roofy

619 West 179 Street

Manhattan, NY 10033BBL 1-02162-0048Map

Owner of record: International Pentecostal Church

619 West 179 Street is a store building built in 1910 in Manhattan, 10033. It has 8 residential units across 3 floors. The owner of record is International Pentecostal Church. HPD has recorded 139 housing violations here, most recently on April 29, 2026. 48 of the 50 most recent violations are still open.

HPD violations
139
DOB violations
42
ECB violations
38
HPD complaints
43

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 139

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2025

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 4, 2025

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 22, 2024

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2024

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 15, 2023

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 16, 2023

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 2, 2022

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 16, 2022

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 16, 2022

    Open — Nov sent out
Show 40 more ↓
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 2, 2021

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2021

    Open — Nov sent out
  • B

    Properly repair the broken or defective door lock assembly at building entrance door at public hall, 1st story

    Dec 8, 2020

    Open — Nov sent out
  • C

    Arrange and make self-closing the doors at building entrance at public hall, 1st story

    Dec 8, 2020

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and all walls , 1st story

    Nov 18, 2020

    Open — Nov sent out
  • C

    Properly repair the broken or defective mortise lock at entrance door to building from street , 1st story

    Nov 18, 2020

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective broken wood floor at public hall 1st sty , 1st story

    Nov 18, 2020

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant plaster at ceiling and all walls of public hall 1st sty , 1st story

    Nov 18, 2020

    Open — Nov sent out
  • C

    Arrange and make self-closing the doors entrace door to building from street not swlf closing , 1st story

    Nov 18, 2020

    Closed — Violation closed
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Oct 16, 2020

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed wire at ceiling at public hall, 2nd story

    Oct 16, 2020

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling and all walls at public hall, 2nd story

    Oct 16, 2020

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.

    Nov 15, 2019

    Open — Nov sent out
  • C

    Fire escape defective. remove or make safe the additional fire escapes missing slats & battens at 2nd story balcony, rear yard

    Nov 15, 2019

    Open — First no access to re- inspect violation
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. at public hall, 1st story

    Nov 15, 2019

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Nov 15, 2019

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Nov 15, 2019

    Open — Nov sent out
  • C

    Provide dwelling with a janitor or responsible person or janitorial service.

    Nov 15, 2019

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Nov 15, 2019

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Nov 15, 2019

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Nov 15, 2019

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Nov 15, 2019

    Open — Nov sent out
  • B

    Replace with new the missing 2nd, 3rd, 14th, and 16th baluster at public hall stairs, 2nd story

    Nov 15, 2019

    Open — Nov sent out
  • B

    Replace with new the missing 2nd, 3rd, 14th, 15th, 19th, 22nd, 23rd, and 25th baluster at public hall stairs, 1st story

    Nov 15, 2019

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 25, 2019

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 10, 2018

    Open — Info nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Jul 5, 2018

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story

    Jul 5, 2018

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ... at public hall, 1st story

    Jul 5, 2018

    Open — Nov sent out
  • B

    Provide dwelling with a janitor or responsible person or janitorial service. at public hall, 1st story

    Jul 5, 2018

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jul 5, 2018

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jul 5, 2018

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jul 5, 2018

    Open — Nov sent out
  • B

    Replace with new the missing baluster (total 4) at public hall stairs, 2nd story

    Jul 5, 2018

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, and walls. in the kitchen located at apt 12, 3rd story, 3rd apartment from south at west

    Jul 5, 2018 · Apt 12

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at ceiling. in the kitchen located at apt 6, 2nd story, 2nd apartment from south at west

    Jul 5, 2018 · Apt 6

    Open — Nov sent out
  • B

    Replace with new the missing baluster (total 6 ) at public hall stairs, 1st story

    Jul 5, 2018

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak at ceiling in the 1st room from east located at b-room 13, 4th story, 3rd b-room from south at west

    Jun 27, 2018 · Apt 13

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective the ceramic tile floor at community bathroom, 4th story

    Jun 27, 2018

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over the ceiling in the 1st room from east located at b-room 11, 4th story, 3rd b-room from south at west

    Jun 27, 2018 · Apt 11

    Open — Nov sent out

DOB building violations · 42

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 28, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 27, 2018

    Dob violation - dismissed
Show 32 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 4, 2018

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 4, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 2, 2012

    Dob violation - active
  • Emergency none

    Egncy-emergency none

    Feb 1, 2012

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Mar 25, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Apr 9, 2001

    Vw-violation work without permit - active
  • Construction other optional

    C-construction other optional

    Apr 9, 2001

    Vw-violation work without permit - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jan 5, 1994

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed

ECB violations · 38

  • Class - 2

    Failure to comply w/ the commissioner's order contained in summons/violation#35361141p issued on 9/8/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. remedy:comply w/ commission

    May 1, 2019

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/ violation #35361141p issued on 09/08/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. no cofoc on file.

    Feb 12, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation# 35361141p issued on 9/8/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for illegal occupancy. r

    Dec 4, 2018 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order contained in summons/violation#35249969p issued on 1/12/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. remedy:comply w/ commissio

    Oct 12, 2018 · Penalty $3,125

    Resolve
  • Class - 1

    Reissue#35249969p issued 1-12-18 occupancy contrary to that allowed bythe c of o or dob records. noted: bldg records hpd i card#43362 states 1st sty should be 2 sleeping rooms. at time of inspection 1st sty occ

    Sep 8, 2018 · Penalty $6,250

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/ violation #35326304r issued on 04/05/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. please file cofo.rmdy

    Jul 20, 2018

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/ violation #35249969p issued on 01/12/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. occupancy contrary.

    Jul 20, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio #35326304r issued on 04/05/18 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01.for converting sro's into a church.rem:comply w/com

    May 24, 2018

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio #35249969p issued on 04/05/17 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01.for illegal occupancy on the 1st fl.rem:comply w/co

    May 24, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    Altered/changed building occupied without a valid certificate of occupancy as per 28-118.3.1; 29.119.3.1. at the time of inspection observed 3 sro's converted into church as rear and pastor's apartment, office

    Apr 5, 2018

    Resolve
Show 28 more ↓
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35249969p issued 01/12/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissione

    Apr 5, 2018 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation #35249969p issued 01/12/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. occupancy contrary to tha

    Feb 16, 2018 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation #35249968n issued 01/12/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. altered changed building

    Feb 16, 2018 · Penalty $800

    Resolve
  • Class - 1

    Altered changed building occupied w/o a valid certificate of occupancyas per 28-118.3.1, 29.119.3.1 noted at the basement 3 sro converted into church as rear and pastors apartment and pastor office under job

    Jan 12, 2018 · Penalty $1,000

    Active
  • Class - 1

    Work w/o a permit. noted: 1st story sro at front bldg being used. converted into attorney office. 2st story, sro at rear of bldg coverted into beauty salon/barber shop. conversion of sro to commercial use on 1s

    Jan 12, 2018

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by the certificate of occupancy or building dept recors noted: building records hpd i card #43362 state 1 story shoudl be 2 sleeping rooms. at time of insp 1st story occupied

    Jan 12, 2018 · Penalty $2,400

    Resolve
  • Class - 2

    Operation of a place of assembly w/o a current cert of operation note at rear of premises created a place of wordship w/ wood benches that i set up to sit more than 75 people rem; obtain a place of assembly cer

    Jun 30, 2012 · Penalty $4,000

    Active
  • Class - 1

    Failure to comply w/ an order of the comm noted on 1/16/09 a vacate order was issue for church at rear of premises vacate order #12/2009 rem: comply w/ comms order to vacate entire first floor lvl

    Jun 30, 2012 · Penalty $12,000

    Active
  • Class - 1

    Failure to maintain buildingg walls & appurtenances southwest corner,front facade,decorative stonework,missing,defective,& on ground approx 20'-0 linear feet missing from 2nd floor to roof. remedy: maintain ext

    Jan 30, 2012 · Penalty $2,400

    Active
  • Class - 1

    Work w/o a permit. work noted: at ground flr rear wall demolished anderected extension w/ cmw walls and wood frame roof apprx 70'x50'x11' work 100% complete. remedy: obtain permit or restore to prior legal

    Jan 16, 2009 · Penalty $1,600

    Active
  • Class - 1

    Occupancy contrary to that allowed by department of building records. illegal occupancy noted: converted ground flr & extension on to church. remedy: discontinue illegal use or amend c of o.

    Jan 16, 2009 · Penalty $2,400

    Active
  • Class - 1

    Operation of a place of assembly w/o a current certificate of operation. noted: ground flr occupied as a church with arranged seating for approx 180 people. remedy: obtain a place of assembly certificate of ope

    Jan 16, 2009 · Penalty $1,600

    Active
  • Non-hazardous

    Failure to maintain interior haz. conditions observed:double hung sashwindow at rear of beauty salon at rear of bldg has a broken plate glass pane which can cut a person trying to operate window counter balance

    Nov 20, 2007 · Penalty $2,500

    Active
  • Hazardous

    Work without a permit. work noted: sub divided the apartment creating two separate business. 1) the front apartment with three rooms occupied as attorney office with three large desks, two computers, 8 chairs

    Sep 15, 2005 · Penalty $2,500

    Active
  • Hazardous

    Exit passageway or corridor: total obstruction noted: the second means of egress from the rear beauty salon obstructed with pad lock creating a hazardous condition. location: 1st floor. remedy: remove obstructi

    Sep 15, 2005 · Penalty $480

    Active
  • Hazardous

    Failure to provide at least two means of egress from room or space where required noted:created on attonery office with no second means of egress creating hazardous conditions at front office locations first fl

    Sep 15, 2005 · Penalty $480

    Active
  • Non-hazardous

    Work without a permit interior demolition of stair line 1 st floor to basement rerouting the entrance of building from basement to 1st floor by installing a steel stair from sidewalk to 1st floor front remedy:

    Apr 9, 2001 · Penalty $2,500

    Active
  • Non-hazardous

    Work without a permit noted removal of masonry entrance stair from side walk to first floor and replace with reduced width steel reduced 2 0". stair approx . 8'-0" high x 3'-0" wide. remedy: obtain permit from

    Apr 9, 2001 · Penalty $2,500

    Active
  • Non-hazardous

    Work without a permit noted interior demolition of stair line 1st fl of building rerouted the entrance of bldg from basement to 1st fl by installinf new new steel stairs at front from sidewalk to 1st fl remedy

    May 6, 1999 · Penalty $2,500

    Active
  • Non-hazardous

    Work without a permit work noted removal of massonary entry stair fromsidewalk to 1st floor and replace with reduced width steel reduced 2 feet stair approx 8 ft high x3ft wide. remedy obtain permit or restore

    Jan 14, 1998 · Penalty $2,500

    Active
  • Non-hazardous

    Occupancy contrary to that allowed by the building department records noted basement converted to church for occupancy of more than 60 persons. legal use walk - up apartment building department records property

    Sep 27, 1995 · Penalty $1,000

    Active
  • Non-hazardous

    Occupancy contray to that allowed by building department records.work noted:basement converted to church for 75t22 people,included new bath-room or office.remedy:obtain or amend certificate of occupancy or

    Jan 13, 1995 · Penalty $800

    Active
  • Non-hazardous

    Work without apermit.work note:interior-stair removed from bsmt to 1stfloor.access exterior-new steal door&steal stair ereched from 1st to street level.remedy:obtain permit&approval,from nyc builing dept.

    Jan 13, 1995

    Resolve
  • Hazardous

    Work without a permit. stop work order. work noted: new construction in progress approx. 50'-0"w. 60'-0"l. &9'-6"h. with concrete floor,concrete block walls. 33 wood joists, 6"x6"inches girder, & metal studs.

    Sep 12, 1994 · Penalty $800

    Active
  • Non-hazardous

    Work without a permit work noted: interior stairs removed from basement to first floor access. exterior new steel door and steel stairs was erected from first to street level. remedy: obtain permit and approval

    Mar 28, 1994

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by building deparment records. work noted: basement converted to church for 75 &22 people, encluded new bathroom and office. remedy: obtain a amend certificate of occupancy o

    Mar 28, 1994

    Resolve
  • Non-hazardous

    Work without a permit. interior demolition of stairline 1st floor to basement. rerouting the entrance of building from basement to 1st floor by installing a steel stair from sidewalk to 1st floor front

    Jan 5, 1994

    Active
  • Non-hazardous

    Occupancy contrary to that allowed by building department records basement level converted from residential unit to church assembly for approx 60 persons with new bathroom office

    Jan 5, 1994

    Active

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Jun 21, 2026 · Apt GROUND

    Close
  • Heat/hot water

    Entire building

    Dec 6, 2020 · Apt 6

    Close
  • Heat/hot water

    Entire building

    Nov 24, 2020 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Nov 16, 2020 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 29, 2020 · Apt BLDG

    Close
  • Electric

    No lighting

    Jun 29, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Oct 27, 2018 · Apt 12

    Close
  • General

    Janitor/super

    Jan 8, 2018 · Apt 12

    Close
  • Unsanitary condition

    Pests

    Jan 8, 2018 · Apt 12

    Close
  • Unsanitary condition

    Pests

    Jan 8, 2018 · Apt 12

    Close
Show 33 more ↓
  • Heat/hot water

    Entire building

    Nov 16, 2017 · Apt C

    Close
  • Heat/hot water

    Entire building

    Nov 9, 2017 · Apt 6

    Close
  • Safety

    Smoke detector

    Sep 26, 2014 · Apt 12

    Close
  • Safety

    Carbon monoxide detector

    Sep 26, 2014 · Apt 12

    Close
  • General

    Mailbox

    Dec 20, 2011 · Apt 11

    Close
  • General

    Doors

    Dec 20, 2011 · Apt 11

    Close
  • Nonconst

    Carbon monoxide

    Dec 1, 2010 · Apt 12

    Close
  • Nonconst

    Carbon monoxide

    Dec 1, 2010 · Apt 6

    Close
  • Nonconst

    Smoke detector

    Dec 1, 2010 · Apt 11

    Close
  • General

    Stairs

    Dec 1, 2010 · Apt BLDG

    Close
  • General

    Stairs

    Dec 1, 2010 · Apt BLDG

    Close
  • Nonconst

    Carbon monoxide

    Dec 1, 2010 · Apt 11

    Close
  • Nonconst

    Smoke detector

    Dec 1, 2010 · Apt 12

    Close
  • Nonconst

    Smoke detector

    Dec 1, 2010 · Apt 6

    Close
  • General

    Mold

    Mar 15, 2010 · Apt 12

    Close
  • Plumbing

    Basin/sink

    Mar 15, 2010 · Apt 12

    Close
  • General

    Mailbox

    Mar 15, 2010 · Apt 12

    Close
  • Paint/plaster

    Wall

    Mar 15, 2010 · Apt 12

    Close
  • Paint/plaster

    Wall

    Mar 15, 2010 · Apt 12

    Close
  • Paint/plaster

    Wall

    Mar 15, 2010 · Apt 12

    Close
  • Plumbing

    Water-leaks

    Mar 15, 2010 · Apt 12

    Close
  • Heating

    Heat related

    Jan 2, 2010 · Apt 11

    Close
  • Heating

    Heat related

    Nov 30, 2007 · Apt 2K

    Close
  • Heating

    Heat related

    Nov 20, 2006 · Apt 2K

    Close
  • Heating

    Heat related

    Nov 3, 2006 · Apt 2K

    Close
  • Heating

    Heat related

    Oct 23, 2006 · Apt 2K

    Close
  • Heating

    Heat related

    Feb 28, 2006 · Apt 2K

    Close
  • Heating

    Heat related

    Feb 14, 2005 · Apt 2K

    Close
  • Heating

    Heat related

    Dec 21, 2004 · Apt 12

    Close
  • Heating

    Heat related

    Dec 20, 2004 · Apt 12

    Close
  • Heating

    Heat related

    Dec 20, 2004 · Apt 2K

    Close
  • Heating

    Heat related

    Dec 19, 2004 · Apt 3

    Close
  • Appliance

    Sprinker cert

    Jul 26, 2004

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Store building (K9)
Year built
1910
Floors
3
Residential units
8
Building area
4,550 ft²
Lot area
1,875 ft²
Zoning
R7-2
Community board
112
Council district
10
Block / lot
2162 / 48
Assessed value
$284,850
Landmark / historic district
No

HPD registration #117874, last renewed Jan 26, 2016.

Questions about 619 West 179 Street

Who owns 619 West 179 Street?

The owner of record in NYC Department of City Planning PLUTO data is International Pentecostal Church.

Does 619 West 179 Street have violations?

Yes. NYC HPD has recorded 139 housing violations at this property.

Is 619 West 179 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 619 West 179 Street built?

City records list 1910 as the year it was built.

How many apartments are in 619 West 179 Street?

It has 8 residential units and 13 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.