roofy

1029 College Avenue

Bronx, NY 10456BBL 2-02437-0034Map

Owner of record: 1029 Collg. Av LLC.

1029 College Avenue is a walk-up apartment building built in 1920 in Bronx, 10456. It has 3 residential units across 3 floors. The owner of record is 1029 Collg. Av LLC.. HPD has recorded 32 housing violations here, most recently on April 30, 2026. 12 of the 32 most recent violations are still open.

HPD violations
32
DOB violations
1
ECB violations
5
HPD complaints
27

What to know

Concern
9 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 30, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 32

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 30, 2026

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Apr 1, 2026 · Apt 2

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Apr 1, 2026 · Apt 2

    Closed — Violation dismissed
  • C

    Provide a safe and adequate supply of electric service to the fixtures at ceiling,outlets and wall switches through-out in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Apr 1, 2026 · Apt 2

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 4, 2025

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Mar 17, 2023 · Apt 2

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). aditional required in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Mar 17, 2023 · Apt 2

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Mar 17, 2023 · Apt 2

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector aditional required in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Mar 17, 2023 · Apt 2

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 8, wg to replace = 0, wg to repair = 2 in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Mar 17, 2023 · Apt 2

    Closed — Violation closed
Show 22 more ↓
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Mar 17, 2023 · Apt 2

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2, 2nd story, 1st apartment from south at west

    Mar 17, 2023 · Apt 2

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 6th room from east at north located at apt 2, 2nd story, 1st apartment from south at west

    Mar 17, 2023 · Apt 2

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 2nd window frame from south at west wall, wainscotting at west wall in the 6th room from east at north located at apt 2, 2nd story, 1st apartment from south at west

    Mar 17, 2023 · Apt 2

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the 6th room from east at north located at apt 2, 2nd story, 1st apartment from south at west

    Mar 17, 2023 · Apt 2

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from south at west

    Mar 17, 2023 · Apt 2

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from south at west

    Mar 17, 2023 · Apt 2

    Closed — Violation dismissed
  • C

    Properly repair and abate unsafe electric wiring condition consisting of exposed wiring at outlet at east wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from south at west

    Mar 17, 2023 · Apt 2

    Open — Nov sent out
  • C

    Properly repair and abate unsafe electric wiring condition consisting of exposed wiring at outlet at west wall in the 6th room from east at north located at apt 2, 2nd story, 1st apartment from south at west

    Mar 17, 2023 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Mar 17, 2023 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall in the private hallway located at apt 2, 2nd story, 1st apartment from south at west

    Mar 17, 2023 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 6th room from east at north located at apt 2, 2nd story, 1st apartment from south at west

    Mar 17, 2023 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall, south wall, east wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from south at west

    Mar 17, 2023 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, 1st window frame from north at east wall in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from south at west

    Mar 17, 2023 · Apt 2

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 16, 2023

    Closed — Violation dismissed
  • B

    § 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition 3 family multiple dwelling illegally converted to 4 family by adding an additional class ''a'' apartment at west in the basement

    Feb 17, 2022

    Open — Invalid certification
  • B

    Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections at kitchen and bathroom at illegal apartment created west in the basement

    Feb 17, 2022

    Open — Invalid certification
  • B

    Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible, gas range installed in kitchen of illegal apartment created at west in the basement

    Feb 17, 2022

    Open — Invalid certification
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 17, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 25, 2019

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Feb 26, 2009

    Open — Nov sent out

DOB building violations · 1

  • Construction other optional

    W/o a permit. noted: at cellar level - full height partition walls erected, created a bthrm, 3 bdrms, closets & storage rm. water & waste lines installed for 3 pc bthrm (toilet, sink, tub); residential sink at kitchen area. gas line installed for stove. electrical wiring installed for lights & outlets.

    Nov 1, 2019

    Dob violation - dismissed

ECB violations · 5

  • Class - 2

    Occupancy in contrary to that allows by c/o and/or building departmentof record. illegal apartment created at basement, full kitchen and bathroom. 2nd means of egress present. remedy:discontinue the illegal use

    Feb 17, 2022

    Resolve
  • Class - 2

    Residence converted from 3 to 4 family. noted: at cellar level -created & set-up as a class 'a' apt, occupied as 3 b-units/sro's with 3 pc bthrm; kitchen with gas stove & residential sink. (front room w/o natur

    Nov 1, 2019 · Penalty $5,000

    Resolve
  • Class - 1

    Work without a permit.violating conditions are as follows.at the cellar full height partitions 1 bedroom observed at time of inspection.two doors in rear locked.kitchen area and 3 piece bathroom(gas stove)no pe

    Dec 20, 2016

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner.violating conditions are as follows.at exterior staircase leading to cellar exposure #1 approx. 2 1/2"-3" masonary curb at first step creating a hazard to

    Dec 20, 2016 · Penalty $1,000

    Resolve
  • Hazardous

    Occupancy contrary to that allowed by certificate of occupancy or bldg dept. records . first story apartment converted into single room occupancy, four 4 seperate room community kitchen and bathroom

    Sep 16, 1999 · Penalty $800

    Resolve

Complaints

  • Electric

    Power outage

    Mar 31, 2026 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Mar 12, 2023 · Apt 2NDFLR

    Close
  • Flooring/stairs

    Floor

    Mar 8, 2023 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Mar 8, 2023 · Apt 2

    Close
  • Paint/plaster

    Wall

    Mar 8, 2023 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Dec 30, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 4, 2022 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Nov 29, 2022 · Apt 2FLOOR

    Close
  • Water leak

    Heavy flow

    Feb 14, 2022 · Apt BSMNT

    Close
  • Door/window

    Window frame

    Feb 14, 2022 · Apt BSMNT

    Close
Show 17 more ↓
  • Unsanitary condition

    Sewage

    Feb 14, 2022 · Apt BSMNT

    Close
  • Unsanitary condition

    Sewage

    Feb 14, 2022 · Apt BSMT

    Close
  • Plumbing

    Radiator

    Feb 14, 2022 · Apt BSMT

    Close
  • Plumbing

    Water supply

    Feb 14, 2022 · Apt BSMT

    Close
  • Plumbing

    Toilet

    Feb 14, 2022 · Apt BSMT

    Close
  • Water leak

    Heavy flow

    Feb 9, 2022 · Apt BASEME

    Close
  • Unsanitary condition

    Sewage

    Feb 4, 2022 · Apt BASEME

    Close
  • Unsanitary condition

    Sewage

    Feb 4, 2022 · Apt BASEME

    Close
  • Heat/hot water

    Apartment only

    Nov 18, 2020 · Apt 2

    Close
  • Heating

    Heat related

    Nov 15, 2012 · Apt 1

    Close
  • Heating

    Heat related

    Nov 8, 2012 · Apt 1FL

    Close
  • Heating

    Heat related

    Apr 4, 2011 · Apt BLDG

    Close
  • Heating

    Heat related

    Mar 29, 2011 · Apt 1

    Close
  • Heating

    Heat related

    Mar 2, 2009 · Apt 3

    Close
  • Heating

    Heat related

    Feb 23, 2009 · Apt 3

    Close
  • Nonconst

    Rubbish

    May 28, 2008 · Apt BASEM

    Close
  • Heating

    Heat related

    Jan 25, 2008 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1920
Floors
3
Residential units
3
Building area
3,708 ft²
Lot area
2,031 ft²
Zoning
R7-1
Community board
204
Council district
16
Block / lot
2437 / 34
Assessed value
$69,480
Landmark / historic district
No

HPD registration #205542, last renewed Jul 1, 2025.

Questions about 1029 College Avenue

Who owns 1029 College Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 1029 Collg. Av LLC..

Does 1029 College Avenue have violations?

Yes. NYC HPD has recorded 32 housing violations at this property.

Is 1029 College Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1029 College Avenue built?

City records list 1920 as the year it was built.

How many apartments are in 1029 College Avenue?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.