342 East 148 Street
Bronx, NY 10451BBL 2-02329-0069Map
Owner of record: Associates 26 LLC
342 East 148 Street is a walk-up apartment building built in 1931 in Bronx, 10451. It has 8 residential units across 4 floors. The owner of record is Associates 26 LLC. HPD has recorded 440 housing violations here, most recently on June 21, 2026. 12 of the 50 most recent violations are still open.
- HPD violations
- 440
- DOB violations
- 14
- ECB violations
- 5
- HPD complaints
- 416
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 440
- ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 21, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling, north, east, and west walls in the bathroom located at apt 1e, 1st story, 2nd apartment from north at east
Jun 21, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls in the bathroom located at apt 1e, 1st story, 2nd apartment from north at east
Jun 21, 2026 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1e, 1st story, 2nd apartment from north at east
Jun 21, 2026 · Apt 1E
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch and its assembly at door leading to vestibule from building front at public hall, 1st story
Jun 17, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door leading to vestibule from building front at public hall, 1st story
Jun 17, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Mar 24, 2025
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the black (garbage bags) at south yard (building front)
Mar 24, 2025
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1w, 1st story, 1st apartment from south at west
Mar 24, 2025 · Apt 1W
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1w, 1st story, 1st apartment from south at west
Mar 24, 2025 · Apt 1W
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1w, 1st story, 1st apartment from south at west
Mar 24, 2025 · Apt 1W
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective cracked/ broken (4) vinyl floor tiles at floor at 1st story public hallway at public hall, 1st story
Mar 20, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective lock and assembly (door) at rm entrance in the bathroom located at apt 3e, 3rd story, 1st apartment from north at east
Mar 20, 2025 · Apt 3E
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective broken/damage (wood) door at rm entrance in the 3rd room from north located at apt 3e, 3rd story, 1st apartment from north at east
Mar 20, 2025 · Apt 3E
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective broken/damage (wood) door at rm entrance in the 2nd room from north located at apt 3e, 3rd story, 1st apartment from north at east
Mar 20, 2025 · Apt 3E
Open — False certification - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3e, 3rd story, 1st apartment from north at east
Mar 20, 2025 · Apt 3E
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3e, 3rd story, 1st apartment from north at east
Mar 20, 2025 · Apt 3E
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective broken/ damage (vinyl floor tiles) (16 ) at public hall, 3rd story
Mar 20, 2025
Closed — Violation closed - BHazardous
Provide approved mesh above and below skylight
Mar 20, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at all walls at public hall, 1st story
Mar 20, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at 1st story public staicase (east wall) at public hall stairs, 1st story
Mar 20, 2025
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Mar 20, 2025
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of garbage bags at north yard (zbuilding front) yard
Mar 20, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective door (wood) broken/missing at west wall (upper sink cabinet) in the kitchen located at apt 3e, 3rd story, 1st apartment from north at east
Mar 20, 2025 · Apt 3E
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at all walls at public hall, 2nd story
Mar 20, 2025
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south wall in the bathroom located at apt 2w, 2nd story, 1st apartment from south at west
Mar 19, 2025 · Apt 2W
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2w, 2nd story, 1st apartment from south at west
Mar 19, 2025 · Apt 2W
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2w, 2nd story, 1st apartment from south at west
Mar 19, 2025 · Apt 2W
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 2w, 2nd story, 1st apartment from south at west
Mar 19, 2025 · Apt 2W
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 2w, 2nd story, 1st apartment from south at west
Mar 19, 2025 · Apt 2W
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from south at west wall in the bathroom located at apt 2w, 2nd story, 1st apartment from south at west
Mar 19, 2025 · Apt 2W
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 2nd room from north, the 1st room from north located at apt 2w, 2nd story, 1st apartment from south at west
Mar 19, 2025 · Apt 2W
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2w, 2nd story, 1st apartment from south at west
Mar 19, 2025 · Apt 2W
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from west at north wall in the 4th room from north located at apt 2w, 2nd story, 1st apartment from south at west
Mar 19, 2025 · Apt 2W
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north located at apt 2w, 2nd story, 1st apartment from south at west
Mar 19, 2025 · Apt 2W
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the bathroom located at apt 2w, 2nd story, 1st apartment from south at west
Mar 19, 2025 · Apt 2W
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall in the 4th room from north located at apt 2w, 2nd story, 1st apartment from south at west
Mar 19, 2025 · Apt 2W
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall, north wall in the 4th room from north located at apt 2w, 2nd story, 1st apartment from south at west
Feb 21, 2025 · Apt 2W
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 2w, 2nd story, 1st apartment from south at west
Feb 21, 2025 · Apt 2W
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 4th room from north located at apt 2w, 2nd story, 1st apartment from south at west
Feb 21, 2025 · Apt 2W
Open — Defect letter issued - BHazardous
Properly repair or replace the broken or defective lower sash glass at the 1st window from east at south wall in the kitchen located at apt 2w, 2nd story, 1st apartment from south at west
Feb 21, 2025 · Apt 2W
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lower sash spring balance at the 1st window from east at south wall in the kitchen located at apt 2w, 2nd story, 1st apartment from south at west
Feb 21, 2025 · Apt 2W
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2w, 2nd story, 1st apartment from south at west
Feb 21, 2025 · Apt 2W
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the bathroom located at apt 2w, 2nd story, 1st apartment from south at west
Feb 21, 2025 · Apt 2W
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall, south wall in the bathroom located at apt 2w, 2nd story, 1st apartment from south at west
Feb 21, 2025 · Apt 2W
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... more than (10) sq ft at ceiling, south and east wall in the bathroom located at apt 2w, 2nd story, 1st apartment from south at west
Feb 21, 2025 · Apt 2W
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color approx (20) sq ft at ceiling in the bathroom located at apt 2w, 2nd story, 1st apartment from south at west
Feb 21, 2025 · Apt 2W
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2w, 2nd story, 1st apartment from south at west
Feb 21, 2025 · Apt 2W
Closed — Violation closed
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed
Show 4 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 30, 1975
Dob violation - active
ECB violations · 5
- Class - 2
Found on smith boiler , need to support flue pipe in boiler room, need to file bo9 report for boiler , need sign on oil tank with all information, clean out chinmey base.
May 20, 2024 · Penalty $3,125
Active - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35379525j issued on 02-05-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Aug 5, 2019
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35379525j issued on 02/05/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissi
Jun 1, 2019
Resolve - Class - 1
Occupancy contrary to that allowed by the c of o or buildings dept records. noted;d.o.b. records indicates at 3rd fl level,(2)class 'a' apts. at time of inspection apt 3e;sealed and sub-divided rear bedroom,cre
Feb 5, 2019
Resolve - Non-hazardous
Failure to maintain. defect is: at rear yard of bldg a tree approximately 45 feet high is dry rotted and branches are falling to adjacent property. remedy: remove tree.
Jul 16, 2002
Resolve
Complaints
- Water leak
Heavy flow
Jun 18, 2026 · Apt 1E
Close - Appliance
Electric/gas range
May 20, 2026 · Apt 4W
Close - Heat/hot water
Entire building
Feb 22, 2026 · Apt 2W
Close - Heat/hot water
Apartment only
Feb 22, 2026 · Apt 2W
Close - Flooring/stairs
Floor
Feb 12, 2026 · Apt E3
Close - Door/window
Door
Feb 12, 2026 · Apt E3
Close - Appliance
Electric/gas range
Feb 12, 2026 · Apt E3
Close - Appliance
Refrigerator
Feb 12, 2026 · Apt E3
Close - Heat/hot water
Apartment only
Feb 12, 2026 · Apt E3
Close - Safety
Smoke detector
Mar 18, 2025 · Apt 1E
Close
Show 40 more ↓
- Door/window
Window frame
Mar 18, 2025 · Apt 1E
Close - Door/window
Door
Mar 18, 2025 · Apt 4E
Close - Door/window
Door
Mar 18, 2025 · Apt 4E
Close - Safety
Smoke detector
Mar 18, 2025 · Apt 4E
Close - Safety
Carbon monoxide detector
Mar 18, 2025 · Apt 4E
Close - Door/window
Window frame
Mar 18, 2025 · Apt 4E
Close - Flooring/stairs
Floor
Mar 18, 2025 · Apt 4E
Close - Paint/plaster
Wall
Mar 18, 2025 · Apt 4E
Close - Paint/plaster
Ceiling
Mar 18, 2025 · Apt 4E
Close - Door/window
Window frame
Mar 18, 2025 · Apt 4E
Close - Flooring/stairs
Floor
Mar 18, 2025 · Apt 4E
Close - Unsanitary condition
Mold
Mar 18, 2025 · Apt 4E
Close - Plumbing
Basin/sink
Mar 18, 2025 · Apt 4E
Close - Paint/plaster
Wall
Mar 18, 2025 · Apt 4E
Close - Paint/plaster
Ceiling
Mar 18, 2025 · Apt 4E
Close - Safety
Smoke detector
Mar 18, 2025 · Apt 3E
Close - Unsanitary condition
Pests
Mar 18, 2025 · Apt 1W
Close - Safety
Smoke detector
Mar 18, 2025 · Apt 1W
Close - Safety
Carbon monoxide detector
Mar 18, 2025 · Apt 1W
Close - Unsanitary condition
Mold
Mar 18, 2025 · Apt 1W
Close - Unsanitary condition
Pests
Mar 18, 2025 · Apt 1E
Close - Unsanitary condition
Pests
Mar 18, 2025 · Apt 1E
Close - Door/window
Door
Mar 18, 2025 · Apt 1E
Close - Unsanitary condition
Pests
Mar 18, 2025 · Apt 4E
Close - Safety
Carbon monoxide detector
Mar 18, 2025 · Apt 1E
Close - Door/window
Window pane
Mar 18, 2025 · Apt 1E
Close - Door/window
Window frame
Mar 18, 2025 · Apt 1E
Close - Flooring/stairs
Floor
Mar 18, 2025 · Apt 1E
Close - Electric
Wiring
Mar 18, 2025 · Apt 1E
Close - Unsanitary condition
Mold
Mar 18, 2025 · Apt 1E
Close - Door/window
Window pane
Mar 18, 2025 · Apt 1E
Close - Door/window
Window frame
Mar 18, 2025 · Apt 1E
Close - Safety
Carbon monoxide detector
Mar 18, 2025 · Apt 3E
Close - Unsanitary condition
Mold
Mar 18, 2025 · Apt 2W
Close - General
Bell/buzzer/intercom
Mar 18, 2025 · Apt BLDG
Close - Flooring/stairs
Stairs
Mar 18, 2025 · Apt BLDG
Close - Flooring/stairs
Stairs
Mar 18, 2025 · Apt BLDG
Close - Flooring/stairs
Stairs
Mar 18, 2025 · Apt BLDG
Close - Flooring/stairs
Floor
Mar 18, 2025 · Apt BLDG
Close - Paint/plaster
Ceiling
Mar 18, 2025 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1931
- Floors
- 4
- Residential units
- 8
- Building area
- 7,286 ft²
- Lot area
- 2,940 ft²
- Zoning
- R6
- Community board
- 201
- Council district
- 8
- Block / lot
- 2329 / 69
- Assessed value
- $449,550
- Landmark / historic district
- No
HPD registration #215182, last renewed Jul 24, 2026.
Questions about 342 East 148 Street
Who owns 342 East 148 Street?
The owner of record in NYC Department of City Planning PLUTO data is Associates 26 LLC.
Does 342 East 148 Street have violations?
Yes. NYC HPD has recorded 440 housing violations at this property.
Is 342 East 148 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 342 East 148 Street built?
City records list 1931 as the year it was built.
How many apartments are in 342 East 148 Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.