4109 Broadway
Manhattan, NY 10033BBL 1-02142-0133Map
Owner of record: Bway Temple Methodist
4109 Broadway is a religious facility built in 1926 in Manhattan, 10033. The owner of record is Bway Temple Methodist. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 15
- ECB violations
- 23
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 15
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed
Show 5 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 23
- Class - 2
Reissue - 34445563p failure to maintain bldg in code-compliant manner - bulk head door corroded. remedy: maintain building in code-compliantmanner repair or replace door.
May 19, 2009
Resolve - Class - 2
Reissue - 34466685h failure to maintain building in code-compliant manner stairwell emergency exit lighting not functional/front stair 2nd & 3rd flr. remedy: repair/replace defective lighting.
May 19, 2009
Active - Class - 2
Reissue 34445737h. failure to maintain building in code-compliant manner. water damaged and/or missing ceiling tiles rooms 305,207,304,204,306(sr) & in 2nd flr corridor. remedy: replace all defective material.
May 19, 2009
Resolve - Class - 2
Failure to maintain building in code-compliant manner reissue 34432700l. room 303-305 no door closers. rear 2nd flr door not self latching. rear 3rd flr door not self closing. remedy: repair/replace door hardwa
May 19, 2009
Resolve - Class - 2
Failure to maintain building in code-compliant manner - room 307 elec light fixture defective. remedy: repair/replace elec light fixture.
May 19, 2009
Active - Class - 3
Failure to maintin bldg in code compliant manner-rm 205-window broken.remedy: repair window and/or replace.
May 19, 2009
Active - Hazardous
Failure to maintain bldg:interior noted:bulk head door corroded. remedy:repair all defects
May 2, 2006
Resolve - Hazardous
Exit lighting defective/fails to meet bldg code standards. noted:illuminated exit lighting-missing from westside gym door;not illuminated atfront(eastside)stairwell.remedy:repair/replace lighting
May 2, 2006
Active - Hazardous
Exit door not self closing. notd:gym door to stairwell not self closing. bulk head door not self closing. remedy:repair/replace door
May 2, 2006
Active - Non-hazardous
Water damaged & missing ceiling tiles at rooms: 305,304,201,204,207 and second floor corridor. remdedy: replace defects.
May 2, 2006
Resolve
Show 13 more ↓
- Non-hazardous
Water damaged plaster in bulkhead. remedy: repair / replace defects.
May 2, 2006
Active - Non-hazardous
Broken glazing in window of room 207. remedy: replace defect.
May 2, 2006
Resolve - Non-hazardous
Gym floor water damaged and warped. remedy: replace defects.
May 2, 2006
Active - Hazardous
Noted: stairwell (rear) exit passage gate to 173 st is padlocked. remedy: remove illegal hardware install required door hardware as per nyc building code.
Feb 4, 2005
Resolve - Non-hazardous
Noted: front stairwell emergency exit lighting not functional/energized 2nd and 3rd floors. remedy: repair/replace defective lighting.
Feb 4, 2005
Active - Non-hazardous
Noted: gymnasium flooring has significant buckling throughout from apparent moisture infiltration and is unusable. remedy: repair/replace flooring.
Feb 4, 2005
Active - Non-hazardous
Noted: gymnasium stairwell exit door not self-closing. remedy: repair/replace door or hardware.
Feb 4, 2005
Active - Non-hazardous
Exit door, required width decreased by obstruction noted : rm#s 203, 204 - exit drs ( 2nd means of egress ) blocked by furniture, cabinets chairs remedy : remove obstructions
Mar 31, 2004
Resolve - Non-hazardous
Failure to maintain building defect noted : no door closers - 2nd flr 3rd flr rear exit, rm#s 303 - 305 remedy : maintain building / installclosers
Mar 31, 2004
Resolve - Non-hazardous
Failure to provide emg pover exit lights in corridors and stairs. failure to provide emy pover to exit ligthts in corridors and stairs. failure to provide adequate exit drtl signs in corridors failure to prove
Aug 30, 2001
Resolve - Non-hazardous
Failure to maintain, defects, cracked flooring throughout complex. locations, corridors, and public rooms of school remedy: do repairs.
Apr 27, 2001
Resolve - Non-hazardous
Exit passageway or corridor: equired with decreased by obstruction. furnitures stored in emergency staircase at 3rd floor rear. remedy: remove obstruction.
Mar 1, 1999 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain building. defect is: storm water waste line temp. leaks into computer room on third floor classroom. remedy: repair or replace.
Mar 1, 1999 · Penalty $2,500
Resolve
Complaints
- Heating
Heat related
Feb 1, 2010 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Religious facility (M1)
- Year built
- 1926
- Floors
- 4
- Residential units
- —
- Building area
- 35,175 ft²
- Lot area
- 12,700 ft²
- Zoning
- R8
- Community board
- 112
- Council district
- 10
- Block / lot
- 2142 / 133
- Assessed value
- $4,715,100
- Landmark / historic district
- No
Questions about 4109 Broadway
Who owns 4109 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is Bway Temple Methodist.
Does 4109 Broadway have violations?
NYC HPD has no housing violations on record for this property.
Is 4109 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 4109 Broadway built?
City records list 1926 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.