425 East 153 Street
Bronx, NY 10455BBL 2-02375-0029Map
Owner of record: 425 East 153 Street HDFC
425 East 153 Street is a walk-up apartment building built in 1912 in Bronx, 10455. It has 25 residential units across 5 floors. The owner of record is 425 East 153 Street HDFC. HPD has recorded 258 housing violations here, most recently on July 17, 2026. 44 of the 50 most recent violations are still open.
- HPD violations
- 258
- DOB violations
- 11
- ECB violations
- 5
- HPD complaints
- 263
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 258
- BHazardous
Remove all encumbrances consisting of flower pots at 2nd, 3rd and 4th story at rear at fire escape
Jul 17, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Jul 17, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Jul 17, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color approx 4 sqft at west wall in the 2nd room from east located at apt 4b, 4th story, 1st apartment from north at east
Jul 17, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4a, 4th story, 2nd apartment from north at east
Jul 17, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4a, 4th story, 2nd apartment from north at east
Jul 17, 2026 · Apt 4A
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling and walls in the bathroom located at apt 4e, 4th story, 1st apartment from west at north
Jul 17, 2026 · Apt 4E
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the bathroom located at apt 4a, 4th story, 2nd apartment from north at east
Jul 17, 2026 · Apt 4A
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of plexi glass pane at entrance door , 1st story
Jul 17, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from east located at apt 4b, 4th story, 2nd apartment from west at north
Dec 26, 2025 · Apt 4B
Open — Not complied with - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 2b, 1st story, 2nd apartment from east at south
Jul 20, 2025 · Apt 2B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 2b, 1st story, 2nd apartment from east at south
Jul 20, 2025 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower sash at fire escape window at south wall in the 3rd room from north at west located at apt 2b, 1st story, 2nd apartment from east at south
Jul 20, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2b, 1st story, 2nd apartment from east at south
Jul 20, 2025 · Apt 2B
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective decorative metal cornice at parapet wall at roof , building front.
Jul 16, 2025
Open — Not complied with - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 5e, 5th story, 1st apartment from west at north
May 3, 2025 · Apt 5E
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south wall, west wall, east wall in the 1st room from north located at apt 5e, 5th story, 1st apartment from west at north
May 3, 2025 · Apt 5E
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation east radiator in the 1st room from north located at apt 5e, 5th story, 1st apartment from west at north
May 3, 2025 · Apt 5E
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation radiator at west in the 2nd room from north at east located at apt 5e, 5th story, 1st apartment from west at north
May 3, 2025 · Apt 5E
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 5e, 5th story, 1st apartment from west at north
May 3, 2025 · Apt 5E
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 5e, 5th story, 1st apartment from west at north
May 3, 2025 · Apt 5E
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 5a, 5th story, 2nd apartment from east at south
Feb 11, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5a, 5th story, 2nd apartment from east at south
Feb 11, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south
Feb 11, 2025 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Feb 7, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vynil floor tiles in the kitchen located at apt 5e, 5th story, 1st apartment from west at north
Feb 7, 2025 · Apt 5E
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 7, 2025
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective latch at roof door at 1st public hall bulkhead from north, 5th story
Feb 7, 2025
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at roof door at 1st public hall bulkhead from north, 5th story
Feb 7, 2025
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 7, 2025
Open — Not complied with - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5e, 5th story, 1st apartment from west at north
Feb 7, 2025 · Apt 5E
Open — Nov certified late - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5e, 5th story, 1st apartment from west at north
Feb 7, 2025 · Apt 5E
Open — Nov certified late - BHazardous
Repair the roof so that it will not leak above the ceiling at 1st public hall bulkhead from north, 5th story
Nov 28, 2024
Open — Not complied with - BHazardous
Provide an unlockable slidebolt or hook on roof door that allows re-entry from roof to public hall at 1st public hall bulkhead from north, 5th story
Nov 28, 2024
Open — Not complied with - CImmediately hazardous
Remove the illegal fastening consisting of a panic bar i installed at roof door that does not allow re-entry from roof to public hall at 1st public hall bulkhead from north, 5th story
Nov 28, 2024
Open — Not complied with - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Nov 28, 2024
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 5b, 5th story, 1st apartment from east at south
Nov 28, 2024 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective (latch) at apartment door in the entrance located at apt 5e, 5th story, 1st apartment from west at north
Nov 18, 2024 · Apt 5E
Closed — Violation closed - ANon-hazardous
Post, in the form approved by the commissioner, and maintain the notice about prevention, detection and removal of bedbug infestation required by §27-2018.1 in common area of the building or provide to each tenant, according to the certification made on such annual bedbug report.
Nov 18, 2024
Open — Not complied with - ANon-hazardous
Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided. at public hall, 1st story
Nov 18, 2024
Open — Not complied with - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Nov 18, 2024
Open — Not complied with - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq. ft at ceiling in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south original violation 17427265 issued 18-nov-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Nov 18, 2024 · Apt 5A
Open — First no access to re- inspect violation - BHazardous
Repair or replace the carbon monoxide detecting device(s). that is missing in the entire apartment located at apt 5e, 5th story, 1st apartment from west at north
Nov 18, 2024 · Apt 5E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mortise lock and assembly at apartment door in the entrance located at apt 5e, 5th story, 1st apartment from west at north
Nov 18, 2024 · Apt 5E
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 5e, 5th story, 1st apartment from west at north
Nov 18, 2024 · Apt 5E
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Nov 18, 2024
Open — Not complied with - BHazardous
M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 4th room from north at east located at apt 5a, 5th story, 2nd apartment from east at south
Nov 18, 2024 · Apt 5A
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). that is missing in the entire apartment located at apt 5a, 5th story, 2nd apartment from east at south
Nov 18, 2024 · Apt 5A
Open — Nov sent out - BHazardous
Repair or replace the smoke detector that is defective in the entire apartment located at apt 5a, 5th story, 2nd apartment from east at south
Nov 18, 2024 · Apt 5A
Open — Nov sent out
DOB building violations · 11
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 5
- Class - 2
Failure to comply w/the comm's order contained in summons/vio#35163688l issued on 12-22-17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for collapsed ceiling in apt#4b. remedy: comply w/comm's order
Mar 3, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35407147r issued on 07/18/19 and to file a certificate of correction pursuant to 28-201.1 and 1 rcny 102-01.remedy:comply with comm
Jan 3, 2020 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35407147r issued on 07-18-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner. remedy: comp
Nov 15, 2019 · Penalty $5,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35407147r issued on 07-18-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Oct 4, 2019
Resolve - Class - 1
Failure to maintain. at the time of inspection of the above address on the above date it was observed that a 2'x3' section of the plaster ceiling collapsed in the apt and struck the female tenant in the apt. re
Jul 18, 2019 · Penalty $6,250
Active
Complaints
- Heat/hot water
Entire building
Dec 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt 5E
Close - Paint/plaster
Wall
Oct 9, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Jul 19, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 19, 2025 · Apt 5E
Close - Heat/hot water
Entire building
Jul 18, 2025 · Apt 2B
Close - Water leak
Heavy flow
May 22, 2025 · Apt 2D
Close - Water leak
Damp spot
May 22, 2025 · Apt 2D
Close - Electric
Outlet/switch
May 1, 2025 · Apt 5E
Close - Flooring/stairs
Floor
May 1, 2025 · Apt 5E
Close
Show 40 more ↓
- Heat/hot water
Entire building
May 1, 2025 · Apt 5E
Close - Unsanitary condition
Pests
May 1, 2025 · Apt 5E
Close - Unsanitary condition
Pests
May 1, 2025 · Apt 5E
Close - Water leak
Heavy flow
May 1, 2025 · Apt 5E
Close - Unsanitary condition
Mold
May 1, 2025 · Apt 5E
Close - Heat/hot water
Entire building
Feb 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 27, 2024 · Apt 5E
Close - Heat/hot water
Entire building
Nov 23, 2024 · Apt 2D
Close - Heat/hot water
Entire building
Nov 16, 2024 · Apt 5E
Close - Heat/hot water
Entire building
Nov 14, 2024 · Apt 5E
Close - Heat/hot water
Entire building
Nov 13, 2024 · Apt 4E
Close - Heat/hot water
Entire building
Nov 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 12, 2024 · Apt BLDG
Close - Paint/plaster
Ceiling
Jul 10, 2024 · Apt 5B
Close - Paint/plaster
Ceiling
Jul 10, 2024 · Apt 5B
Close - Heat/hot water
Apartment only
May 23, 2024 · Apt 5E
Close - Water leak
Heavy flow
Apr 3, 2024 · Apt 5FL
Close - Heat/hot water
Entire building
Apr 3, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 11, 2024 · Apt 5E
Close - Heat/hot water
Apartment only
Mar 9, 2024 · Apt 5E
Close - Heat/hot water
Entire building
Mar 8, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 31, 2024 · Apt 5E
Close - Heat/hot water
Entire building
Jan 30, 2024 · Apt BLDG
Close - Paint/plaster
Ceiling
Jan 19, 2024 · Apt 5E
Close - Door/window
Window frame
Jan 19, 2024 · Apt 5E
Close - Water leak
Heavy flow
Jan 19, 2024 · Apt 5E
Close - Paint/plaster
Wall
Jan 19, 2024 · Apt 5E
Close - Unsanitary condition
Mold
Jan 19, 2024 · Apt 5E
Close - Heat/hot water
Apartment only
Jan 19, 2024 · Apt 5E
Close - Heat/hot water
Entire building
Jan 5, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 5, 2024 · Apt 2D
Close - Heat/hot water
Apartment only
Jan 5, 2024 · Apt 5E
Close - Heat/hot water
Entire building
Jan 2, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2024 · Apt 5B
Close - Heat/hot water
Entire building
Jan 1, 2024 · Apt 5E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1912
- Floors
- 5
- Residential units
- 25
- Building area
- 17,220 ft²
- Lot area
- 5,000 ft²
- Zoning
- R6
- Community board
- 201
- Council district
- 17
- Block / lot
- 2375 / 29
- Assessed value
- $366,750
- Landmark / historic district
- No
HPD registration #205213, last renewed Aug 21, 2025.
Questions about 425 East 153 Street
Who owns 425 East 153 Street?
The owner of record in NYC Department of City Planning PLUTO data is 425 East 153 Street HDFC.
Does 425 East 153 Street have violations?
Yes. NYC HPD has recorded 258 housing violations at this property.
Is 425 East 153 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 425 East 153 Street built?
City records list 1912 as the year it was built.
How many apartments are in 425 East 153 Street?
It has 25 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.