323 East 149 Street
Bronx, NY 10451BBL 2-02331-0056Map
Owner of record: 323 E149 LLC
323 East 149 Street is a mixed residential and retail building built in 1931 in Bronx, 10451. It has 2 residential units across 3 floors. The owner of record is 323 E149 LLC. HPD has recorded 8 housing violations here, most recently on April 30, 2026.
- HPD violations
- 8
- DOB violations
- 4
- ECB violations
- 1
- HPD complaints
- 21
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 8
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Aug 2, 2021 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Aug 2, 2021 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective broken glass at inner pane lower sash, 2nd window fron west at north in the 1st room from north at east located at apt 3r, 3rd story, 1st apartment from west at north
Aug 2, 2021 · Apt 3R
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall, 1st story
Aug 2, 2021
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at the ceiling in the 1st room from north at east located at apt 3r, 3rd story, 1st apartment from west at north
Aug 2, 2021 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at east, the 2nd room from north at west, the foyer located at apt 3r, 3rd story, 1st apartment from west at north
Aug 2, 2021 · Apt 3R
Closed — Violation dismissed
DOB building violations · 4
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active
ECB violations · 1
- Class - 2
97l10,37w07,37x10,37q03,56y13,60q03. 97l- repair elevator so it will be able to lift capacity load & allow us to complete inspection. 37w- provide lock for overhead sheave room door. 37x- repair light in overh
Oct 14, 2010
Resolve
Complaints
- General
Bell/buzzer/intercom
Jan 20, 2026 · Apt 2R
Close - General
Ventilation system
Jan 20, 2026 · Apt 2R
Close - Paint/plaster
Ceiling
Jan 20, 2026 · Apt 2R
Close - General
Cabinet
Jan 20, 2026 · Apt 2R
Close - Electric
Outlet/switch
Jan 20, 2026 · Apt 2R
Close - Flooring/stairs
Floor
Jan 20, 2026 · Apt 2R
Close - General
Cabinet
Dec 8, 2025 · Apt 2R
Close - Plumbing
Basin/sink
Dec 8, 2025 · Apt 2R
Close - Flooring/stairs
Floor
Dec 8, 2025 · Apt 2R
Close - Plumbing
Bathtub/shower
Mar 7, 2025 · Apt 2R
Close
Show 11 more ↓
- Door/window
Door
Mar 7, 2025 · Apt 2R
Close - Paint/plaster
Cabinet
Mar 7, 2025 · Apt 2R
Close - General
Bell/buzzer/intercom
Mar 7, 2025 · Apt 2R
Close - Safety
Smoke detector
Mar 7, 2025 · Apt 2R
Close - Paint/plaster
Wall
Mar 7, 2025 · Apt 2R
Close - Plumbing
Toilet
Mar 7, 2025 · Apt 2R
Close - General
Cabinet
Mar 7, 2025 · Apt 2R
Close - Water leak
Heavy flow
Mar 7, 2025 · Apt 2R
Close - Safety
Carbon monoxide detector
Mar 7, 2025 · Apt 2R
Close - Water leak
Slow leak
Jul 14, 2021 · Apt 3R
Close - Paint/plaster
Wall
Jul 14, 2021 · Apt 3R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 2
- Building area
- 4,575 ft²
- Lot area
- 2,000 ft²
- Zoning
- C4-4
- Community board
- 201
- Council district
- 17
- Block / lot
- 2331 / 56
- Assessed value
- $76,620
- Landmark / historic district
- No
HPD registration #229219, last renewed Oct 28, 2025.
Questions about 323 East 149 Street
Who owns 323 East 149 Street?
The owner of record in NYC Department of City Planning PLUTO data is 323 E149 LLC.
Does 323 East 149 Street have violations?
Yes. NYC HPD has recorded 8 housing violations at this property.
Is 323 East 149 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 323 East 149 Street built?
City records list 1931 as the year it was built.
How many apartments are in 323 East 149 Street?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.