roofy

423 East 135 Street

Bronx, NY 10454BBL 2-02280-0069Map

Owner of record: 423 E 135th LLC

423 East 135 Street is an one-family home built in 1901 in Bronx, 10454. It has 1 residential unit across 3 floors. The owner of record is 423 E 135th LLC. HPD has recorded 71 housing violations here, most recently on August 16, 2026. 39 of the 50 most recent violations are still open.

HPD violations
71
DOB violations
6
ECB violations
5
HPD complaints
142

What to know

Concern
17 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 16, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 71

  • C

    Properly repair with similar material the broken or defective loose and missng bricks under 3rd window from west at 2nd story, building front

    Aug 16, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective buldging bricks at 3rd window from west at south, 3rd story

    Aug 16, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Aug 16, 2026

    Open — Nov certified on time
  • C

    Properly repair with similar material the broken or defective fire stopping material at ceiling 240 sqft (missing) in the entire apartment located at bsmt-apt bsmt

    Aug 16, 2026 · Apt BSMT

    Open — Civ14 mailed
  • C

    Immediately provide a fire guard as directed by the nyc dept. of housing preservation & development (hpd) and/or the nyc dept. of buildings (dob) to protect against fire hazards observed by hpd and/or dob. fire hazards observed by hpd have resulted in the following additional hpd violation(s): complaint id 19150869 for fire stopping material in order to protect public safety against imminent fire hazards observed, a fire guard must be provided forthwith for continuous 24 hour coverage, notwithstanding the correction and certification dates set forth above (the correction and certification dates set forth above are applicable for purposes of civil penalties that may be assessed pursuant to nyc administrative code § 27-2115, but do not reflect the date by which a fire guard must be provided). a fire guard must be provided immediately due to the exigency of the dangerous fire hazard conditions observed. the violation requiring a fire guard to be provided will remain open until such time as the fire hazards resulting in the hpd violation(s) referenced above and/or the fire hazards resulting in related dob violation(s) have been dismissed.

    Aug 16, 2026

    Open — Invalid certification
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 30, 2026

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective mortar joints at front south exterior masonary wall from basement to roof

    Sep 10, 2025

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 5, 2025

    Closed — Violation dismissed
  • C

    Replace with new the missing wood floor in the 1st room from east located at apt ground, 1st story, 1st apartment from north at east

    Apr 22, 2025 · Apt GROUND

    Open — Nov sent out
  • C

    Replace with new the missing sheetrock at ceiling in the 1st room from east located at apt ground, 1st story, 1st apartment from north at east

    Apr 22, 2025 · Apt GROUND

    Open — Nov sent out
Show 40 more ↓
  • C

    Replace with new the missing sheetrock at all walls in the 1st room from east located at apt ground, 1st story, 1st apartment from north at east

    Apr 22, 2025 · Apt GROUND

    Open — Nov sent out
  • B

    Replace the broken or defective and or missing sink in the kitchen located at apt ground, 1st story, 1st apartment from north at east

    Apr 22, 2025 · Apt GROUND

    Open — Nov sent out
  • C

    Replace with new the missing wood floor in the kitchen located at apt ground, 1st story, 1st apartment from north at east

    Apr 22, 2025 · Apt GROUND

    Open — Nov sent out
  • C

    Replace with new the missing sheetrock at ceiling in the kitchen located at apt ground, 1st story, 1st apartment from north at east

    Apr 22, 2025 · Apt GROUND

    Open — Nov sent out
  • C

    Replace with new the missing sheetrock at all walls in the kitchen located at apt ground, 1st story, 1st apartment from north at east

    Apr 22, 2025 · Apt GROUND

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt ground, 1st story, 1st apartment from north at east

    Apr 22, 2025 · Apt GROUND

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north,east,south and west walls in the bathroom located at apt ground, 1st story, 1st apartment from north at east

    Apr 22, 2025 · Apt GROUND

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt ground, 1st story, 1st apartment from north at east

    Apr 22, 2025 · Apt GROUND

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective erroded brick and mortar joints at 3rd story 3rd window from west at south exterior wall (building front)

    Jan 23, 2025

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective broken stone window sill at 4th story 2nd window from west at south exterior wall) building front

    Jan 23, 2025

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt ground, 1st story, 1st apartment from west at north

    Oct 11, 2024 · Apt GROUND

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt ground, 1st story, 1st apartment from west at north

    Oct 11, 2024 · Apt GROUND

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt ground, 1st story, 1st apartment from west at north

    Oct 11, 2024 · Apt GROUND

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt ground, 1st story, 1st apartment from west at north

    Oct 11, 2024 · Apt GROUND

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt ground, 1st story, 1st apartment from west at north

    Oct 11, 2024 · Apt GROUND

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt ground, 1st story, 1st apartment from west at north

    Oct 11, 2024 · Apt GROUND

    Open — Notice of issuance sent to tenant
  • C

    Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt ground, 1st story, 1st apartment from west at north

    Oct 11, 2024 · Apt GROUND

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire retardant material at ceiling at basement

    Oct 11, 2024

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2024

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 16, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 16, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 17, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 17, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2021

    Closed — Violation dismissed
  • C

    Replace with new the broken or defective lock at entrance door at basement

    Apr 12, 2019

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 1fl, 1st story, 1st apartment from south at west

    Apr 12, 2019 · Apt 1FL

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective rotted wood floor in the kitchen located at apt 1fl, 1st story, 1st apartment from south at west

    Apr 12, 2019 · Apt 1FL

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1fl, 1st story, 1st apartment from south at west

    Apr 12, 2019 · Apt 1FL

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1fl, 1st story, 1st apartment from south at west

    Apr 12, 2019 · Apt 1FL

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the entire apartment located at apt 1fl, 1st story, 1st apartment from south at west

    Apr 12, 2019 · Apt 1FL

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective rotted wood floor in the 1st room from north located at apt 1fl, 1st story, 1st apartment from south at west

    Apr 12, 2019 · Apt 1FL

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wooden treads 3 , 5 , 6 , 7 from basement leading to 1 st story at public hall stairs

    Apr 12, 2019

    Open — Nov sent out
  • B

    Repair the broken or defective connection waste line pipe at sink in the kitchen located at apt 1fl, 1st story, 1st apartment from south at west

    Apr 12, 2019 · Apt 1FL

    Open — Nov sent out
  • B

    Replace with new the broken or defective corroded base cabinet at sink in the kitchen located at apt 1fl, 1st story, 1st apartment from south at west

    Apr 12, 2019 · Apt 1FL

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 1fl, 1st story, 1st apartment from south at west

    Apr 12, 2019 · Apt 1FL

    Open — Nov sent out
  • B

    Replace with new the broken or defective marble saddle in the bathroom located at apt 1fl, 1st story, 1st apartment from south at west

    Apr 12, 2019 · Apt 1FL

    Open — Nov sent out
  • B

    Properly secure the loose electrical light fixture at ceiling in the 1st room from north located at apt 1fl, 1st story, 1st apartment from south at west

    Apr 12, 2019 · Apt 1FL

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing located at apt 1fl, 1st story, 1st apartment from south at west

    Apr 12, 2019 · Apt 1FL

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 11, 2018

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 13, 2017

    Closed — Violation dismissed

DOB building violations · 6

  • Immediate emergency anythingoptional

    Remedy: install approximately 20' linear feet of sidewalk shed along (east 135 street)

    Aug 17, 2026

    Dob violation - active
  • Immediate emergency anythingoptional

    Remedy: install approximately 20' linear feet of sidewalk shed along exposure 1 (east 135 street) to safeguard the public and property

    Aug 17, 2026

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed

ECB violations · 5

  • Class - 1

    Failure to maintain building facade. at time of inspection, observed missing bricks above the 1st story. at the 2nd and 3rd stories, observed vertical cracks throughout ornamental stone above windows, with sect

    Aug 17, 2026 · Penalty $2,500

    Active
  • Class - 2

    Construction work was detected on the ground floor being performed without the required permit, involving the framing of additional walls and the replacement of plywood for subfloors., obtain all permits

    Jan 23, 2025 · Penalty $1,250

    Active
  • Class - 2

    During the inspection, a significant crack was discovered in the stairwell above the basement door, along with a fence overhanging the roof at the first exposure. these findings indicate safety hazards and viol

    Jan 23, 2025 · Penalty $625

    Active
  • Class - 2

    During the inspection, it was noted that electrical work was being installed at ground level. bx cords were seen running from the cellar, through the subfloor, and into the ground floor. what are the proper per

    Jan 23, 2025 · Penalty $400

    Active
  • Class - 1

    Atoi observed electrical work without a permit on top floor front apt,no permit on file. new outlets installed in room jumped from outlet beside switch, obtain permit; obtain permit

    Nov 25, 2024 · Penalty $1,250

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Aug 24, 2026 · Apt 1A

    Close
  • Plumbing

    Basin/sink

    Aug 24, 2026 · Apt 1A

    Close
  • Appliance

    Electric/gas range

    Aug 24, 2026 · Apt 1A

    Close
  • Electric

    Power outage

    Aug 13, 2026 · Apt BLDG

    Close
  • Electric

    No lighting

    Aug 13, 2026 · Apt BLDG

    Close
  • Door/window

    Door

    Aug 13, 2026 · Apt BLDG

    Close
  • General

    Mailbox

    Aug 13, 2026 · Apt G2

    Close
  • General

    Signage missing

    Aug 13, 2026 · Apt BLDG

    Close
  • Door/window

    Door

    Aug 13, 2026 · Apt BLDG

    Close
  • Electric

    Power outage

    Aug 13, 2026 · Apt BASEME

    Close
Show 40 more ↓
  • General

    Bell/buzzer/intercom

    Aug 13, 2026 · Apt BASEME

    Close
  • Heat/hot water

    Entire building

    Feb 12, 2026 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt 1

    Close
  • Paint/plaster

    Wall

    Jan 30, 2026 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Jan 30, 2026 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Jan 30, 2026 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Jan 30, 2026 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Jan 30, 2026 · Apt 1

    Close
  • Appliance

    Electric/gas range

    Jan 30, 2026 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Jan 30, 2026 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Jan 20, 2026 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Jan 15, 2026 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Jan 8, 2026 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Aug 25, 2025 · Apt GROUND

    Close
  • Door/window

    Window pane

    Aug 25, 2025 · Apt GROUND

    Close
  • Plumbing

    Basin/sink

    Aug 25, 2025 · Apt GROUND

    Close
  • Unsanitary condition

    Mold

    Aug 25, 2025 · Apt GROUND

    Close
  • Door/window

    Window frame

    Aug 25, 2025 · Apt GROUND

    Close
  • Unsanitary condition

    Pests

    Aug 25, 2025 · Apt GROUND

    Close
  • Flooring/stairs

    Floor

    Aug 25, 2025 · Apt GROUND

    Close
  • Unsanitary condition

    Pests

    Aug 25, 2025 · Apt GROUND

    Close
  • General

    Signage missing

    Aug 25, 2025 · Apt GROUND

    Close
  • Plumbing

    Basin/sink

    Aug 25, 2025 · Apt GROUND

    Close
  • Flooring/stairs

    Floor

    Aug 25, 2025 · Apt GROUND

    Close
  • Safety

    Window guard broken/missing

    Aug 25, 2025 · Apt GROUND

    Close
  • Electric

    Wiring

    Aug 25, 2025 · Apt GROUND

    Close
  • Electric

    Wiring

    Aug 25, 2025 · Apt GROUND

    Close
  • Electric

    Outlet/switch

    Aug 25, 2025 · Apt GROUND

    Close
  • Flooring/stairs

    Floor

    Aug 25, 2025 · Apt GROUND

    Close
  • General

    Bell/buzzer/intercom

    Aug 25, 2025 · Apt GROUND

    Close
  • Electric

    Wiring

    Aug 25, 2025 · Apt GROUND

    Close
  • General

    Mailbox

    Aug 25, 2025 · Apt GROUND

    Close
  • Flooring/stairs

    Floor

    Aug 25, 2025 · Apt GROUND

    Close
  • Paint/plaster

    Ceiling

    Aug 25, 2025 · Apt GROUND

    Close
  • Flooring/stairs

    Floor

    May 9, 2025 · Apt G2

    Close
  • Door/window

    Window frame

    May 9, 2025 · Apt G2

    Close
  • Door/window

    Window pane

    May 9, 2025 · Apt G2

    Close
  • Electric

    Power outage

    Apr 22, 2025 · Apt GROUND

    Close
  • Flooring/stairs

    Floor

    Apr 22, 2025 · Apt GROUND

    Close
  • Paint/plaster

    Wall

    Apr 22, 2025 · Apt GROUND

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
One-family home (A5)
Year built
1901
Floors
3
Residential units
1
Building area
3,008 ft²
Lot area
1,666 ft²
Zoning
R6
Community board
201
Council district
8
Block / lot
2280 / 69
Assessed value
$61,800
Landmark / historic district
No

HPD registration #211790, last renewed Jul 1, 2026.

Questions about 423 East 135 Street

Who owns 423 East 135 Street?

The owner of record in NYC Department of City Planning PLUTO data is 423 E 135th LLC.

Does 423 East 135 Street have violations?

Yes. NYC HPD has recorded 71 housing violations at this property.

Is 423 East 135 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 423 East 135 Street built?

City records list 1901 as the year it was built.

How many apartments are in 423 East 135 Street?

It has 1 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.