roofy

282 Brook Avenue

Bronx, NY 10454BBL 2-02267-0003Map

Owner of record: Brook-Sharp Realty Ll

282 Brook Avenue is a walk-up apartment building built in 1906 in Bronx, 10454. It has 15 residential units across 5 floors. The owner of record is Brook-Sharp Realty Ll. HPD has recorded 220 housing violations here, most recently on September 26, 2026. 24 of the 50 most recent violations are still open.

HPD violations
220
DOB violations
4
ECB violations
2
HPD complaints
444

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 26, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 220

  • B

    Remove all encumbrances consisting of garbage bags and household items at public hall, 1st story

    Sep 26, 2026

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective latch and its assemblies at apartment entrance door in the entrance located at apt 5a, 5th story, 1st apartment from north at east

    Sep 26, 2026 · Apt 5A

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective bell buzzer/intercom system from building entrance to apartment wall panel at north wall in the entire apartment located at apt 5a, 5th story, 1st apartment from north at east

    Sep 26, 2026 · Apt 5A

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective vinyl floor tile in the kitchen located at apt 5a, 5th story, 1st apartment from north at east

    Sep 26, 2026 · Apt 5A

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 5a, 5th story, 1st apartment from north at east

    Sep 26, 2026 · Apt 5A

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective cabinet at wash base at sink in the bathroom located at apt 5a, 5th story, 1st apartment from north at east

    Sep 26, 2026 · Apt 5A

    Open — Nov sent out
  • B

    Repair the broken or defective connection waste drain pipe at wash base in the bathroom located at apt 5a, 5th story, 1st apartment from north at east

    Sep 26, 2026 · Apt 5A

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 5a, 5th story, 1st apartment from north at east

    Sep 26, 2026 · Apt 5A

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 5a, 5th story, 1st apartment from north at east

    Sep 26, 2026 · Apt 5A

    Open — Nov sent out
  • B

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at fire escape in front of building at fire escape

    Sep 26, 2026

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair or replace the broken or defective lock and assembly at building entrance door , 1st story

    Apr 29, 2026

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building entrance , 1st story

    Apr 29, 2026

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch and asssembly at building entrance door, (street to vestibule) , 1st story

    Mar 1, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at building entrance door (street to vestibule) , 1st story

    Mar 1, 2026

    Closed — Violation closed
  • A

    Provide and maintain a light directly over the mail boxes in public hall vestibule , 1st story

    Mar 1, 2026

    Open — Invalid certification
  • B

    Provide at ceramic tiles at west wall in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east

    Mar 1, 2026 · Apt 3A

    Open — Nov certified late
  • B

    Properly repair with similar material the broken or defective at vinyl tiles in the kitchen located at apt 3a, 3rd story, 1st apartment from north at east

    Mar 1, 2026 · Apt 3A

    Open — Nov certified late
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchen located at apt 3a, 3rd story, 1st apartment from north at east

    Mar 1, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... more than 10 sq. ft. at ceiling, and west wall and less than 30 sq. ft. , inside cabinet, at upper cabinets in the kitchen located at apt 3a, 3rd story, 1st apartment from north at east

    Mar 1, 2026 · Apt 3A

    Open — Violation will be reinspected
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 3a, 3rd story, 1st apartment from north at east

    Mar 1, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at the bathtub in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east

    Mar 1, 2026 · Apt 3A

    Open — Nov certified late
  • B

    Properly repair or replace the broken or defective buzzer intercommunication system, from the building entrance to the panel on the south wall in the foyer located at apt 3a, 3rd story, 1st apartment from north at east

    Mar 1, 2026 · Apt 3A

    Open — Nov certified late
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the walls and ceiling in the 2nd room from east at north located at apt 3a, 3rd story, 1st apartment from north at east

    Mar 1, 2026 · Apt 3A

    Open — Nov certified late
  • B

    Properly repair with similar material the broken or defective chaulking around window casing in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east

    Mar 1, 2026 · Apt 3A

    Open — Nov certified late
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building entrance self closing door , 1st story

    Jun 11, 2025

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch at building entrance self closing door , 1st story

    Jun 11, 2025

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 3a, 3rd story, 1st apartment from north at east

    Jan 5, 2025 · Apt 3A

    Closed — Violation dismissed
  • B

    Repair the broken or defective connection at sink wasteline in the kitchen located at apt 3a, 3rd story, 1st apartment from north at east

    Jan 5, 2025 · Apt 3A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department north, south, east and west walls in the 1st room from east located at apt 3a, 3rd story, 1st apartment from north at east

    Jan 5, 2025 · Apt 3A

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective heavy duty lock latch and assembly at building entrance door (from street to vestibule) at public hall, 1st story

    Nov 24, 2024

    Open — Nov certified late
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at building entrance door (from street to vestibule) at public hall, 1st story

    Nov 24, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinge at public hall, 1st story

    Jun 12, 2024

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2024

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective locking device at building entrance door , 1st story

    Dec 18, 2023

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... approx 2sq ft at east wall in the 1st room from east located at apt 3a, 3rd story, 1st apartment from east at south

    Nov 8, 2023 · Apt 3A

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system locked door at boiler room

    Nov 8, 2023

    Open — Not complied with
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south

    Nov 8, 2023 · Apt 3A

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 16, 2023

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system basement door locked at boiler room

    Oct 18, 2022

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south

    Oct 18, 2022 · Apt 3A

    Closed — Violation closed
  • B

    Replace with new the broken or defective glass pane at lower sash at west wall , 1st story

    Aug 10, 2022

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 10, 2021 · Apt 3A

    Closed — Violation dismissed
  • A

    Refit the lower sash window in the 1st room from east located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 10, 2021 · Apt 3A

    Closed — Violation dismissed
  • A

    Properly repair the broken or defective intercom system from building entrance to in the foyer located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 10, 2021 · Apt 3A

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 10, 2021 · Apt 3A

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 10, 2021 · Apt 3A

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective handle at shutoff valve at radiator at east wall in the 1st room from east located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 10, 2021 · Apt 3A

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the 2nd room from east located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 10, 2021 · Apt 3A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 10, 2021 · Apt 3A

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling and walls in the 1st room from east located at apt 3a, 3rd story, 1st apartment from north at east

    Dec 10, 2021 · Apt 3A

    Closed — Violation dismissed

DOB building violations · 4

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 1, 2014

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed

ECB violations · 2

  • Class - 1

    Faiure to provide unobstructed exit passageway. the front area way hasbeen paved reducing the head height from the rear yard to the street preventing a safe egress, from rear fire escape to the street. remedy:

    Sep 17, 2013 · Penalty $500

    Resolve
  • Class - 1

    Work w/o a permit. the front area way has been paved reducing the headheight from the rear yard to the street, preventing a safe egress fromthe rear fire escape to the street. remedy: obtain permit.

    Sep 17, 2013

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Sep 24, 2026 · Apt 5A

    Open
  • Unsanitary condition

    Mold

    Sep 24, 2026 · Apt 5A

    Open
  • Water leak

    Slow leak

    Sep 24, 2026 · Apt 5A

    Open
  • Paint/plaster

    Wall

    Sep 24, 2026 · Apt 5A

    Open
  • Flooring/stairs

    Floor

    Sep 24, 2026 · Apt 5A

    Open
  • Plumbing

    Basin/sink

    Sep 24, 2026 · Apt 5A

    Open
  • General

    Bell/buzzer/intercom

    May 9, 2026 · Apt 2B

    Close
  • Plumbing

    Water supply

    May 9, 2026 · Apt 2B

    Close
  • Water leak

    Heavy flow

    Mar 25, 2026 · Apt 3A

    Close
  • Paint/plaster

    Wall

    Mar 25, 2026 · Apt 3A

    Close
Show 40 more ↓
  • Paint/plaster

    Wall

    Mar 11, 2026 · Apt 3A

    Close
  • Paint/plaster

    Ceiling

    Mar 6, 2026 · Apt 3A

    Close
  • Paint/plaster

    Wall

    Mar 6, 2026 · Apt 3A

    Close
  • Door/window

    Door

    Mar 3, 2026 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Feb 26, 2026 · Apt BASEME

    Close
  • Water leak

    Slow leak

    Feb 9, 2026 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2025 · Apt 3A

    Close
  • Water leak

    Damp spot

    Jan 3, 2025 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Nov 22, 2024 · Apt 3A

    Close
  • Paint/plaster

    Wall

    Nov 22, 2024 · Apt 3A

    Close
  • Plumbing

    Basin/sink

    Nov 22, 2024 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    Nov 13, 2024 · Apt 3A

    Close
  • Door/window

    Door

    Nov 8, 2023 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Nov 4, 2023 · Apt 3A

    Close
  • Door/window

    Door

    Oct 16, 2023 · Apt 3B

    Close
  • Plumbing

    Water supply

    May 24, 2023 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Jan 9, 2023 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2022 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2022 · Apt 3A

    Close
  • Door/window

    Door

    Aug 2, 2022 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Mar 28, 2022 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Mar 8, 2022 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Mar 5, 2022 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Mar 4, 2022 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    Feb 28, 2022 · Apt 3A

    Close
  • Flooring/stairs

    Floor

    Jan 3, 2022 · Apt 3A

    Close
  • Door/window

    Window frame

    Jan 3, 2022 · Apt 3A

    Close
  • Plumbing

    Radiator

    Jan 3, 2022 · Apt 3A

    Close
  • Paint/plaster

    Wall

    Jan 3, 2022 · Apt 3A

    Close
  • Paint/plaster

    Ceiling

    Jan 3, 2022 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    Dec 29, 2021 · Apt 5C

    Close
  • Heat/hot water

    Entire building

    Dec 8, 2021 · Apt 3A

    Close
  • Paint/plaster

    Wall

    Dec 4, 2021 · Apt 3A

    Close
  • Paint/plaster

    Ceiling

    Dec 4, 2021 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Dec 4, 2021 · Apt 3A

    Close
  • Paint/plaster

    Ceiling

    Nov 27, 2021 · Apt 3A

    Close
  • Door/window

    Window frame

    Nov 27, 2021 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Nov 27, 2021 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Nov 27, 2021 · Apt 3A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1906
Floors
5
Residential units
15
Building area
15,570 ft²
Lot area
3,953 ft²
Zoning
R6
Community board
201
Council district
8
Block / lot
2267 / 3
Assessed value
$823,500
Landmark / historic district
No

HPD registration #215483, last renewed Jul 29, 2026.

Questions about 282 Brook Avenue

Who owns 282 Brook Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Brook-Sharp Realty Ll.

Does 282 Brook Avenue have violations?

Yes. NYC HPD has recorded 220 housing violations at this property.

Is 282 Brook Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 282 Brook Avenue built?

City records list 1906 as the year it was built.

How many apartments are in 282 Brook Avenue?

It has 15 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.