock installed on door leading to the fire escape window in the 1st room from north located at apt 6f, 6th story, 1st apartment from west at north , section at east

    Jan 5, 2016 · Apt 6F

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 6f, 6th story, 1st apartment from west at north , section at east

    Jan 5, 2016 · Apt 6F

    Closed — Violation closed

DOB building violations · 37

  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 19, 2019

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 23, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 18, 2016

    Dob violation - resolved
Show 27 more ↓
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years

    Jun 1, 2015

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 29, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 10, 2014

    Dob violation - resolved
  • Failure to submit eer none

    Failure to submit an energy efficiency report (eer) per ad. code sec. 28-308.4

    Dec 31, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 30, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 30, 2012

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 23, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 8, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 9, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 17, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 3, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 25, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 27, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 5, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 12, 2002

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Feb 19, 2002

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 18, 2002

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 6, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - active
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed
  • Elevator elevatorrequired

    (51) make hoistway doors self closing and latching. (52) provide proper clearence on bedplat selector cable hitting

    Nov 25, 1988

    Dob violation - resolved

ECB violations · 4

  • Non-hazardous

    73r5-cease use working w/o operating permit.

    Feb 24, 1999 · Penalty $1,000

    Resolve
  • Non-hazardous

    08v 50q 58d 75u #50q3 motor wiring #58d6 6fl bracket

    Jan 22, 1999 · Penalty $2,500

    Resolve
  • Non-hazardous

    75u,74t,39y,39o,36t,25o,03o,11x,14m,15t,56m,11x,57o,74m, 74m-provide counter weight guard.

    Jan 23, 1998 · Penalty $350

    Resolve
  • Non-hazardous

    73x. 73 restore elevator service so proper inspection can be made by this dept.

    Aug 13, 1996 · Penalty $100

    Resolve

Complaints

  • Plumbing

    Water supply

    Jul 6, 2026 · Apt BLDG

    Close
  • Water leak

    Slow leak

    Jun 27, 2026 · Apt APT2G

    Close
  • Heat/hot water

    Entire building

    May 4, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 4, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 4, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 3, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Feb 18, 2026 · Apt 2G

    Close
  • Water leak

    Slow leak

    Feb 18, 2026 · Apt 2G

    Close
  • Heat/hot water

    Apartment only

    Feb 18, 2026 · Apt 2G

    Close
  • Heat/hot water

    Entire building

    Jan 28, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Jan 28, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 23, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 22, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 1, 2026 · Apt 5E

    Close
  • Heat/hot water

    Entire building

    Dec 12, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 19, 2025 · Apt 6H

    Close
  • Heat/hot water

    Entire building

    Jul 2, 2025 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jun 24, 2025 · Apt 3D

    Close
  • Heat/hot water

    Entire building

    Apr 11, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 10, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 22, 2025 · Apt 2G

    Close
  • Plumbing

    Water supply

    Mar 22, 2025 · Apt 2G

    Close
  • Plumbing

    Water supply

    Mar 22, 2025 · Apt 2G

    Close
  • Plumbing

    Water supply

    Mar 6, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 5, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 19, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 17, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 21, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 3, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 14, 2024 · Apt BLDG

    Close
  • Plumbing

    Basin/sink

    Apr 19, 2024 · Apt 2F

    Close
  • General

    Cabinet

    Apr 19, 2024 · Apt 2F

    Close
  • Plumbing

    Toilet

    Apr 19, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Apr 19, 2024 · Apt 2F

    Close
  • Plumbing

    Basin/sink

    Apr 19, 2024 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Apr 8, 2024 · Apt 2G

    Close
  • Paint/plaster

    Ceiling

    Apr 8, 2024 · Apt 2G

    Close
  • Flooring/stairs

    Floor

    Apr 8, 2024 · Apt 2G

    Close
  • Unsanitary condition

    Mold

    Apr 8, 2024 · Apt 2G

    Close
  • Paint/plaster

    Wall

    Apr 8, 2024 · Apt 2G

    Close
  • Heat/hot water

    Entire building

    Mar 20, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 20, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 7, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 14, 2023 · Apt BLDG

    Close
  • Appliance

    Electric/gas range

    Nov 17, 2023 · Apt 4D

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1920
Floors
6
Residential units
50
Building area
50,666 ft²
Lot area
11,767 ft²
Zoning
R7-1
Community board
202
Council district
17
Block / lot
2603 / 73
Assessed value
$1,784,250
Landmark / historic district
No

HPD registration #209337, last renewed Jul 29, 2026.

Questions about 588 Timpson Place

Who owns 588 Timpson Place?

The owner of record in NYC Department of City Planning PLUTO data is Timpson Place Associates LLC.

Does 588 Timpson Place have violations?

Yes. NYC HPD has recorded 91 housing violations at this property.

Is 588 Timpson Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 588 Timpson Place built?

City records list 1920 as the year it was built.

How many apartments are in 588 Timpson Place?

It has 50 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.