373 East 157 Street
Bronx, NY 10451BBL 2-02404-0033Map
Owner of record: 373 Cross Park LLC
373 East 157 Street is a walk-up apartment building built in 1899 in Bronx, 10451. It has 10 residential units across 3 floors. The owner of record is 373 Cross Park LLC. HPD has recorded 13 housing violations here, most recently on June 17, 2026. 1 of the 13 most recent violations are still open.
- HPD violations
- 13
- DOB violations
- 1
- ECB violations
- 6
- HPD complaints
- 52
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 13
- ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 17, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 3, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2023
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective bell and buzzer system from first storypublic hall to apt 2 in the entrance located at apt 2, 2nd story, 2nd apartment from south at west
Dec 23, 2020 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color all ceilings and all walls in the entire apartment located at apt 2, 2nd story, 2nd apartment from south at west
Dec 23, 2020 · Apt 2
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 2nd apartment from south at west
Dec 23, 2020 · Apt 2
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 2, 2nd story, 2nd apartment from south at west
Dec 23, 2020 · Apt 2
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Aug 2, 2016
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective 3 inches vertical crack opening at exterior wall at chimney fron 1st story to roof at west yard
Jul 27, 2016
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, apartment at west
Nov 20, 2013 · Apt 2
Closed — Violation dismissed
Show 3 more ↓
- BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story
Nov 20, 2013 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of scalding hot water 150 degrees in the kitchen located at apt 2, 2nd story, apartment at west
Nov 20, 2013 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of double key operating cylinder on gate in building entrance at front areaway
Nov 20, 2013
Closed — Violation closed
DOB building violations · 1
- Unsafe buildings none
Ub-unsafe buildings none
Jun 14, 2000
V%*-dob violation - dismissed
ECB violations · 6
- Class - 2
Observed shoring installed on multiple locations throughout jobsite to brace structure during demolition operations. reviewed dob approved drawings for the shoring details, drawings showed no shoring @ expo 4 i
Feb 12, 2025
Resolve - Class - 2
Observed cold form steel installed rear side of jobsite on 1st & 2nd floor. upon review of dob approved structural drawings, cold form steel blocking and strapping not installed as per drawing details. solid b
Feb 12, 2025
Resolve - Class - 2
Observed active alteration jobsite during demolition operations. adjacent property @ expo 2&4 windows where not protected as per 3309.14 protection of windows, where windows facing within 20 ft of construction
Feb 12, 2025 · Penalty $2,500
Resolve - Class - 2
Bc 3301.6.1 manufacturer specifications. observed cold form steel installed for structural vertical and horizontal extension @ expo4 rear side of jobsite. asked workers for the manufacture specifications for th
Feb 12, 2025 · Penalty $1,250
Resolve - Class - 2
@ the time of inspection observed 2 stories alt building request en plans not provided ., maintain/display required documents; maint en plans on site.https://www1.nyc.gov/site/buildings/codes/energy
Feb 10, 2025 · Penalty $1,250
Resolve - Class - 2
Work w/o a permit. observed at time of inspection in cellar of location 1 residential stove, 1 kitchen sink (rough), 1 toilet, 1 shower stall and 1 basin installed w/o a permit or records w/this dept. remedy:
Feb 21, 2012 · Penalty $4,000
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Apr 16, 2026 · Apt 2C
Close - General
Janitor/super
Apr 16, 2026 · Apt 2C
Close - Unsanitary condition
Garbage/recycling storage
Mar 24, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 23, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 17, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Dec 22, 2020 · Apt 1
Close - Unsanitary condition
Pests
Dec 22, 2020 · Apt 1
Close - Door/window
Window frame
Dec 22, 2020 · Apt 1
Close - Unsanitary condition
Pests
Dec 22, 2020 · Apt 1
Close - Water leak
Damp spot
Dec 22, 2020 · Apt 1
Close
Show 40 more ↓
- Unsanitary condition
Pests
Dec 22, 2020 · Apt 2
Close - Paint/plaster
Ceiling
Dec 22, 2020 · Apt 2
Close - Paint/plaster
Ceiling
Dec 22, 2020 · Apt 2
Close - Paint/plaster
Ceiling
Dec 22, 2020 · Apt 2
Close - Water leak
Slow leak
Dec 22, 2020 · Apt 2
Close - Paint/plaster
Wall
Dec 22, 2020 · Apt 2
Close - General
Bell/buzzer/intercom
Dec 22, 2020 · Apt 2
Close - Unsanitary condition
Mold
Dec 22, 2020 · Apt 2
Close - Heating
Heat related
Nov 12, 2013 · Apt 2
Close - Heating
Heat related
Feb 20, 2013 · Apt NA
Close - Heating
Heat related
Dec 22, 2012 · Apt 1
Close - Heating
Heat related
Nov 16, 2012 · Apt NA
Close - Heating
Heat related
Nov 8, 2012 · Apt NA
Close - Heating
Heat related
Feb 25, 2012 · Apt 2FL
Close - Plumbing
Water-leaks
Feb 20, 2012 · Apt 2FL
Close - General
Mailbox
Feb 20, 2012 · Apt 2FL
Close - General
Mold
Feb 20, 2012 · Apt 2FL
Close - Plumbing
Water-leaks
Feb 20, 2012 · Apt 2FL
Close - General
Floor
Feb 20, 2012 · Apt 2FL
Close - General
Mold
Feb 20, 2012 · Apt 2FL
Close - Nonconst
Vermin
Feb 20, 2012 · Apt 2FL
Close - Nonconst
Vermin
Feb 20, 2012 · Apt 2FL
Close - Nonconst
Vermin
Feb 20, 2012 · Apt 2FL
Close - Heating
Heat related
Feb 20, 2012 · Apt 2FL
Close - General
Floor
Feb 20, 2012 · Apt 2FL
Close - Appliance
Electric/gas range
Feb 20, 2012 · Apt 2FL
Close - General
Window guards
Feb 20, 2012 · Apt 2FL
Close - General
Windows
Feb 20, 2012 · Apt 2FL
Close - General
Floor
Feb 20, 2012 · Apt 2FL
Close - General
Floor
Feb 20, 2012 · Apt 2FL
Close - General
Stairs
Feb 20, 2012 · Apt 2FL
Close - Electric
Bell-buzzer/intercom
Feb 20, 2012 · Apt 2FL
Close - General
Mold
Feb 20, 2012 · Apt 2FL
Close - General
Stairs
Feb 19, 2012 · Apt BLDG
Close - General
Mold
Jan 6, 2011 · Apt 2FL
Close - Heating
Heat related
Jan 6, 2011 · Apt 2FL
Close - Plumbing
Radiator
Dec 23, 2010 · Apt 2FL
Close - Heating
Heat related
Dec 23, 2010 · Apt 2FL
Close - Heating
Heat related
Dec 12, 2010 · Apt 2FL
Close - Heating
Heat related
Dec 7, 2010 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1899
- Floors
- 3
- Residential units
- 10
- Building area
- 4,640 ft²
- Lot area
- 2,493 ft²
- Zoning
- R7-2
- Community board
- 201
- Council district
- 17
- Block / lot
- 2404 / 33
- Assessed value
- $278,100
- Landmark / historic district
- No
HPD registration #714729, last renewed Jun 6, 2025.
Questions about 373 East 157 Street
Who owns 373 East 157 Street?
The owner of record in NYC Department of City Planning PLUTO data is 373 Cross Park LLC.
Does 373 East 157 Street have violations?
Yes. NYC HPD has recorded 13 housing violations at this property.
Is 373 East 157 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 373 East 157 Street built?
City records list 1899 as the year it was built.
How many apartments are in 373 East 157 Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.