318 East 160 Street
Bronx, NY 10451BBL 2-02419-0012Map
Owner of record: 318 E160th LLC
318 East 160 Street is a walk-up apartment building built in 1931 in Bronx, 10451. It has 10 residential units across 4 floors. The owner of record is 318 E160th LLC. HPD has recorded 132 housing violations here, most recently on April 2, 2026. 5 of the 50 most recent violations are still open.
- HPD violations
- 132
- DOB violations
- 14
- ECB violations
- 0
- HPD complaints
- 233
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 132
- BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north located at apt 1e, 1st story, 1st apartment from north at east
Apr 2, 2026 · Apt 1E
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from north located at apt 1e, 1st story, 1st apartment from north at east
Apr 2, 2026 · Apt 1E
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1e, 1st story, 1st apartment from north at east
Apr 2, 2026 · Apt 1E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroom located at apt 1e, 1st story, 1st apartment from north at east
Apr 2, 2026 · Apt 1E
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 1st room from north located at apt 8, 4th story, 1st apartment from south at west
Jul 16, 2025 · Apt 8
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower sash at fire escape window in the 1st room from north located at apt 8, 4th story, 1st apartment from south at west
Jul 16, 2025 · Apt 8
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 4th story
Jul 16, 2025
Closed — Violation closed - ANon-hazardous
Repair the leaky and/or defective faucets diverter valve at bathtub in the bathroom located at apt 8, 4th story, 1st apartment from south at west
Jul 16, 2025 · Apt 8
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 8, 4th story, 1st apartment from south at west
Jul 16, 2025 · Apt 8
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). that is defective in the entire apartment located at apt 8, 4th story, 1st apartment from south at west
Jul 16, 2025 · Apt 8
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair or replace the smoke detector that is defective in the entire apartment located at apt 8, 4th story, 1st apartment from south at west
Jul 16, 2025 · Apt 8
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch at fire escape window gate in the 1st room from north located at apt 8, 4th story, 1st apartment from south at west
Jul 16, 2025 · Apt 8
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 4th story
Jul 16, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 4th story
Jul 16, 2025
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of consisting of household items at public hall, 4th story
Jul 16, 2025
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective holes in metal cornice at parapet in building front at cornice
Oct 31, 2024
Closed — Violation dismissed - BHazardous
Provide upper and lower wire screen at skylight at bulkhead , 4th story
Oct 2, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling at public hall, 3rd story
Oct 2, 2024
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items (tottes, boxes & clothes) at bulkhead , 4th story
Oct 2, 2024
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of garbage cans (impeding drop ladder) at (north exterior wall) building front , 4th story
Oct 2, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective brick and mortar (vertical crack) at 2nd window from east at north exterior wall , 4th story
Oct 2, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at bulkhead door leading to roof , 4th story
Oct 2, 2024
Closed — Violation closed - BHazardous
Remove the illegal fastening at building entrance door mortise lock with dead lockable bolt installed on door at public hall, 1st story
Sep 12, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door at public hall, 1st story
Sep 12, 2024
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at all electrical fixtures and outlet in the entire apartment located at apt 5, 3rd story
Sep 12, 2024 · Apt 5
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls in the bathroom located at apt 5, 3rd story, 1st apartment from north at east
Jun 12, 2024 · Apt 5
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jun 12, 2024
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5, 3rd story, 1st apartment from north at east
Jun 12, 2024 · Apt 5
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective locking device at building entrance door , 1st story
Mar 7, 2024
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling , 4th story
Mar 5, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide heavy duty lockset and assembly , 1st story
Mar 5, 2024
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at building entrance door , 1st story
Mar 5, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling , 4th story
Mar 5, 2024
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the bathroom located at apt 5, 3rd story, 1st apartment from north at east
Jan 30, 2024 · Apt 5
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north located at apt 5, 3rd story, 1st apartment from north at east
Jan 30, 2024 · Apt 5
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection at radiator shut-off valve in the 1st room from north located at apt 5, 3rd story, 1st apartment from north at east
Jan 30, 2024 · Apt 5
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchen located at apt 5, 3rd story, 1st apartment from north at east
Jan 30, 2024 · Apt 5
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system boiler room locked at boiler room
Jan 7, 2024
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the 3rd room from north located at apt 3, 2nd story, 1st apartment from east at south
Jan 7, 2024 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 3rd room from north located at apt 3, 2nd story, 1st apartment from east at south
Jan 7, 2024 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 14, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 8, 4th story, 1st apartment from south at west
Dec 14, 2023 · Apt 8
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 4th story
Oct 12, 2023
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceiling with fire retardant material at public hall, 4th story
Oct 12, 2023
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 4th story
Oct 12, 2023
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling over bulkhead in the public hall bulkhead located at roof
Sep 27, 2023
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of consisting of household items at public hall, 4th story
Sep 27, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system lock door at boiler room
Sep 27, 2023
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling above and around roof bulkhead door in the public hall bulkhead located at roof
Sep 27, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retarded material at ceiling roof bulk head in the public hall bulkhead located at roof
Sep 27, 2023
Closed — Violation dismissed
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed
Show 4 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Water leak
Heavy flow
Mar 31, 2026 · Apt 1E
Close - Paint/plaster
Ceiling
Mar 31, 2026 · Apt 1E
Close - Unsanitary condition
Mold
Mar 31, 2026 · Apt 1E
Close - Water leak
Heavy flow
Mar 29, 2026 · Apt 1E
Close - Water leak
Heavy flow
Mar 27, 2026 · Apt 1E
Close - Unsanitary condition
Mold
Mar 27, 2026 · Apt 1E
Close - Heat/hot water
Entire building
Mar 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 3, 2026 · Apt BLDG
Close
Show 40 more ↓
- Electric
No lighting
Feb 12, 2026 · Apt 5
Close - Heat/hot water
Apartment only
Oct 23, 2025 · Apt 5
Close - Paint/plaster
Ceiling
Jul 15, 2025 · Apt 8
Close - Water leak
Slow leak
Jul 15, 2025 · Apt 8
Close - Plumbing
Bathtub/shower
Jul 15, 2025 · Apt 8
Close - Heat/hot water
Entire building
May 24, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 14, 2025 · Apt 8
Close - Heat/hot water
Apartment only
Apr 12, 2025 · Apt 8
Close - Heat/hot water
Apartment only
Apr 11, 2025 · Apt 8
Close - Heat/hot water
Entire building
Dec 19, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 10, 2024 · Apt 5
Close - Heat/hot water
Entire building
Dec 1, 2024 · Apt 5
Close - Heat/hot water
Entire building
Dec 1, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 30, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2024 · Apt BLDG
Close - Electric
No lighting
Nov 4, 2024 · Apt BLDG
Close - Electric
Power outage
Oct 29, 2024 · Apt 5
Close - Plumbing
Bathtub/shower
Oct 29, 2024 · Apt 5
Close - Appliance
Electric/gas range
Oct 29, 2024 · Apt 5
Close - Appliance
Electric/gas range
Oct 16, 2024 · Apt 5
Close - Electric
No lighting
Oct 16, 2024 · Apt 4FLOOR
Close - Heat/hot water
Entire building
Oct 16, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 15, 2024 · Apt BLDG
Close - Electric
No lighting
Oct 15, 2024 · Apt 5
Close - Electric
No lighting
Oct 15, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 4, 2024 · Apt BLDG
Close - Electric
Power outage
Oct 1, 2024 · Apt BLDG
Close - Electric
Power outage
Sep 9, 2024 · Apt 5
Close - Heat/hot water
Entire building
Jun 11, 2024 · Apt BLDG
Close - Electric
No lighting
May 14, 2024 · Apt 2NDFLO
Close - Plumbing
Steam pipe/riser
Jan 29, 2024 · Apt 5
Close - Plumbing
Radiator
Jan 29, 2024 · Apt 5
Close - Plumbing
Basin/sink
Jan 29, 2024 · Apt 5
Close - Heat/hot water
Entire building
Jan 7, 2024 · Apt 8
Close - Heat/hot water
Entire building
Jan 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2023 · Apt 8
Close - Heat/hot water
Entire building
Dec 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 10, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 10, 2023 · Apt 8
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 4
- Residential units
- 10
- Building area
- 6,060 ft²
- Lot area
- 2,475 ft²
- Zoning
- R7-2
- Community board
- 203
- Council district
- 17
- Block / lot
- 2419 / 12
- Assessed value
- $517,500
- Landmark / historic district
- No
HPD registration #220402, last renewed Sep 23, 2025.
Questions about 318 East 160 Street
Who owns 318 East 160 Street?
The owner of record in NYC Department of City Planning PLUTO data is 318 E160th LLC.
Does 318 East 160 Street have violations?
Yes. NYC HPD has recorded 132 housing violations at this property.
Is 318 East 160 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 318 East 160 Street built?
City records list 1931 as the year it was built.
How many apartments are in 318 East 160 Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.