roofy

425 East 153 Street

Bronx, NY 10455BBL 2-02375-0029Map

Owner of record: 425 East 153 Street HDFC

425 East 153 Street is a walk-up apartment building built in 1912 in Bronx, 10455. It has 25 residential units across 5 floors. The owner of record is 425 East 153 Street HDFC. HPD has recorded 258 housing violations here, most recently on July 17, 2026. 44 of the 50 most recent violations are still open.

HPD violations
258
DOB violations
11
ECB violations
5
HPD complaints
263

What to know

Concern
8 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Jul 17, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 258

  • B

    Remove all encumbrances consisting of flower pots at 2nd, 3rd and 4th story at rear at fire escape

    Jul 17, 2026

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east

    Jul 17, 2026 · Apt 4B

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east

    Jul 17, 2026 · Apt 4B

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color approx 4 sqft at west wall in the 2nd room from east located at apt 4b, 4th story, 1st apartment from north at east

    Jul 17, 2026 · Apt 4B

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4a, 4th story, 2nd apartment from north at east

    Jul 17, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4a, 4th story, 2nd apartment from north at east

    Jul 17, 2026 · Apt 4A

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling and walls in the bathroom located at apt 4e, 4th story, 1st apartment from west at north

    Jul 17, 2026 · Apt 4E

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the bathroom located at apt 4a, 4th story, 2nd apartment from north at east

    Jul 17, 2026 · Apt 4A

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of plexi glass pane at entrance door , 1st story

    Jul 17, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 30, 2026

    Open — Nov sent out
Show 40 more ↓
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from east located at apt 4b, 4th story, 2nd apartment from west at north

    Dec 26, 2025 · Apt 4B

    Open — Not complied with
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 2b, 1st story, 2nd apartment from east at south

    Jul 20, 2025 · Apt 2B

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 2b, 1st story, 2nd apartment from east at south

    Jul 20, 2025 · Apt 2B

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective spring balance at lower sash at fire escape window at south wall in the 3rd room from north at west located at apt 2b, 1st story, 2nd apartment from east at south

    Jul 20, 2025 · Apt 2B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2b, 1st story, 2nd apartment from east at south

    Jul 20, 2025 · Apt 2B

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective decorative metal cornice at parapet wall at roof , building front.

    Jul 16, 2025

    Open — Not complied with
  • A

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 5e, 5th story, 1st apartment from west at north

    May 3, 2025 · Apt 5E

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south wall, west wall, east wall in the 1st room from north located at apt 5e, 5th story, 1st apartment from west at north

    May 3, 2025 · Apt 5E

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation east radiator in the 1st room from north located at apt 5e, 5th story, 1st apartment from west at north

    May 3, 2025 · Apt 5E

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation radiator at west in the 2nd room from north at east located at apt 5e, 5th story, 1st apartment from west at north

    May 3, 2025 · Apt 5E

    Open — Nov sent out
  • A

    Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 5e, 5th story, 1st apartment from west at north

    May 3, 2025 · Apt 5E

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 5e, 5th story, 1st apartment from west at north

    May 3, 2025 · Apt 5E

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 5a, 5th story, 2nd apartment from east at south

    Feb 11, 2025 · Apt 5A

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5a, 5th story, 2nd apartment from east at south

    Feb 11, 2025 · Apt 5A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south

    Feb 11, 2025 · Apt 5A

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south

    Feb 7, 2025 · Apt 2B

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective vynil floor tiles in the kitchen located at apt 5e, 5th story, 1st apartment from west at north

    Feb 7, 2025 · Apt 5E

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Feb 7, 2025

    Open — Not complied with
  • B

    Properly repair or replace the broken or defective latch at roof door at 1st public hall bulkhead from north, 5th story

    Feb 7, 2025

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective latch at roof door at 1st public hall bulkhead from north, 5th story

    Feb 7, 2025

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Feb 7, 2025

    Open — Not complied with
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5e, 5th story, 1st apartment from west at north

    Feb 7, 2025 · Apt 5E

    Open — Nov certified late
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5e, 5th story, 1st apartment from west at north

    Feb 7, 2025 · Apt 5E

    Open — Nov certified late
  • B

    Repair the roof so that it will not leak above the ceiling at 1st public hall bulkhead from north, 5th story

    Nov 28, 2024

    Open — Not complied with
  • B

    Provide an unlockable slidebolt or hook on roof door that allows re-entry from roof to public hall at 1st public hall bulkhead from north, 5th story

    Nov 28, 2024

    Open — Not complied with
  • C

    Remove the illegal fastening consisting of a panic bar i installed at roof door that does not allow re-entry from roof to public hall at 1st public hall bulkhead from north, 5th story

    Nov 28, 2024

    Open — Not complied with
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Nov 28, 2024

    Open — Not complied with
  • C

    Provide hot water at all hot water fixtures in the kitchen located at apt 5b, 5th story, 1st apartment from east at south

    Nov 28, 2024 · Apt 5B

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective (latch) at apartment door in the entrance located at apt 5e, 5th story, 1st apartment from west at north

    Nov 18, 2024 · Apt 5E

    Closed — Violation closed
  • A

    Post, in the form approved by the commissioner, and maintain the notice about prevention, detection and removal of bedbug infestation required by §27-2018.1 in common area of the building or provide to each tenant, according to the certification made on such annual bedbug report.

    Nov 18, 2024

    Open — Not complied with
  • A

    Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided. at public hall, 1st story

    Nov 18, 2024

    Open — Not complied with
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Nov 18, 2024

    Open — Not complied with
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq. ft at ceiling in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south original violation 17427265 issued 18-nov-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Nov 18, 2024 · Apt 5A

    Open — First no access to re- inspect violation
  • B

    Repair or replace the carbon monoxide detecting device(s). that is missing in the entire apartment located at apt 5e, 5th story, 1st apartment from west at north

    Nov 18, 2024 · Apt 5E

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective mortise lock and assembly at apartment door in the entrance located at apt 5e, 5th story, 1st apartment from west at north

    Nov 18, 2024 · Apt 5E

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the kitchen located at apt 5e, 5th story, 1st apartment from west at north

    Nov 18, 2024 · Apt 5E

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Nov 18, 2024

    Open — Not complied with
  • B

    M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 4th room from north at east located at apt 5a, 5th story, 2nd apartment from east at south

    Nov 18, 2024 · Apt 5A

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). that is missing in the entire apartment located at apt 5a, 5th story, 2nd apartment from east at south

    Nov 18, 2024 · Apt 5A

    Open — Nov sent out
  • B

    Repair or replace the smoke detector that is defective in the entire apartment located at apt 5a, 5th story, 2nd apartment from east at south

    Nov 18, 2024 · Apt 5A

    Open — Nov sent out

DOB building violations · 11

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 17, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
Show 1 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed

ECB violations · 5

  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35163688l issued on 12-22-17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for collapsed ceiling in apt#4b. remedy: comply w/comm's order

    Mar 3, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation#35407147r issued on 07/18/19 and to file a certificate of correction pursuant to 28-201.1 and 1 rcny 102-01.remedy:comply with comm

    Jan 3, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35407147r issued on 07-18-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner. remedy: comp

    Nov 15, 2019 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35407147r issued on 07-18-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.

    Oct 4, 2019

    Resolve
  • Class - 1

    Failure to maintain. at the time of inspection of the above address on the above date it was observed that a 2'x3' section of the plaster ceiling collapsed in the apt and struck the female tenant in the apt. re

    Jul 18, 2019 · Penalty $6,250

    Active

Complaints

  • Heat/hot water

    Entire building

    Dec 16, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 5, 2025 · Apt 5E

    Close
  • Paint/plaster

    Wall

    Oct 9, 2025 · Apt 4B

    Close
  • Heat/hot water

    Entire building

    Jul 19, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jul 19, 2025 · Apt 5E

    Close
  • Heat/hot water

    Entire building

    Jul 18, 2025 · Apt 2B

    Close
  • Water leak

    Heavy flow

    May 22, 2025 · Apt 2D

    Close
  • Water leak

    Damp spot

    May 22, 2025 · Apt 2D

    Close
  • Electric

    Outlet/switch

    May 1, 2025 · Apt 5E

    Close
  • Flooring/stairs

    Floor

    May 1, 2025 · Apt 5E

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    May 1, 2025 · Apt 5E

    Close
  • Unsanitary condition

    Pests

    May 1, 2025 · Apt 5E

    Close
  • Unsanitary condition

    Pests

    May 1, 2025 · Apt 5E

    Close
  • Water leak

    Heavy flow

    May 1, 2025 · Apt 5E

    Close
  • Unsanitary condition

    Mold

    May 1, 2025 · Apt 5E

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 5, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 27, 2024 · Apt 5E

    Close
  • Heat/hot water

    Entire building

    Nov 23, 2024 · Apt 2D

    Close
  • Heat/hot water

    Entire building

    Nov 16, 2024 · Apt 5E

    Close
  • Heat/hot water

    Entire building

    Nov 14, 2024 · Apt 5E

    Close
  • Heat/hot water

    Entire building

    Nov 13, 2024 · Apt 4E

    Close
  • Heat/hot water

    Entire building

    Nov 12, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 12, 2024 · Apt BLDG

    Close
  • Paint/plaster

    Ceiling

    Jul 10, 2024 · Apt 5B

    Close
  • Paint/plaster

    Ceiling

    Jul 10, 2024 · Apt 5B

    Close
  • Heat/hot water

    Apartment only

    May 23, 2024 · Apt 5E

    Close
  • Water leak

    Heavy flow

    Apr 3, 2024 · Apt 5FL

    Close
  • Heat/hot water

    Entire building

    Apr 3, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 11, 2024 · Apt 5E

    Close
  • Heat/hot water

    Apartment only

    Mar 9, 2024 · Apt 5E

    Close
  • Heat/hot water

    Entire building

    Mar 8, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 7, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2024 · Apt 5E

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2024 · Apt BLDG

    Close
  • Paint/plaster

    Ceiling

    Jan 19, 2024 · Apt 5E

    Close
  • Door/window

    Window frame

    Jan 19, 2024 · Apt 5E

    Close
  • Water leak

    Heavy flow

    Jan 19, 2024 · Apt 5E

    Close
  • Paint/plaster

    Wall

    Jan 19, 2024 · Apt 5E

    Close
  • Unsanitary condition

    Mold

    Jan 19, 2024 · Apt 5E

    Close
  • Heat/hot water

    Apartment only

    Jan 19, 2024 · Apt 5E

    Close
  • Heat/hot water

    Entire building

    Jan 5, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 5, 2024 · Apt 2D

    Close
  • Heat/hot water

    Apartment only

    Jan 5, 2024 · Apt 5E

    Close
  • Heat/hot water

    Entire building

    Jan 2, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 2, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 2, 2024 · Apt 5B

    Close
  • Heat/hot water

    Entire building

    Jan 1, 2024 · Apt 5E

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C6)
Year built
1912
Floors
5
Residential units
25
Building area
17,220 ft²
Lot area
5,000 ft²
Zoning
R6
Community board
201
Council district
17
Block / lot
2375 / 29
Assessed value
$366,750
Landmark / historic district
No

HPD registration #205213, last renewed Aug 21, 2025.

Questions about 425 East 153 Street

Who owns 425 East 153 Street?

The owner of record in NYC Department of City Planning PLUTO data is 425 East 153 Street HDFC.

Does 425 East 153 Street have violations?

Yes. NYC HPD has recorded 258 housing violations at this property.

Is 425 East 153 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 425 East 153 Street built?

City records list 1912 as the year it was built.

How many apartments are in 425 East 153 Street?

It has 25 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.