roofy

510 East 146 Street

Bronx, NY 10455BBL 2-02272-0005Map

Owner of record: Betances Rad LLC

510 East 146 Street is an elevator apartment building built in 1970 in Bronx, 10455. It has 139 residential units across 6 floors. The owner of record is Betances Rad LLC. HPD has recorded 179 housing violations here, most recently on September 14, 2026. 4 of the 50 most recent violations are still open.

HPD violations
179
DOB violations
49
ECB violations
18
HPD complaints
325

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 14, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 179

  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1c, 1st story, 1st apartment from north at east

    Sep 14, 2026 · Apt 1C

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1c, 1st story, 1st apartment from north at east

    Sep 14, 2026 · Apt 1C

    Open — Civ14 mailed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1c, 1st story, 1st apartment from north at east

    Sep 14, 2026 · Apt 1C

    Open — Nov certified on time
  • C

    Properly repair or replace the broken or defective glass pane building entrance door , 1st story

    Aug 10, 2026

    Open — Nov certified on time
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Jul 29, 2026

    Closed — Violation closed
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at all stories, all balconies and all components at fire escape at south exterior wall (building front)

    Jul 29, 2026

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 6f, 6th story

    Jun 3, 2026 · Apt 6F

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 6f, 6th story

    Jun 3, 2026 · Apt 6F

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at hopper door at public hall, 6th story

    Jun 3, 2026

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east

    Jun 2, 2026 · Apt 2A

    Closed — Violation closed
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east

    Jun 2, 2026 · Apt 2A

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at hopper chute at public hall, 5th story

    Apr 19, 2026

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less then 10 square feet at north wall in the 1st room from north at east located at apt 1h, 1st story, 1st apartment from south at west

    Apr 19, 2026 · Apt 1H

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the kitchen located at apt 1h, 1st story, 1st apartment from south at west

    Apr 19, 2026 · Apt 1H

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the kitchen located at apt 1h, 1st story, 1st apartment from south at west

    Apr 19, 2026 · Apt 1H

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Mar 20, 2026

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system paper sign in lieu metal at public hall, 1st story

    Mar 20, 2026

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 3rd apartment from south at west

    Mar 5, 2026 · Apt 4A

    Closed — Violation dismissed
  • B

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods dropladder fullly decended to ground at east exterior wall at fire escape

    Mar 5, 2026

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Mar 5, 2026

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from north at west located at apt 3d , 3rd story, 1st apartment from north at east

    Mar 5, 2026 · Apt 3D

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq feet at ceiling in the bathroom located at apt 3d , 3rd story, 1st apartment from north at east

    Mar 5, 2026 · Apt 3D

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the 1st room from north at east located at apt 3d , 3rd story, 1st apartment from north at east

    Mar 5, 2026 · Apt 3D

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at hopper door at west wall at public hall, 4th story

    Mar 5, 2026

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5j, 5th story, 2nd apartment from east at south

    Jan 20, 2026 · Apt 5J

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Jan 20, 2026

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate at west wall in the kitchen located at apt 1h, 1st story, 1st apartment from west at north

    Dec 23, 2025 · Apt 1H

    Closed — Violation closed
  • C

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet at water closet in the bathroom located at apt 2g, 2nd story, 1st apartment from west at north

    Dec 23, 2025 · Apt 2G

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1h, 1st story, 1st apartment from west at north

    Dec 23, 2025 · Apt 1H

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1h, 1st story, 1st apartment from west at north

    Dec 23, 2025 · Apt 1H

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinge at bulkhead door at east section at public hall, 6th story

    Dec 15, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the 4th room from east located at apt 3b, 3rd story, 1st apartment from south at west

    Nov 12, 2025 · Apt 3B

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1h, 1st story, 1st apartment from north at east

    Nov 4, 2025 · Apt 1H

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and all walls in the 2nd room from east located at apt 1h, 1st story, 1st apartment from north at east

    Nov 4, 2025 · Apt 1H

    Closed — Violation dismissed
  • B

    Remove all obstructions and repair all defects in wasteline at sink in the kitchen located at apt 1h, 1st story, 1st apartment from north at east

    Nov 4, 2025 · Apt 1H

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at hopper door , 4th story

    Oct 9, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective door hinges at staircase 'a' at public hall stairs, 2nd story

    Oct 6, 2025

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective marble saddle in the entrance located at apt 1h, 1st story, 1st apartment from west at north

    Sep 29, 2025 · Apt 1H

    Closed — Violation closed
  • B

    Repair the broken or defective connection at drain line at sink in the kitchen located at apt 1h, 1st story, 1st apartment from west at north

    Sep 29, 2025 · Apt 1H

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 2g, 2nd story, 2nd apartment from south at west

    Sep 9, 2025 · Apt 2G

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the kitchen located at apt 2g, 2nd story, 2nd apartment from south at west

    Sep 9, 2025 · Apt 2G

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak over the ceiling and behind south wall in the bathroom located at apt 2g, 2nd story, 2nd apartment from south at west

    Sep 9, 2025 · Apt 2G

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroom located at apt 2g, 2nd story, 2nd apartment from south at west

    Sep 9, 2025 · Apt 2G

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1h, 1st story, 1st apartment from west at north

    Sep 3, 2025 · Apt 1H

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1h, 1st story, 1st apartment from west at north

    Sep 3, 2025 · Apt 1H

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10sqft at closet walls in the 2nd room from north located at apt 1h, 1st story, 1st apartment from west at north

    Sep 3, 2025 · Apt 1H

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1h, 1st story, 1st apartment from west at north

    Sep 3, 2025 · Apt 1H

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt 1h, 1st story, 1st apartment from west at north

    Sep 3, 2025 · Apt 1H

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at fire door stair ''a'' at public hall, 2nd story

    Aug 31, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at hopper door at public hall, 2nd story

    Aug 31, 2025

    Closed — Violation closed

DOB building violations · 49

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
Show 39 more ↓
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 9, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 9, 2020

    Dob violation - resolved
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Nov 12, 2018

    Dob violation - dismissed
  • Nycha elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Jun 1, 2016

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7c technical report by 02/21/2013

    Dec 31, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Jan 18, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Aug 8, 2002

    Dob violation - dismissed
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Aug 8, 2002

    Dob violation - dismissed
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Aug 8, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed
  • Elevator elevatorrequired

    74.replace missing governor cover 74 renew damaged car floor covering

    Aug 28, 1990

    Dob violation - resolved

ECB violations · 18

  • Class - 2

    Failure to maintain approved hardware at the required secondary means of egress. at the time of inspection, a gate at exposure 1 was equipped with a lockable locking mechanism restricting free egress from the r

    Jun 24, 2026

    Resolve
  • Class - 2

    Hoist ropes rusting, change ropes; pit dirty ; clean pit;pit light not working;repair

    Feb 24, 2023

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner at the time of inspection observed broken steps on the fire escape between 3rd and fourth floor and between fourth and fifth floor a total of four steps loc

    Jul 21, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    3307.6.5 failure to maintain adequate illumination beneath sidewalk shed as required by code. sidewalk shed erected under job #240120070,along exp2 west elevation had not adequate artificial illumination provid

    Dec 31, 2015

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations rem:

    Apr 15, 2011

    Resolve
  • Class - 2

    Fail to file an acceptable 6th round technical report in compliance w/code provisions:periodic insp of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations 36007871l.rem:fi

    Jul 8, 2010

    Resolve
  • Class - 2

    Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Jan 23, 2009

    Resolve
  • Class - 2

    Failure to submit an acceptable 5th rd technical report in compliance w/code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations. remedy

    Oct 17, 2008

    Resolve
  • Hazardous

    Failure to submit a 5th round technical report in compliance w/code provisions: periodic inspection of exterior walls & appurtenances asreq uired by local law 11 of 1998 & the dept. of bldgs rules & regulations

    Jan 25, 2008

    Resolve
  • Non-hazardous

    B4a,36,50a,b,bq9.note:work w/o a permit 27-147(bq9)-new weil mclain boiler gas fired installed & operating w/o boiler gas fired installed & nyc dept of bldgs.50a-safety or relief valve not installed upright pos

    May 15, 2007

    Resolve
Show 8 more ↓
  • Non-hazardous

    B4a,bq9,36,50a,b.note:work w/o a permit 27-147(bq9):new weil mclain boiler gas fired installed & operating w/o boiler work permit(bl)from nyc dob.50a-safety or relief valve nto installed upright position.50b-ne

    May 15, 2007

    Resolve
  • Non-hazardous

    Failure to submit a 5th round technical report in compliance w/ code provisions:periodic inspection of exterior walls & appurtenances as required by local law 11 of 1998 & the dob rules & regulations.

    Aug 11, 2006

    Resolve
  • Non-hazardous

    Failure to submit a fifth round technical report in compliance w/ codeprovisions:periodic inspection of exterior walls & appurtenances as required by local law 11 of 1998 & the dob rules & regulations.

    Jun 30, 2006

    Resolve
  • Non-hazardous

    Failure to submit a fifth round technical report in compliance w/ codeprovisions:periodic inspection of exterior walls & appurtenances as required by local law 11 of 1998 & the dob rules & regulations.

    Jun 30, 2006

    Resolve
  • Non-hazardous

    Failure to submit a fifth round technical report in compliance w/ codeprovisions:periodic inspection of exterior walls & appurtenances as reuired by local law 11 of 1998 & the dob rules & regulations.

    Jun 30, 2006

    Resolve
  • Non-hazardous

    Failure to submit a fifth round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenancesas required by local law 11 of 1998 & the dept of bldgs rules & regul-

    Dec 9, 2005

    Resolve
  • Non-hazardous

    Failure to submit a fifth round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenancesas required by local law 11 of 1998 & the dept of bldgs rules & regul-

    Dec 9, 2005

    Resolve
  • Non-hazardous

    Failure to submit a fifth round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenancesas required by local law 11 of 1998 & the dept of bldgs rules & regul-

    Dec 9, 2005

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Oct 6, 2026 · Apt 6F

    Close
  • Water leak

    Slow leak

    Sep 9, 2026 · Apt 1C

    Close
  • Unsanitary condition

    Mold

    Sep 9, 2026 · Apt 1C

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 27, 2026 · Apt 5C

    Close
  • Safety

    Window guard broken/missing

    Jul 20, 2026 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Jun 4, 2026 · Apt 6C

    Close
  • Water leak

    Heavy flow

    Jun 1, 2026 · Apt 2A

    Close
  • Paint/plaster

    Ceiling

    Jun 1, 2026 · Apt 2A

    Close
  • Water leak

    Heavy flow

    Jun 1, 2026 · Apt 2A

    Close
  • Paint/plaster

    Ceiling

    Jun 1, 2026 · Apt 2A

    Close
Show 40 more ↓
  • Water leak

    Slow leak

    Jun 1, 2026 · Apt 2A

    Close
  • Water leak

    Slow leak

    Jun 1, 2026 · Apt 2A

    Close
  • Paint/plaster

    Ceiling

    Jun 1, 2026 · Apt 2A

    Close
  • Unsanitary condition

    Mold

    May 26, 2026 · Apt 6F

    Close
  • Heat/hot water

    Apartment only

    Mar 4, 2026 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Mar 2, 2026 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Feb 5, 2026 · Apt 5C

    Close
  • Door/window

    Window frame

    Feb 5, 2026 · Apt 5C

    Close
  • Heat/hot water

    Apartment only

    Feb 5, 2026 · Apt 5C

    Close
  • Heat/hot water

    Apartment only

    Feb 4, 2026 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Feb 4, 2026 · Apt 2F

    Close
  • Plumbing

    Bathtub/shower

    Feb 4, 2026 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2026 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2026 · Apt 5C

    Close
  • Appliance

    Refrigerator

    Jan 26, 2026 · Apt APT5C

    Close
  • Heat/hot water

    Apartment only

    Jan 21, 2026 · Apt 1F

    Close
  • Water leak

    Slow leak

    Dec 19, 2025 · Apt 1H

    Close
  • Water leak

    Heavy flow

    Dec 19, 2025 · Apt 1H

    Close
  • Heat/hot water

    Entire building

    Dec 13, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 13, 2025 · Apt 6H

    Close
  • Heat/hot water

    Apartment only

    Dec 13, 2025 · Apt 3J

    Close
  • Water leak

    Slow leak

    Dec 5, 2025 · Apt 1H

    Close
  • Water leak

    Heavy flow

    Dec 5, 2025 · Apt 1H

    Close
  • Plumbing

    Toilet

    Nov 26, 2025 · Apt 6F

    Close
  • Water leak

    Heavy flow

    Nov 6, 2025 · Apt 3B

    Close
  • Paint/plaster

    Ceiling

    Nov 6, 2025 · Apt 3B

    Close
  • Plumbing

    Basin/sink

    Nov 4, 2025 · Apt 1H

    Close
  • Paint/plaster

    Wall

    Nov 4, 2025 · Apt 1H

    Close
  • Heat/hot water

    Apartment only

    Oct 24, 2025 · Apt 3J

    Close
  • Door/window

    Door

    Sep 24, 2025 · Apt 1H

    Close
  • Water leak

    Heavy flow

    Sep 24, 2025 · Apt 1H

    Close
  • General

    Cabinet

    Sep 24, 2025 · Apt 1H

    Close
  • Plumbing

    Basin/sink

    Sep 24, 2025 · Apt 1H

    Close
  • Paint/plaster

    Wall

    Sep 24, 2025 · Apt 1H

    Close
  • Water leak

    Slow leak

    Aug 27, 2025 · Apt 1C

    Close
  • Unsanitary condition

    Mold

    Aug 20, 2025 · Apt 2G

    Close
  • Heat/hot water

    Entire building

    Aug 17, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Aug 11, 2025 · Apt 1H

    Close
  • Plumbing

    Basin/sink

    Jul 30, 2025 · Apt 3J

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1970
Floors
6
Residential units
139
Building area
213,500 ft²
Lot area
60,450 ft²
Zoning
R6
Community board
201
Council district
8
Block / lot
2272 / 5
Assessed value
$6,514,200
Landmark / historic district
No

HPD registration #227352, last renewed Jul 14, 2026.

Questions about 510 East 146 Street

Who owns 510 East 146 Street?

The owner of record in NYC Department of City Planning PLUTO data is Betances Rad LLC.

Does 510 East 146 Street have violations?

Yes. NYC HPD has recorded 179 housing violations at this property.

Is 510 East 146 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 510 East 146 Street built?

City records list 1970 as the year it was built.

How many apartments are in 510 East 146 Street?

It has 139 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.