Owner of record: NYC Administration For Childrens Services

560 Brook Avenue is a government building built in 1993 in Bronx, 10455. The owner of record is NYC Administration For Childrens Services. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
97
ECB violations
37
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 97

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Construction other optional

    Structure rendered non-compliant at time of inspection damage observed to have been sustained to sidewalk shed at exposure #1 due to vehicle impact at 567 east 149th street

    Jun 6, 2021

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
Show 40 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 6, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 6, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 22, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 22, 2016

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 7, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 7, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 7, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 7, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 9, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 9, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 22, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 22, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 2, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 2, 2010

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 5, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 5, 2008

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Marquee other required

    Cmq-marquee other required

    Mar 20, 2007

    Dob violation - dismissed
  • Marquee other required

    Cmq-marquee other required

    Mar 20, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed

ECB violations · 37

  • Class - 2

    No en drawing and architectural drawing approved from dob for phase#1 provided on the job site at the time of inspection., maintain/display required documents; contact via email: energycodeinspections@buildings

    Jun 18, 2026 · Penalty $1,250

    Active
  • Class - 2

    I found a weil mclain 688 hot water boiler not operational/correct all violating condition/submit certificate of correction

    Aug 11, 2025 · Penalty $1,250

    Active
  • Class - 2

    Re-issue #35688738m. failure to maintain building in code-compliant manner. noted: on the hoist side there are 3 areas with vertical cracks.crack extends from top wall down to the transition point. remedy: repa

    Aug 8, 2025 · Penalty $3,125

    Active
  • Class - 2

    Reissue: 35674769h-failure to maintain building in code-compliant manner: on the hoist side here are 3 areas with vertical cracks. crack extends from top wall down to the transition point. remedy: comply with c

    Nov 18, 2024 · Penalty $1,562

    Active
  • Class - 2

    Reissue #35563856p. failure to maintain building in code-compliant manner. at time of inspection i observed at westchester avenue side crackin 3 areas of the wall and cap stone moved hanging over wall at end of

    May 15, 2023 · Penalty $1,562

    Active
  • Class - 2

    A 3 story nb active site. i observed shed in place at exp#1. upon further inspection observed shed contrary to plans missing parapet signage also shed not extended 16 ft height over driveway entrance also missi

    Jan 27, 2023 · Penalty $625

    Resolve
  • Class - 2

    A 3 story nb active site of a nypd precinct. i observed temporary construction equipment in place. pipe scaffolding attached to 2 i beams bolted in to floor and attached to cmu wall inside of elevator shaft at

    Jan 27, 2023

    Resolve
  • Class - 1

    Failure to notify dept of accident incident that resulted in fatality or injury note:worker injured when working on concrete shower base worker cut his finger worker went to hosp.as per check of dept records pe

    Apr 18, 2022

    Resolve
  • Class - 1

    Bc3301.13.1 superintendent failed to provide site safety plan(lowrise)local las 81 of 2017-no site safety plan onsite for excavation of water tanks.noted:at time of inspection of 3 story nypd precinct observed

    Apr 8, 2022 · Penalty $625

    Resolve
  • Class - 2

    Bc3309.1 failure to protect adjoining property-no/missing/inadequate roof protection of adjoining property at exp #2.noted:at time of inspection of 3 story nb nypd precinct active jobsite observed no/missin/ina

    Apr 8, 2022 · Penalty $625

    Resolve
Show 27 more ↓
  • Class - 1

    Failure to maintain/display onsite documents required by bc chapter 33-no details provided for support of excavation.noted:at time of inspection of 3 stroy nypd precinct observed excavation work taking place at

    Apr 8, 2022 · Penalty $625

    Resolve
  • Class - 1

    Bc3304.4.4 failure to provide guardrails around excavation when 6 feet or greater in depth-no/missing/inadequate guardrails on site.noted:at time of inspection of 3 story nb nypd precinct active jobsite observe

    Apr 8, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    3307.2.1 permit holder failed to renew dot permit for obstruction of streets and sidewalks.inspection of a 3 story new building currently atroof level work in progress.observed that the permit holder occupied i

    Mar 30, 2022 · Penalty $625

    Resolve
  • Class - 1

    3314.1 failure to provide/maintain safety measures(scaffold)inspectionof a 3 story new building work in progress currently at roof level.observed pipe scaffold on job site with missing toe boards,guardrails,and

    Mar 30, 2022 · Penalty $250

    Resolve
  • Class - 2

    Condition of fence note:at the time of inspection observed a nb under construction at roof level.also observed after car impact happen at 06/06/2021 portion of construction fence(permit#x00073792-fn)broken at e

    Jun 7, 2021

    Resolve
  • Class - 2

    Bc 3307.6.5 missing debri netting sws and fence top.note:at the time of inspection observed a nb under construction at roof level.workers working on it.also observed a hd sws at exposure one.observed gap about

    Jun 7, 2021

    Resolve
  • Class - 1

    Failure to notify the dept of an accident/incident that resulted in a fatality or an injury.a worker suffered a laceration to his left hand when he was using a skilsaw to cut a piece of plywood.the worker was

    Oct 14, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain(rebar caps)note:at the time of my inspection of a 3 story near building(steel)job site with work in progress.in responded to a complain that an individual get injured while using a saw.i obs

    Sep 11, 2020

    Resolve
  • Class - 1

    Work does not conform to approved construction documents.note:at the time of my inspection of a 3 story new building (steel)job site with work in progress responded to a complain that an individual get injured

    Sep 11, 2020 · Penalty $625

    Resolve
  • Class - 1

    Failure to communicate required information during site safety orientation or refresher.note:at the time of my inspection of an 3 story building with active work in place.i responding to a complain where a work

    Sep 11, 2020 · Penalty $625

    Resolve
  • Class - 1

    Permit holder failed to ensure workers pre shift safety meetings with content.note:at the them or my inspection responding to a complaint where a workers was injured use my a skill.saw at basement level.upon r

    Sep 11, 2020 · Penalty $625

    Resolve
  • Class - 1

    Failure to safeguard all person and property affected by construction operations.note:at the time of my inspection responding to a complaintwhere superintendent reported a work got cut with a skillsaw while mak

    Sep 11, 2020 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. westchester ave side crack in 3 areas of the wall & cap stone moved hanging over wall at end of wall. also cracking on east 150th st side cracked above burger

    Apr 23, 2020 · Penalty $625

    Active
  • Class - 1

    Construction superintendent failed to perform duties per code.at the time of inspection at a 3 story nb,i observed when reviewing the superintendent daily logs sheets last signed log was january 20th 2020 dob&

    Feb 29, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    3307.2.1:failure to comply with dot regulation as per 34 rcny 2-05 and admin code provisions 19-107,19-108 or 19-121 at the time of my inspection of a proposed 3 story new building i observed dot approved traff

    Aug 23, 2019 · Penalty $620

    Resolve
  • Class - 1

    Failure to notify the dept prior to commencement of earthwork"expired"i observed an active const site w/excavation work in progress.the contractor continue preform excavation in progress after search on bis & c

    Apr 2, 2019

    Resolve
  • Class - 1

    Work does not conform to approved const docs &/or approved amendments.observed an active const site w/excavation:"soe" work in progress during insp noted the follow:1)soldier pile #24 has install 10x89 not acco

    Apr 2, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Work does not conform to approved const docs &/or approved amendments.i obsreved an active const site w/excavation"soe" work in progress,during insp.at exp #2 contractor has perform underpinning work &are not f

    Apr 2, 2019 · Penalty $625

    Resolve
  • Class - 1

    Failure to protect adjoining structures during excavation ops.i observed an active const site w/excavation work in progress during insp noted:1)@ exp #1 on e 149 st roadway & sidewalk has separation & settlemen

    Apr 2, 2019

    Resolve
  • Class - 1

    3309.11failure to protect adequately protect adjoining trees.at time of insp observed an active const site w/excavation work on progress,during insp noted on front of const @tress is unprotected.this poses a s

    Apr 2, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Expired permit.at time of insp,i observed an active const site w/excavation work in progress,during insp noted after search on bis system that the permit #220579158-nb has expired 3/27/19.comply w/code renew pe

    Apr 2, 2019 · Penalty $625

    Resolve
  • Class - 2

    Respondent failed to make proper notification for mobile crone after 5-1-18 to the dept. mobile crone cn#1018/18 cd#4025 arrived at 556 brook ave on 9-18-18 & departed but did not notify the dept of its departu

    Feb 19, 2019 · Penalty $5,000

    Resolve
  • Hazardous

    Failure to safeguard public & property in that during demo operation the entire top 2 section of scaffold erected on east side of building fell onto railroad which located below said side of building. remedy: s

    Jun 1, 1993 · Penalty $1,500

    Resolve
  • Hazardous

    Failure to provide 24 hr. notice at time of inspection demolition has started on roof parapits. no 24 hr. notice given this office. prior tostart. remedy: always provide 24 hr. notice prior to starting of demol

    Apr 28, 1993 · Penalty $500

    Resolve
  • Hazardous

    Demo in an unsafe manner: west sideroof & wall been demo with entire bulkhead section been removed first. demo operation is not proceeding in an systematic manner as per code. remedy: conduct demo in a safe man

    Apr 28, 1993 · Penalty $2,000

    Resolve
  • Hazardous

    Failure to provide safety netting for scaffold: pipe scaffold erected approx 25; has no debris netting on exterior of scaffold and plank section doen't have toe board. scaffold was erected on side of bldg facin

    Apr 28, 1993 · Penalty $1,000

    Resolve
  • Non-hazardous

    Failure to maintain: defect is brick work is broken large crack at brick masonry and concrete floor slat in vic inilty of large compressor. remedy: have professional engineer check conditions and notify to dept

    Jul 6, 1988 · Penalty $200

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Government building (Y3)
Year built
1993
Floors
2
Residential units
—
Building area
36,868 ft²
Lot area
147,967 ft²
Zoning
M1-1
Community board
201
Council district
17
Block / lot
2276 / 1
Assessed value
$15,214,050
Landmark / historic district
No

Questions about 560 Brook Avenue

Who owns 560 Brook Avenue?

The owner of record in NYC Department of City Planning PLUTO data is NYC Administration For Childrens Services.

Does 560 Brook Avenue have violations?

NYC HPD has no housing violations on record for this property.

Is 560 Brook Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 560 Brook Avenue built?

City records list 1993 as the year it was built.