290 East 150 Street
Bronx, NY 10451BBL 2-02331-0013Map
Owner of record: Melrose Hotel LLC
290 East 150 Street is a hotel built in 2021 in Bronx, 10451. The owner of record is Melrose Hotel LLC. HPD has recorded 6 housing violations here, most recently on June 1, 2020. 6 of the 6 most recent violations are still open.
- HPD violations
- 6
- DOB violations
- 4
- ECB violations
- 37
- HPD complaints
- 8
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 6
- BHazardous
Trace and repair the source and abate the visible mold condition... at the ceiling, approx 18 sq ft in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Jun 1, 2020 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Repair the leaky and/or defective faucets at the washbasin in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Jun 1, 2020 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at the north wall in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Jun 1, 2020 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at the south wall, approx 15 sq ft in the 1st room from north at west located at apt 1, 1st story, 1st apartment from east at south
Jun 1, 2020 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Repair the leaky and/or defective faucets at the sink in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Jun 1, 2020 · Apt 1
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures ... in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jun 1, 2018 · Apt 1
Open — Nov sent out
DOB building violations · 4
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed
ECB violations · 37
- Class - 1
At time of inspection of a 10-story new building, none active construction site during my inspection i observed pedestrian walkway does not me code 3307.2 streets, including sidewalks, walkways, and pathways th
Sep 13, 2025 · Penalty $1,250
Resolve - Class - 2
Observed active job site with inadequate housekeeping at various locations. at roof level of jobsite construction debris & materials littered & not secured. rear yard expo 3 w/ large amounts of trash and constr
Apr 4, 2025
Resolve - Class - 2
Observed active job site with active fence permit. fence @ expo 3 in disrepair, a section of fence plywood panel dislodged and on the ground, allowing access from adjacent property to active job site. maintain
Apr 4, 2025 · Penalty $1,000
Resolve - Class - 2
10 story new building active site exterior work on supported scaffolding at exp#1,2 approximately 115 ft in height. observed loose vertical debris netting on supported scaffold contrary to plans pg eq-005.0/002
Dec 12, 2024
Resolve - Class - 2
Proposed 10 story active site. alternate ssm on site bc3310.5.1. observed ssm on pw2 not present onsite juan mojica reg#2286 more than 2 weeks. observed safety log with last entry on 4/26/2024. alt ssm dillon j
May 20, 2024 · Penalty $2,500
Resolve - Class - 2
A proposed 10 story nb active site. at 8 floor level observed needle beams in place at 4 floor underneath 50 ft of pipe scaffold. work does not conform to plans eq-007.00. missing anchor bolt plate at fulcrum p
May 20, 2024 · Penalty $620
Resolve - Class - 2
A proposed 10 story nb active site. at 8 floor level observed work contrary to site safety plan pg. 102.00. observed no standpipe/no hoist/no needle beams on plans. and as per plans no horizontal netting in pla
May 20, 2024 · Penalty $620
Resolve - Class - 2
A proposed 10 story nb, active site. observed fire suppression systems in place temporary standpipe up to 5th floor. upon review in bis/dob now. it was observed that there was was no active permit in dob record
May 20, 2024 · Penalty $620
Resolve - Class - 2
At time of inspection, observed active jobsite currently at 7 story 65 feet. at exposure one observed a combination of barriers, traffic cones and a wooden barrier. upon reviewing site safety plan page 13 on de
Apr 2, 2024 · Penalty $620
Resolve - Class - 2
Failure to comply with the commissioners order to file a certificate of correction with the department of buildings. violation #39507677h under complaint #2354216 has no certificate of correction and no access
Mar 21, 2023 · Penalty $1,280
Resolve
Show 27 more ↓
- Class - 2
At time of inspection for class1 vio#39502018l issued on 06-08-22, site is closed. upon checking department records no certificate of correction on file associated with the above mentioned violation. respondent
Jan 30, 2023 · Penalty $3,125
Resolve - Class - 2
At time of inspection for class1 vio#39502020k issued on 06-08-22, site is closed. upon checking department records no certificate of correction on file associated with the above mentioned violation. respondent
Jan 30, 2023 · Penalty $3,125
Resolve - Class - 2
At time of inspection for class1 vio#39502019n issued on 06-08-22, site is closed. upon checking department records no certificate of correction on file associated with the above mentioned violation. respondent
Jan 30, 2023 · Penalty $3,125
Resolve - Class - 2
At time of inspection for hazardous violation #39507677h, no access provided to verify construction documents/plans for compliance. the respondent failed to comply with the commissioner's order to file a certif
Jan 12, 2023 · Penalty $3,125
Resolve - Class - 2
At time of inspection for class1 vio#39502018l issued on 06-08-22 for work doesn't conform to approved documents, site is closed unable to verify conditions. upon checking department of buildings records no cer
Dec 7, 2022 · Penalty $3,125
Resolve - Class - 2
At time of inspection for class1 vio#39502019n issued on 06-08-22 for inadequate housekeeping, site is closed unable to verify conditions. upon checking department of buildings records no certificate of correct
Dec 7, 2022 · Penalty $3,125
Resolve - Class - 2
At time of inspection for class1 vio#39502020k issued on 06-08-22 for missing window protection, site is closed unable to verify conditions. upon checking department of buildings records no certificate of corre
Dec 7, 2022 · Penalty $3,125
Resolve - Class - 2
Note: at the time of inspection observed 10sty nb under construction at 3rd floor level. also observed sidewalk shed at front with active permit & and no parapet information panel on it, creating hazard for 1st
Nov 17, 2022 · Penalty $3,125
Resolve - Class - 2
Note: at the time of inspection observed 10sty nb under construction at 3rd floor level. site closed, observed from outside no construction activity. also observed sidewalk shed at front not extended 20ft at ex
Nov 17, 2022 · Penalty $5,000
Resolve - Class - 1
Violation #39502018l was issued for sws not fully extended to 20ft at exp1 on 06.08.2022. atoi, observed proposed 10 story newbuildling at 3story level. the sws was not extended to exp4 side. the hazardous cond
Oct 17, 2022 · Penalty $2,500
Resolve - Class - 2
Violation #39502018l, 39502019n, 39502020k was issued on 06.08.2022. no certificate of correction for those violating condition was not filed on bis. g.c failed to comply with commissioner's order. correct viol
Oct 17, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/commissioner's order to file certificate of correction w/the dept. of bldgs.respondent failed to comply w/commissioner'sorder to correct the violating condition & file a certificate of corre
Aug 18, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/commissioner's order to file certificate of correction w/the dept of bldgs.respondent failed to comply w/commissioner order to correct the violating conditions & file a certificate of correc
Aug 18, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/commissioner's order to file certificate of correction w/the dept. of bldgs.respondent failed to comply w/comissioner's order to correct the violating conditions & file a certificate of corr
Aug 18, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to provide project information panel/sws parapet const sign.at time of inspection of new building closed site observed contractor failed to provide project information panel/sign at sidewalk shed parape
Jun 10, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to maintain project information panel.at time of inspection of new building closed site observed contractor failed to maintain project information panel.code stipulates project information panel shall b
Jun 10, 2022 · Penalty $1,250
Resolve - Class - 2
Bc3307.2.3 temporary public walkway within site/missing netting.at time of inspection of new building closed site observed contractor failed to provide synthetic netting to enclosed gap beyond height of fence t
Jun 10, 2022 · Penalty $1,250
Resolve - Class - 1
At a proposed 10 story building at 3rd floor level.i noticed poor housekeeping at rear yard piles of garbage bags creating a rodent infestation, pieces of metal rebar and wood creating a tripping fall hazard.p
Jun 8, 2022 · Penalty $2,500
Resolve - Class - 1
At a proposed 10 story building at 3rd floor level active work.as per approved site safety plan and approved sidewalk shed plan. i noticed no overhead protection in place at exp#4 to protect neighbors rear yard
Jun 8, 2022 · Penalty $2,500
Resolve - Class - 1
At time of my inspection i noticed at exp#4 neighboring property missing window protection. proposed 10 story building at 3rd floor level with exposed neighboring window missing netting.provide netting on windo
Jun 8, 2022 · Penalty $2,500
Resolve - Class - 2
Inadequate fence/missing fence note:atoi observed 10styb under const@foundation level.workers working on it.also observed missing const [email protected] hazard for const site if someone access site thru miss
Apr 19, 2022 · Penalty $500
Resolve - Class - 2
Work contrary to const docs note:atoi observed 10styb under const@foundation level.workers working on it.observed ohp built@exp2 on adj 4styb's sideyd w/permit x00719860-sh&observed no parapet on it.as per over
Apr 19, 2022 · Penalty $625
Resolve - Class - 1
Work contrary to ssp note:atoi observed 10styb under const@foundation level.workers working on it.observed they built window protection (total4)using plywood shut@exp2 area on adj 4sty existing bldg window crea
Apr 19, 2022 · Penalty $625
Resolve - Class - 1
Missing guardrails note:atoi observed 10styb under const@foundation level.workers working on it.also observed they have about 10'd cellar foundation wall area wide open.no guardrails or no caz for protecting pu
Apr 19, 2022 · Penalty $12,500
Resolve - Class - 1
3310.4 failure to provide site safety monitoring program.at time of inspection observed a proposed 10 story new building at foundation stageduring inspection noted that there is no site safety program at the si
Mar 2, 2022 · Penalty $2,500
Resolve - Class - 1
Sec. 3309.14 failure to provide window protection. at time of my inspection of a closed jobsite proposed 10 sty at foundation phase. i noticed neighboring property at exp#2 windows that are unprotected w/no net
Feb 23, 2022 · Penalty $2,500
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. at time of my inspection of a proposed 10 sty bldg at foundation level. i noticed at exp#2 form work boards in place where no con
Feb 23, 2022 · Penalty $5,000
Resolve
Complaints
- Heat/hot water
Entire building
Nov 16, 2020 · Apt 1
Close - Heat/hot water
Entire building
May 29, 2020 · Apt 1
Close - Heat/hot water
Apartment only
Oct 12, 2018 · Apt 1
Close - Unsanitary condition
Mold
Aug 22, 2018 · Apt 1
Close - Heat/hot water
Apartment only
May 30, 2018 · Apt 1
Close - Heat/hot water
Entire building
May 23, 2018 · Apt 1
Close - Heat/hot water
Apartment only
Dec 4, 2017 · Apt 1
Close - Heat/hot water
Entire building
Nov 13, 2017 · Apt 1FLOO
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H3)
- Year built
- 2021
- Floors
- 10
- Residential units
- —
- Building area
- 25,472 ft²
- Lot area
- 4,500 ft²
- Zoning
- C4-4
- Community board
- 201
- Council district
- 17
- Block / lot
- 2331 / 13
- Assessed value
- $2,819,700
- Landmark / historic district
- No
Questions about 290 East 150 Street
Who owns 290 East 150 Street?
The owner of record in NYC Department of City Planning PLUTO data is Melrose Hotel LLC.
Does 290 East 150 Street have violations?
Yes. NYC HPD has recorded 6 housing violations at this property.
Is 290 East 150 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 290 East 150 Street built?
City records list 2021 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.