4230 Broadway
Manhattan, NY 10033BBL 1-02163-0028Map
Owner of record: 4230 Broadway LP
4230 Broadway is a mixed residential and retail building built in 1908 in Manhattan, 10033. It has 4 residential units across 3 floors. The owner of record is 4230 Broadway LP. HPD has recorded 63 housing violations here, most recently on April 1, 2021. 1 of the 50 most recent violations are still open.
- HPD violations
- 63
- DOB violations
- 4
- ECB violations
- 10
- HPD complaints
- 51
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 63
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
Properly secure the loose 13th marble tread from bottom up of 1st sty landing at public hall stairs, 1st story
Aug 15, 2019
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system at locked boiler room door at basement
Aug 15, 2019
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 2nd story, 1st apartment from south at west
Aug 15, 2019 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling light in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Aug 6, 2019 · Apt 1A
Open — Invalid certification - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement
Aug 6, 2019
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 2nd story
Aug 6, 2019 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 7, 2019
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor incorrect frame present at public hall, 1st story
Jan 7, 2019
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation cornice building front parpet wall at roof
Jan 7, 2019
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at basement
Mar 29, 2018
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
Mar 29, 2018 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair the broken or defective lock and assembly at the building entrance door at public hall, 1st story
Oct 15, 2015
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 1, 2015
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective light fixture at east wall at public hall stairs, 1st story
Aug 28, 2015
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall, 1st story
Aug 28, 2015
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of bicycles on 2nd and 3rd story at public hall
Jul 15, 2015
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective bulging ceiling with fire retardant material at public hall, 2nd story
Jul 15, 2015
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 2nd story
Jul 15, 2015
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 14, 2015
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective hand rail at public hall stairs, 1st story
Feb 11, 2015
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 2, 2015
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the public halls and stairs at all stories
Oct 1, 2014
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of a bicycle at the stairs leading to the 3rd story public hall at public hall, 3rd story
Oct 1, 2014
Closed — Violation closed - BHazardous
Provide a piece of garden hose 10 feet in length with female coupling and a 10 quart pail on premises to test sprinkler system. at public hall, 4th story
Oct 1, 2014
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of a bicycle at the stairs leading to the bulkhead at public hall
Oct 1, 2014
Closed — Violation closed - BHazardous
Properly secure the loose handrail at public hall stairs, 1st story
Oct 1, 2014
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1a, 2nd story, 1st apartment from north at east
Apr 9, 2014 · Apt 1A
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Apr 9, 2014 · Apt 1A
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). .. in the entire apartment located at apt 1a, 2nd story, 1st apartment from north at east
Apr 9, 2014 · Apt 1A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Apr 9, 2014 · Apt 1A
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 1a, 2nd story, 1st apartment from north at east
Apr 9, 2014 · Apt 1A
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1a, 2nd story, 1st apartment from north at east
Apr 9, 2014 · Apt 1A
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1a, 2nd story, 1st apartment from north at east
Mar 2, 2014 · Apt 1A
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1a, 2nd story, 1st apartment from north at east
Mar 2, 2014 · Apt 1A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Mar 2, 2014 · Apt 1A
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. in the entire apartment located at apt 1a, 2nd story, 1st apartment from north at east
Mar 2, 2014 · Apt 1A
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets bath tub in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Mar 2, 2014 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Mar 2, 2014 · Apt 1A
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required
May 17, 2010
Closed — Violation dismissed - BHazardous
Properly secure the loose washbasin in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Jun 27, 2008 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair the broken or defective mechanical ventilation in the kitchen located at apt 1a, 2nd story, 1st apartment from north at east
Jun 27, 2008 · Apt 1A
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1a, 2nd story, 1st apartment from north at east
Jun 27, 2008 · Apt 1A
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1a, 2nd story, 1st apartment from north at east
Jun 27, 2008 · Apt 1A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall, ceiling, north wall in the 1st room from east at south located at apt 1a, 2nd story, 1st apartment from north at east
Jun 27, 2008 · Apt 1A
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Jun 27, 2008 · Apt 1A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall, west wall, north wall, 1st door from east at south wall in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Jun 27, 2008 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1a, 2nd story, 1st apartment from north at east
Jun 27, 2008 · Apt 1A
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective at apartment enreance in the kitchen located at apt 1a, 2nd story, 1st apartment from north at east
Jun 27, 2008 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair the broken or defective base cabinet under sink in the kitchen located at apt 1a, 2nd story, 1st apartment from north at east
Jun 27, 2008 · Apt 1A
Closed — Violation closed
DOB building violations · 4
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 4, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 4, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 4, 2016
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 27, 2016
Dob violation - dismissed
ECB violations · 10
- Class - 1
Failure to maintain bldg in code compliant manner:lack of a system of automatic sprinklers where required. observation has been made at 9:45am that stairs leading to roof does not have proper sprinkler coverage
Jan 27, 2016
Resolve - Class - 2
Failure to secure support raceways cable assemblies boxes,cabinets fittings.electrical conduit in bsmt is not supported pipes are hanging down bsmt.rem:secure support per ec.
Jan 27, 2016 · Penalty $400
Resolve - Class - 1
Work w/o permit work noted: observation has been made at 9:30am that water,drainage,gas lines have been ran to sink,stove,wash machine,bath room for apts. under appliation 122620798 no plumbing permit has been
Jan 27, 2016 · Penalty $1,600
Resolve - Class - 2
Failure to maintain bldg in code compliant manner: service equipment boiler.observation has been made during a safety sweep at 9:50am inside boiler room spillswitch for the boiler flue gas was not installed.
Jan 27, 2016 · Penalty $250
Resolve - Class - 2
Failure to provide adequate circuit over current protection device perlabel.(1'0) thin conductor fused @200 amps service switch in bsmt.rem:provide adequate ovecurrent protection.
Jan 27, 2016 · Penalty $2,400
Resolve - Class - 2
Electrical work w/out a permit.observed @8am branch wiring circuit forswitches fixtures,outlets,panels,feeders installed in apts#2f,2r,3f & 3r.no app on file for new electrical work.rem:obtain permit.
Jan 27, 2016 · Penalty $400
Resolve - Class - 2
Failure to maintain bldg in code compliant manner: no fire stopping per bc 712.3; 27-345. at cellar ceiling- no fire stopping where requi red. rmdy: provide/maintain fire stopping.
Jan 27, 2016 · Penalty $250
Resolve - Class - 2
Failure to maintain building in code compliant manner observation has been made at 9:50am during a safety sweep that at cellar the main con trol valves for the sprinkler system are not chain locked open and sys
Jan 27, 2016 · Penalty $500
Resolve - Class - 2
Work w/o a permit, work noted: at 1st floor left installed water and waste lines for 3 sinks. at cellar leel left installed water and wastelines for 3pc bathroom (toilet) sink, shower. also at left installed
Jul 31, 2014 · Penalty $800
Resolve - Class - 2
Occupancy contrary to that allowed by the certificate of occupancy.certificate of occupancy co #47012 indicates: cellar: boiler room and storage, 1st story: one store illegal occupancy noted: 1st flr subdivided
Jul 31, 2014 · Penalty $1,200
Resolve
Complaints
- Plumbing
Water supply
Oct 13, 2026 · Apt 2B
Close - Plumbing
Bathtub/shower
Oct 13, 2026 · Apt 2B
Close - General
Mailbox
Mar 13, 2026 · Apt 1BMAIL
Close - Heat/hot water
Entire building
Apr 12, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
May 10, 2020 · Apt 1A
Close - Heat/hot water
Entire building
May 9, 2020 · Apt 1A
Close - Heat/hot water
Entire building
Dec 19, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 19, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 24, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 19, 2019 · Apt 2A
Close
Show 40 more ↓
- Heat/hot water
Entire building
Aug 12, 2019 · Apt 1B
Close - Heat/hot water
Entire building
Aug 1, 2019 · Apt 1A
Close - Heat/hot water
Entire building
Jun 19, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
May 18, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 27, 2019 · Apt 1B
Close - Heat/hot water
Entire building
Mar 28, 2018 · Apt 2A
Close - Heat/hot water
Entire building
Mar 21, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 21, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 20, 2018 · Apt BLDG
Close - Door/window
Door
Sep 20, 2015 · Apt FLR2
Close - Heat/hot water
Entire building
Sep 20, 2015 · Apt 2
Close - Electric
No lighting
Aug 24, 2015 · Apt BLDG
Close - Electric
No lighting
Aug 24, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 10, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 9, 2015 · Apt 2A
Close - Heat/hot water
Entire building
Feb 7, 2015 · Apt 2A
Close - General
Janitor/super
Sep 24, 2014 · Apt 1A
Close - Unsanitary condition
Garbage/recycling storage
Sep 24, 2014 · Apt 1A
Close - Unsanitary condition
Pests
Sep 24, 2014 · Apt 1A
Close - Unsanitary condition
Pests
Sep 24, 2014 · Apt 1A
Close - Unsanitary condition
Sewage
Sep 24, 2014 · Apt 1A
Close - Safety
Fire escape
Apr 3, 2014 · Apt 1A
Close - Unsanitary condition
Pests
Apr 3, 2014 · Apt 1A
Close - Paint/plaster
Ceiling
Apr 3, 2014 · Apt 1A
Close - Water leak
Heavy flow
Apr 3, 2014 · Apt 1A
Close - Nonconst
Smoke detector
Feb 11, 2014 · Apt 1A
Close - Nonconst
Carbon monoxide
Feb 11, 2014 · Apt 1A
Close - Heating
Heat related
Nov 11, 2010 · Apt 1A
Close - Electric
Lighting
May 17, 2010 · Apt BLDG
Close - General
Cabinet
Jun 23, 2008 · Apt 1A
Close - Plumbing
Basin/sink
Jun 23, 2008 · Apt 1A
Close - Appliance
Refrigerator
Jun 23, 2008 · Apt 1A
Close - Plumbing
Basin/sink
Jun 23, 2008 · Apt 1A
Close - Paint/plaster
Wall
Jun 3, 2007 · Apt 1B
Close - General
Fire-escape
Jun 3, 2007 · Apt 1B
Close - Plumbing
Water-leaks
Jun 3, 2007 · Apt 1B
Close - Plumbing
Basin/sink
Oct 26, 2006 · Apt 1A
Close - Plumbing
Basin/sink
Oct 26, 2006 · Apt 1A
Close - Plumbing
Radiator
Oct 26, 2006 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1908
- Floors
- 3
- Residential units
- 4
- Building area
- 5,457 ft²
- Lot area
- 2,117 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2163 / 28
- Assessed value
- $450,900
- Landmark / historic district
- No
HPD registration #128281, last renewed Sep 4, 2025.
Questions about 4230 Broadway
Who owns 4230 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is 4230 Broadway LP.
Does 4230 Broadway have violations?
Yes. NYC HPD has recorded 63 housing violations at this property.
Is 4230 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 4230 Broadway built?
City records list 1908 as the year it was built.
How many apartments are in 4230 Broadway?
It has 4 residential units and 6 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.