2568 Park Avenue
Bronx, NY 10451BBL 2-02340-0014Map
Owner of record: 2568 Park Bronx LLC
2568 Park Avenue is a hotel built in 2018 in Bronx, 10451. The owner of record is 2568 Park Bronx LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 3
- ECB violations
- 31
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 3
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Oct 26, 2009
Dob violation - dismissed
ECB violations · 31
- Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure documenting the conditions of psid#x0004843 by the august 1, 2024 deadline. to date, the department
Oct 1, 2024 · Penalty $2,500
Resolve - Class - 2
Pedestrian protection does not meet code specifications(sidewalk shed)at the time of my inspection,i observed that the sidewalk shed on exposure 3 did not have high visibility reflective material/paint on the v
Apr 24, 2020 · Penalty $2,400
Resolve - Class - 1
Bc33016-no design drawing(temporary construction platform/ramp)at timeof inspection for a new 11 story bldg under-construction i observed anactive construction site with platform/ramp constructed and erected at
Mar 13, 2020 · Penalty $2,500
Resolve - Class - 2
Bc330721-failure to comply with dot regulations as per 34 rcny.at timeof inspection of an active jobsite with site safety coordinator present,i observed at exposure#1 that there was yodock system obstructing th
Mar 13, 2020 · Penalty $625
Resolve - Class - 2
Work does not conform to approved construction document(ssp)at time ofinspection of an active jobsite with site safety coordinator present,iobserved at exposure#1 that the construction fence does not conform to
Mar 13, 2020 · Penalty $1,250
Resolve - Class - 1
Bc33016-no design drawing(temporary construction protective structure-fence)at time of inspection of an active jobsite with site safety coordinator present,i observed that upon request of approved design drawin
Mar 13, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to sfaeguard all persons and property during construction operations at the time of my inspection it was observed that electrical wire was exposed at exp #1 and sidewalk shed at exp#3 and exposed usual
Jul 19, 2019 · Penalty $10,000
Resolve - Class - 2
28-105.12.8:work is not accordance with site safety plan at the tiem of my inspection it was observed an actiev construction site where provided an actiev construction site where provided ssp-009.00 was not bei
Jul 19, 2019 · Penalty $625
Resolve - Class - 2
Pedestrian protection does not meet code specifications.at the time ofm inspections it was observed an active construction site where it wasnoted that 5' of pedestrian protection we() was not provided at exp1
Jul 19, 2019 · Penalty $2,400
Resolve - Class - 2
Failure to aintain safety measures at actiev jobsite observed 11 story new building site where it was noted test at roof level (setrack) has no guardrails at exp#2 there was uncapped rebar there was no controll
Jul 19, 2019 · Penalty $625
Resolve
Show 21 more ↓
- Class - 2
3309.10:failure to protetc or adequately perfect adjoining properties during construction or condition(roof ) protetcion at the time of inspection it was observed that there was no roof protection installed at
Jul 19, 2019 · Penalty $625
Resolve - Class - 1
Bc3301.2 safety measures and standards: unsafe material handling.noteat the time of inspection (incident/accident type) of a story buildingat 10th floor level under construction. active jobsite. as per site sa
Jul 12, 2019
Resolve - Class - 1
Failed to notify the department of an incident that resulted in a fatality or injury.note:a worker got cut on his left hand(wrist) when lifting garbage to the dumpster.co worker took him to urgent care.as per t
Jul 12, 2019 · Penalty $5,000
Resolve - Class - 1
Bc3314.5.failure to maintain scaffold.at time of my inspection observed active jobsite.the pipe scaffold at 9th and 10th fl level platform working level not fully planked(gap)more than 3" created a hazard condi
May 31, 2019 · Penalty $2,500
Resolve - Class - 1
3314.8.1 no guardrails. at the time o fmy insepction observed at job site the pipe scaffold at 9th and 10th floor level missing guard- rails. as required created a fall hazard condition. remedy: stop all
May 31, 2019 · Penalty $2,500
Resolve - Class - 1
Bc3314.13.failure to maintain scaffold.at time of my inspection observed active job site.the pipe scaffoldall 9ft 10th fl level missing secure pins as required.rem:provide and maintain secure pins
May 31, 2019 · Penalty $2,500
Resolve - Class - 1
Bc3314.8 failure to maintain scaffold distance betwen platform and building face is more than 3". note: at time of my inspection observedaction job site. the pipe scaffold at exp1 and 2 at 9th and 10th floor
May 31, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to safeguard all persons and property.at time of my inspectionobserved active jobsite.the pipe scaffold at 9th and 10th floor level incident causing 10th floor level worker fell.power drill machine and
May 31, 2019 · Penalty $5,000
Resolve - Class - 2
Respondent failed to make the proper notification for mobile crane after 5-1-18. mobile crane cn#575/18 cd#4957 arrived & departed from 2568park ave but did not notify the dept of its departure. remedy: notify
Feb 25, 2019 · Penalty $5,000
Resolve - Class - 2
Respondent failed to make the proper notification for mobile crane after may 1,2018 to the department.mobile crane cw#575/18 cd#4957 arrived and departed from 2568 park ave but did not notify the dept of its de
Jan 30, 2019 · Penalty $5,000
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. as noted: at time of inspection at an active construction site observed at cellar level for column base plate anchor bolts va
Oct 17, 2018 · Penalty $620
Resolve - Class - 2
Pedestrian protection does not meet code specifications.note:10 story building at excavation phase.at expo#1 on the street the public pedestrian walkway in front of site is not the required 5ft/it is appx 2ft w
Oct 28, 2017 · Penalty $2,400
Resolve - Class - 1
Bc3303.4.1.1/maintenace:slipping/trippin hazard.note:10 story buildingat excavation phase.at expo#1 in the street.there is no handycap ramp from the curb to the street at expo#2 of the site.the public s/w is cl
Oct 28, 2017 · Penalty $400
Resolve - Class - 2
Noted work under alteration type 2 permit #220117790 exceeded scope of work total demolition of bldg all walls floors roof plumbing and electric removed full stop work order issued & posted to premises pursuant
Sep 10, 2011 · Penalty $500
Resolve - Class - 2
Sidewalk shed does not meet code specifications.lights are not on,under shed observed 6:45am.remedy:comply w/ code.
Nov 5, 2010 · Penalty $2,400
Resolve - Class - 2
Following the receipt of permit to erect a sidewalk shed,the permit holder post a readily visible sign on the sidewalk shed,such sign shall include name/address/#,permit #,expiration date.no sign on sidewalk sh
Nov 5, 2010 · Penalty $800
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dept of bldgs. noted: respondent failed to comply with the commissioner's order to correct the violating conditions &
Sep 14, 2010 · Penalty $800
Resolve - Class - 1
Demolition work w/o required demolition permit. noted: at time of inspection 3 worker demolishing front end brick masonry wall from top down work at 2nd story. remedy: obtain required demolition permit stop all
May 20, 2010 · Penalty $4,800
Resolve - Class - 1
Failure to maintain bldg wall(s) and appurtenances. defect noted : @ front of premises, 2 story free standing brick masonry wall, parapet missing bricks, some loose brick work various cracks and step cracks thr
Oct 22, 2009 · Penalty $5,000
Resolve - Non-hazardous
Failure to provide approved plans at premises at time of inspection noted demo work inside of bldg of roof stop all work remedy: provide approved plans
Mar 3, 2008 · Penalty $130
Resolve - Non-hazardous
Failure to maintain exterior bldg wall defect:parapet is leaning inward towards roof,approx 3"-4" the parapet appears to be 3'-6" height & 50' wide.there appears to be no immediate danger of collapse.remedy:
Jul 13, 2007 · Penalty $350
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H3)
- Year built
- 2018
- Floors
- 10
- Residential units
- —
- Building area
- 44,315 ft²
- Lot area
- 11,128 ft²
- Zoning
- M1-2
- Community board
- 201
- Council district
- 8
- Block / lot
- 2340 / 14
- Assessed value
- $5,839,200
- Landmark / historic district
- No
Questions about 2568 Park Avenue
Who owns 2568 Park Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2568 Park Bronx LLC.
Does 2568 Park Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 2568 Park Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2568 Park Avenue built?
City records list 2018 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.