781 East 133 Street is a factory / industrial built in 1925 in Bronx, 10454. The owner of record is Bldg 780 East 134th Street LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 107
- ECB violations
- 37
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 107
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - dismissed
Show 40 more ↓
- High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 external high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 9, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 7, 2019
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 17, 2017
Dob violation - resolved - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)
Feb 16, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2015
Mar 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2016
Vw*-violation - work w/o permit dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 28, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 28, 2015
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 24, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 24, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 24, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2010 cat 1 insp/tst
Aug 15, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2012
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 17, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 17, 2011
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 21, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 14, 2009
Dob violation - resolved - Emergency none
Egncy-emergency none
Jan 20, 2009
Dob violation - dismissed
ECB violations · 37
- Class - 2
Respondent failed to allow mandatory annual inspection by the department or approved agency per 28-304.6.1 and appendix k of the nycbc. remedy; arrange for inspection by this department by emailing eir@building
Feb 13, 2020 · Penalty $3,125
Active - Class - 1
Cu59l10; 35m07,80m15,77k10,52m15. cease use item; 59l-repair missing parts, notify the dob for restore to service reinspection *35m provideelectrical box cover *80m-provide measurement and tag device,*77k-repa
Apr 9, 2019 · Penalty $1,250
Resolve - Class - 2
05r05 work w/o a permit. a new operator, clutch arm and release rollers was install w/o a permit on an application being filed. rmdy: file and application and obtain a permit for work and schedule test appoint
Mar 21, 2018
Resolve - Class - 2
67x10 repair elevator two-way communication (phone)
Mar 20, 2018 · Penalty $1,562
Resolve - Class - 2
97x10. 97x10-repair/restore to service-device cease used on 06/24/11 one of two freight cars (both) out of service in commercial bldg call for re-inspection 212-566-5544-dob.
Oct 19, 2011 · Penalty $500
Resolve - Class - 2
97x10. 97x10-repair-restore to service so that proper inspection may be performed by dob-one of two freight cars (both out) in commercial bldg call dob for re-inspection 212-566-5544.
Oct 19, 2011 · Penalty $500
Resolve - Class - 2
08v01 16a10 42d06 60l07 61m07 70o02 71m07 72m07 68m07. 08v01-adjust flr stops. 16a10-repair-close all holes in hoistway doors. 42d06-secure timer in controller. 60l07-provide lighting machine room. 61m07-provid
Oct 19, 2011 · Penalty $500
Resolve - Class - 2
97x10)one of 2 fright elevators in bldg is out of service.
Jun 24, 2011 · Penalty $500
Resolve - Class - 1
06n10,21n10,43l10,98u05,99u05,44h10,12q03,21q03,100m07,16l10,40m07.(cu)rear gate switch blocked in c/u street level interlock by-passed.elv run switch hoistway door open.c/u-reverse phase relay.(21q03)2 & 3 flr
Jun 24, 2011 · Penalty $1,000
Resolve - Class - 1
Unlawful acts failure to comply w/an order of the commissioner respondent failed to correct the conditions cited in prior nov #34852605y converted factory space to catering hall use group 9. no applications to
Dec 22, 2010 · Penalty $2,400
Resolve
Show 27 more ↓
- Class - 2
Operation of a pa w/o a current c/o. remedy: obtain a current c/o.
Jun 13, 2010 · Penalty $800
Resolve - Class - 1
Occupancy contrary to that allowed by the c/o or bldg dept records. illegal occupancy on 2nd flr, factory space converted into catering halluse group 9, w/o adequate egress and fire protection. remedy:
Jun 13, 2010 · Penalty $2,400
Resolve - Class - 2
B254/16/32a/46a/20/high pressure boiler nb#15273/50-combustible storage in boiler room, must remove all combustibles.
Apr 16, 2010
Resolve - Class - 2
B254/16/32a/46a/high pressure boiler(steam)nb#16271
Apr 16, 2010
Resolve - Class - 1
Sec.3314.1.1 the permit holder or person directly in charge of any scaffolding equipment shall immediately notify the commissioner followingany accident involving scaffolding equipment.following an incident,no
Nov 4, 2009 · Penalty $1,600
Resolve - Class - 2
Failed to notify dept obtain permit prior to use/inst. off outrigger beams in connection w/suspended scaffold. outriggers on exp #4, #3. remedy:notify the dept.
Nov 4, 2009 · Penalty $400
Resolve - Class - 3
Violating conditions 50a,32a,50b 50a-steam leak on main stop valve. 50b-install permanent fresh air entry louver.
Feb 11, 2009
Resolve - Class - 2
50a-ludell gas fired water heater model dc-9502 not vented to outside of building install flue pipe venting to outside of building to rook. for safe operation.
Feb 11, 2009 · Penalty $500
Active - Class - 1
Failure to maintain building wall(s) or appurtenances. note: concrete lintels spalling and defective willow ave side of building. large chuncks missing from 3r floor. rem: immediately provide protection for pub
Jan 17, 2009 · Penalty $5,000
Resolve - Non-hazardous
48a 48b 50a 50b 50c cyclotherm 1983 natl bl 16192 50a safety valve leaking replace. 50b pipe down glass drain valve. 50c low water cut off leaking.
Dec 21, 2004
Resolve - Non-hazardous
48b 50a 50b 1984 cyclotherm natl bd 16271 50a. low water cut-off leaking 50b. pipe down glass drain valve.
Dec 21, 2004
Resolve - Non-hazardous
18a 18b 50a 50b 1974 cyclotherm natl bd 15273 50a. low water cut off leaking. 50b pipe down glass drain valve.
Dec 21, 2004
Resolve - Non-hazardous
48b 50 1983 n.b. 16180 50 pipe safety valve discharge down 18" from the floor.
Dec 21, 2004
Resolve - Non-hazardous
48ab 50a 50b 50c 50d 50e cyclotherm ftsm hp steam bcr nb16192 2070hr gas 1983 50a missing stap valve on steam outlet piping 50b steam pressure gauge dial is 0-200psi boiler safety valve 50b steam pressure gauge
Jan 28, 2004
Resolve - Non-hazardous
50a 50b cyclotherm ftsm boiler nb15963 gas 1981 50a missing secondary blowdown valve on the blr 50b no discharge pipe on the safety valve
Jan 28, 2004
Resolve - Non-hazardous
50a 50b cyclotherm ftsm hp steam boiler nb 16180 gas 1983 50a the steam pressure gauge has a dial range of 0-200 psi a 0-300 psi gauge is required for code compliance 50b no hanger structural support on the flu
Jan 28, 2004
Resolve - Non-hazardous
48ab 50a 50b cyclotherm ftsm hlp steam boiler nb 15772 gas 1979 50a steam pressure gauge has a dial range of 0-200 psi a 0-300 psi pressure gauge is required for code compliance 50b no hanger structural support
Jan 28, 2004
Resolve - Non-hazardous
48ab 50a 50b 32a cyclotherm ftsm hp steam boiler nb 16184 gas fired 1983 50a steam pressure gauge dial range is 0-200 psi a 0 300 psi gauge is required for code compriance 50b no hanger structure support on the
Jan 28, 2004 · Penalty $180
Resolve - Non-hazardous
50a 50b 50c 50d cyclotherm fistm hlp stm blr nb 15273,2070 gas 1974 50a the steam pressure gauge has a dial range of 0-200281 the safety valve is set at 150psi 0-300 psi pressure gauge is required for code comp
Jan 28, 2004
Resolve - Non-hazardous
6a 50a 48b 25ab 50b 50c 50d cyclotherm ftsm hp steam boiler nb16271 gas fired 1984 50a steam pressure gauge dial range is 0-200 boiler required a replacement gauge 0-30 leaking safety valve 50b singre corroded
Jan 28, 2004
Resolve - Non-hazardous
Failure to provide 10'x12' elevator landings on all floors. failure to provide 3' number in stairway on each floor. failure to provide 3' letter stair and elevator i.d. on each floor. remedy: provide signage as
Jun 13, 2002 · Penalty $600
Resolve - Non-hazardous
50y62m54q53x46h18q3o31r11q3a57o30o35x 32-clean car top 35-removed hanging wire over braker in motor room 62-replace to guard elevator 54-brake box cover missing.
Jan 13, 1998 · Penalty $350
Resolve - Hazardous
18i,18r,52a,36d,2x,1x,57o,11q,15r,14i, 18-cease use inerlock jump out and hoistway gate not secure call for reinspection 312-8732 52-exposed brake wiring.
Jan 7, 1998
Resolve - Non-hazardous
46h,47h,73x,73x,75u,-put elevator back in service to inspection by d.o.b
Jan 7, 1998
Resolve - Non-hazardous
73x. restore elevator to service so a proper inspection can be made.
Jan 27, 1995
Resolve - Non-hazardous
15b. replace street level door. (hoistway)
Jan 27, 1995
Resolve - Hazardous
Failure to maintain exterior building. defect is: sections of concrete lintel have fallen to street from third floor. remedy: provide immediate protection to pedestrian traffic. provide engineer report attestin
Feb 18, 1993
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Factory / industrial (F5)
- Year built
- 1925
- Floors
- 6
- Residential units
- —
- Building area
- 143,570 ft²
- Lot area
- 49,037 ft²
- Zoning
- M1-2
- Community board
- 201
- Council district
- 8
- Block / lot
- 2585 / 1
- Assessed value
- $4,788,900
- Landmark / historic district
- No
Questions about 781 East 133 Street
Who owns 781 East 133 Street?
The owner of record in NYC Department of City Planning PLUTO data is Bldg 780 East 134th Street LLC.
Does 781 East 133 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 781 East 133 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 781 East 133 Street built?
City records list 1925 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.