391 East 149 Street is an office building built in 1908 in Bronx, 10455. The owner of record is Melrose LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
99
ECB violations
58
HPD complaints
16

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 99

  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 11, 2020

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 28, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 28, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 28, 2020

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
Show 40 more ↓
  • Construction other optional

    Emerg work.front facades along e 149st&melrose ave cracked,peeling off &part coll into sidewalk.approx 40 linear ft of cornice at roof level remainder of cornice is in state of disrepair&risk of coll.remedy: owner immed secure remainder of cornice@roof level on e 149th st& melrose facades.file for perm for this work no later 10/03/17

    Sep 29, 2017

    Dob violation - active
  • Construction other optional

    Ftm bldg.front facades along e.149th st&melrose ave are cracked,peel off&have part coll into sidewalk.rest of facade at bldg pres cracks&it is in state of disrepair.remedy:owner immed engage nyspe eng'r,prov netting at south&east facades&install sidewalk shed.obtain perm for repair of facade no later 10/10/17.facade repair sign off by 10/24/17

    Sep 26, 2017

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 18, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 18, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 18, 2017

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 3, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 3, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 3, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 10, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 10, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 10, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 3, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 3, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 3, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 9, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 9, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 9, 2013

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 19, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 19, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 19, 2012

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 22, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 22, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 22, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 7, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 7, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 7, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 30, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 30, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 30, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 20, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 20, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 20, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 23, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 23, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 23, 2007

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 3, 2006

    Dob violation - resolved

ECB violations · 58

  • Class - 1

    Failure to comply with the commissioners order contained in summons.violation#39026824l issued on 08-12-20 and to file a certficiate of correction pursuant to 28-201.1 and 1rcny 102-01 for work without a permit

    Jan 4, 2021 · Penalty $1,563

    Resolve
  • Class - 1

    Failure to comply with the commissioners order contained in summons.violation #39026824l issued on 08-12-20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-02.work without permit at 1

    Oct 13, 2020 · Penalty $1,265

    Resolve
  • Class - 1

    Work without a permit. work noted: new electrical and plumbing, new opening in slab between cellar and first story. also- partitions storefronts and mezzanine observed at time of inspection. at corner stores. w

    Aug 12, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments. premises under alt-2 job#220692034 loc folder. at the time of inspection found:approved plan indicates store front entry door

    Dec 4, 2019 · Penalty $625

    Resolve
  • Class - 1

    Bc 3314.8.2. debris netting.@the time of inspection observed a heavy duty sidewalk with pipe scafolding on top upto roof lvl @exp one & four.pedestrians walking under the sidewalk shed & vehicular traffic runin

    Apr 16, 2019

    Resolve
  • Class - 1

    Built contrary to plan. equipment onsite is contrary to approved plan. note: at time of inspection, i observed supported scaffold installedm on exp #1 and #4 that is contrary to plan. exceeds the max required w

    Dec 26, 2018

    Resolve
  • Class - 2

    Failure to provide information panel.note;at time of inspection i observed sidewalk shed in place without information panel on parapet.rem:comply with code provide information panel.

    Dec 6, 2018 · Penalty $2,400

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications as per 3307.6.4.8.1.note:at time of my inspection i observed sidewalk shed in place with lights not in operating.rem:comply with code provide lights dusk

    Dec 6, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications as per 3307.6.5.3.note:at time of my inspection i observed sidewalk shed in place not maintained,bracing no secured,parapet panel not secure.rem:comply wi

    Dec 6, 2018 · Penalty $2,400

    Resolve
  • Class - 1

    Log. at the time of inspection of 6story existing building facade workat roof level under construction for replacing existing steel beams and concrete roof w/o design drawing, proper permits. some workers are

    Oct 1, 2018 · Penalty $1,250

    Resolve
Show 40 more ↓
  • Class - 1

    Bc3301.6.1 no design drawing. at time of inspection of a 6story existing building facade work under construction. some workers are working at roof. as per this permit #220635329 concrete placement, formwork.

    Oct 1, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Temporary construction equipment on site-expire permit. at the time ofinspection observed a heavy duty sidewalk shed on 149 st and on melrose ave for remedial repairs work at 6story building in 391 east 149 st

    Oct 1, 2018

    Resolve
  • Class - 2

    Work w/o a permit. at the time of inspection ofa 6 story existing bldgfacade work under construction. some workers are working at roof. as per this permit #220635329 concrete placement, formwork, steel reinfor

    Oct 1, 2018 · Penalty $625

    Resolve
  • Class - 2

    Failure to provide information pnael. note at time of inspection i ob served sidewalk shed in place w/o information panel on parapet. rmdy: comply with code provide information panel.

    Sep 11, 2018 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. broken/defective plaster @ bathroom ceiling @ cellar: also observed water leaking/dripping from ceiling, approx 3-4 inches from the light fixture. rem: make al

    Feb 13, 2018 · Penalty $250

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/vio # 35263841r issued on 09/24/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. 50' long section of masonry missing @ exp. # 1. re

    Oct 28, 2017 · Penalty $400

    Resolve
  • Class - 1

    Failure to maintain building in a code compliant manner.noted:at time of inspection,observed approx 50'long,section of masonry missing from exterior wall(e.149 st)side,section of masonry facade has fallen from

    Sep 24, 2017 · Penalty $1,000

    Resolve
  • Class - 2

    B254,36 36-as per class 254-36 burner not register as per dob recordscorrect all violation conditions and submit a certificate of correcti on.

    Mar 10, 2017

    Resolve
  • Class - 2

    1l10,8v1,5e1,5j1,10h11,16j1,16e1,17h11,56y2,56y13,67l10,68m7,40d6,70o2,71l10,77k10. emergency stop switch defective repair, car floor to landing sill not level adjust, car door rubbing adjust, car door misalign

    Oct 7, 2016

    Resolve
  • Class - 2

    50m07,56m07,70o02.50m07 provide missing brush covers;56m07 provide hoist motor brush covers;70o02 clean pit.

    Jul 26, 2016

    Resolve
  • Class - 2

    50m07,56m07,70o02.50m07 provide missing generator brush covers;56m07 provide hoist machine brush covers;70o02 clean pit.

    Jul 26, 2016

    Resolve
  • Class - 2

    Altered/changed bldg occupied w/o a valid c/o as per 28-118.3.1-28-118.3.2 in that temp co #200214632t002 expd on 3.19.13. and bldg is being occupied. remedy:obtain a valid c/o or discontinue illegal occupancy.

    May 14, 2013

    Resolve
  • Class - 2

    14m07,12q03,35q03,43q03,59q03,67x10,68b07,71m07,100m07. 35q- install cover for electrical box under car. 59q- install cover for electrical box on machine brakes. 67x10- repair communication in car (telephone).

    Oct 17, 2011

    Resolve
  • Class - 2

    12q03,35q03,56y13,67x10,68b07,71x10,71q03,72m07,100m07,57q03. 35q- install cover for electrical box under car. 57q- install cover for motor lead box. 67x- repair communication in car (telephone). 68b- provide

    Oct 17, 2011

    Resolve
  • Class - 2

    01b07,68b07,72m07,100m07. 01b- provide alarm for emergency stop switchin car. 68b- provide updated maintenance log. 100m- provide plank switch for safety.

    Oct 17, 2011

    Resolve
  • Class - 2

    Fail to comply w/comm order to file a certificate of correction w/dob.noted: respondent failed to comply w.comm order to correct the violating conditions & file a certificate of correction pursuant to 28-204.2

    Jul 13, 2010 · Penalty $4,000

    Resolve
  • Class - 1

    It shall be unlawful to fail to comply w/order of commissioner or to violate any order of commissioner issued pursuant to this code, 1968 bldg code, zoning resolution or any law or rule enforced by the departme

    Feb 2, 2010 · Penalty $2,400

    Resolve
  • Non-hazardous

    36b7/ 36-insufficient grease to overhead sheaves provide grease.

    Jun 27, 2006

    Resolve
  • Hazardous

    Failure to maintain. defects noted: front sidewalk vault concrete ceiling is defective with loose, spalling, cracking and exposed reinforcement throughout. remedy: maintain vault. make safe. make all necessary

    Dec 8, 2004

    Resolve
  • Hazardous

    Failure to maintain bldg defects noted:front sidewalk vault concrete celiing is defective w/loose,spalling,cracking & exposed reinforcement throuhtout remedy:maintain vault make safe make all necessary repairs

    Dec 8, 2004

    Resolve
  • Hazardous

    Failure to maintain.defects noted:front sidewalk vault concrete ceiling is defective cracking and spalling throughout.remedy:maintain vault make safe all necessary repairs,obtain permits

    Jul 29, 2004

    Resolve
  • Non-hazardous

    Failure to maintain. defect is at the cellar vault area throughout entire cellar ceiling concrete is spalling and defective make safe immediatly obtain all necessary permits make all necessary repairs

    Mar 9, 2004 · Penalty $800

    Resolve
  • Non-hazardous

    Failure to maintain. defect is : at the basement of building the partition wall between & 8 jewerly store know address 393 e 149 st and 391 e 149th st under the side walk vault area is flaking spalling and defe

    Mar 8, 2004 · Penalty $350

    Resolve
  • Non-hazardous

    Plumbing work without permit cololtional suremder heals adcled to basement. remedy: obtian permit and arrange for inspection with this dept.

    Feb 6, 2003

    Resolve
  • Non-hazardous

    Failure to maintain exterior bdlg wall. defect is: pieces of triangular masonry have fallen from the 2nd story west side front of bldg(e 149st) of decorative masonry cornice. remedy:make necessary repairs in a

    Oct 23, 2000 · Penalty $180

    Resolve
  • Non-hazardous

    74d6. 74d6 properly secure street gae by code.

    Aug 11, 2000

    Resolve
  • Non-hazardous

    73p, device 000 restore to service to service for purpose of proper inspection to be made by the department.

    Apr 10, 1999 · Penalty $350

    Resolve
  • Non-hazardous

    57o,03o,46h,35t,37t,54t,33d,33z,55o,22l,33m,75u. car top is very dirty, hoist cable dirty and medium crown wear, machine room lock, and not marked, provide city id tag number on room lock, not marked, provide

    Apr 10, 1999 · Penalty $350

    Resolve
  • Non-hazardous

    57z,54t,37t,33q,33t,3d,75u,33m. remove water from pit. remove city id tag number on mainline and controller, provide lock and label over head access door.

    Apr 10, 1999 · Penalty $350

    Resolve
  • Non-hazardous

    Work without a permit work noted opening creadted at northeast section of cellar (storage room) remedy: file plans obtain permit or restore back to prior legal condition

    Apr 26, 1994 · Penalty $350

    Resolve
  • Non-hazardous

    Dept of transportation permit for container in street not posted. con-tainer in street in front of 391 e 149 st no dot permits on site.reme-dy - obtain permits and post at site

    May 26, 1993

    Resolve
  • Non-hazardous

    Work without permit - at time of inspection alt # permit # 200214632 call for interior alteration. for new fire rated intererior stairs, interior doors, sprinkler, system, gas piping and oil burner. permit d

    May 26, 1993

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by building dept. records. remedy: discontinue illegal use or obtain a new certificate of occupancy showing current use.

    Jun 24, 1992

    Resolve
  • Non-hazardous

    Exit passageway totaly obstructed.drop ladder missing at 2nd floor landing.door leading to drop ladder exit was pad locked at time of inspection.windows leading onto fire escape were broken only opening 1/2 way

    Jun 22, 1992 · Penalty $475

    Resolve
  • Non-hazardous

    Work without a permit. noted work: new opening constructed northeast section of cellr storage room. remedy: file plans and obtain permit from this dept.

    Apr 30, 1992

    Resolve
  • Non-hazardous

    Work without a permit work noted: new store front constructed,new partitions and stair to basement. remedy: file plans and obtain approvals and permit.

    Apr 27, 1992

    Resolve
  • Unknown

    Work without a permit.work noted:erected a sign approx.9'high by 25' wide stating x'-press at the east elevation of the above premises. remedy:file plans,obtain approvals and permits.

    Aug 28, 1991 · Penalty $285

    Resolve
  • Non-hazardous

    Use of illegal hardware. exits to fire escapes at northwest corner from 2nd to 6th floors are padlocked. remedy: remove illegal hardware forthwith.

    Jul 26, 1991 · Penalty $500

    Resolve
  • Non-hazardous

    Failure to maintain. broken and defective windows throughout 5 story fire retarded materials broken and defective around steel 5th story. ceiling tiles broken and defective and missing throught 5th story.

    Mar 5, 1991 · Penalty $230

    Resolve
  • Non-hazardous

    03i,10i,15o,21l,50o,55m,57o,14m

    Nov 16, 1990

    Resolve

Complaints

  • Water leak

    Heavy flow

    Mar 15, 2022 · Apt 4THFLO

    Close
  • Plumbing

    Toilet

    Mar 15, 2022 · Apt 4THFLO

    Close
  • Door/window

    Window frame

    Mar 15, 2022 · Apt 4THFLO

    Close
  • Door/window

    Door

    Mar 15, 2022 · Apt 4THFLO

    Close
  • Heat/hot water

    Apartment only

    Mar 15, 2022 · Apt 4THFLO

    Close
  • Unsanitary condition

    Pests

    Mar 15, 2022 · Apt 4THFLO

    Close
  • Heat/hot water

    Entire building

    Mar 13, 2022 · Apt BLDG

    Close
  • Safety

    Window guard broken/missing

    Mar 13, 2022 · Apt BLDG

    Close
  • Safety

    Window guard broken/missing

    Mar 13, 2022 · Apt 2

    Close
  • Door/window

    Door

    Mar 13, 2022 · Apt 2

    Close
Show 6 more ↓
  • Door/window

    Door

    Jun 7, 2019 · Apt 2A

    Close
  • Door/window

    Door

    Jun 7, 2019 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Jun 7, 2019 · Apt 2A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 7, 2019 · Apt 2A

    Close
  • Electric

    No lighting

    Jun 7, 2019 · Apt 2A

    Close
  • Electric

    Lighting

    Jul 1, 2011 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Office building (O5)
Year built
1908
Floors
6
Residential units
—
Building area
75,952 ft²
Lot area
14,000 ft²
Zoning
C4-4
Community board
201
Council district
17
Block / lot
2328 / 25
Assessed value
$10,825,200
Landmark / historic district
No

Questions about 391 East 149 Street

Who owns 391 East 149 Street?

The owner of record in NYC Department of City Planning PLUTO data is Melrose LLC.

Does 391 East 149 Street have violations?

NYC HPD has no housing violations on record for this property.

Is 391 East 149 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 391 East 149 Street built?

City records list 1908 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.