636 West 158 Street
Manhattan, NY 10032BBL 1-02134-0154Map
Owner of record: West 158 Street Opportunity LLC
636 West 158 Street is an elevator apartment building built in 2025 in Manhattan, 10032. It has 120 residential units across 17 floors. The owner of record is West 158 Street Opportunity LLC. HPD has recorded 120 housing violations here, most recently on April 29, 2026.
- HPD violations
- 120
- DOB violations
- 2
- ECB violations
- 33
- HPD complaints
- 85
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 120
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2024
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective concrete treads and risers 1st 2nd and 3rd up from bottom at stoor at building front
Sep 14, 2023
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective paving at building front
Sep 14, 2023
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 16, 2023
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 16, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 16, 2022
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Closed — Violation closed
Show 40 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 10, 2018
Closed — Violation dismissed - IInformation / order
Above premises have been vacant and untenanted except for caretaker for 60 days or more, and cannot be reoccupied until a new certificate of occupancy has been obtained. premises have been vacant since 07/17/2017
Jul 17, 2017
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 27, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 2, 2015
Closed — Violation dismissed - CImmediately hazardous
Provide reseal at all accessible openings
Jun 16, 2015
Closed — Violation closed - CImmediately hazardous
Provide temporary seal up at all accessible openings
Jun 8, 2015
Closed — Violation closed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts 2 nd sty b-room north 1 2f vacated # 123711
Jun 3, 2015
Closed — Violation closed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts 1 sty b- room west 1 vacated # 123711
Jun 3, 2015
Closed — Violation closed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts basement apt at west 1 vacated # 123711
Jun 3, 2015
Closed — Violation closed - IInformation / order
The premises have been vacated by an order of this department and cannot be reoccupied except for caretaker until a new certificate of occupancy has been obtained.
Jun 3, 2015
Closed — Violation closed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts 3 sty b-room 3 north 1 vacated # 123711
Jun 3, 2015
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures all stories public halls
May 15, 2015
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures , at community bathroom
May 15, 2015
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3f, 2nd story, 1st apartment from west at north
May 12, 2015 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system at the boiler room at cellar
May 12, 2015
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at all walls at public hall, 2nd story
May 11, 2015
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood flooring at plumbing pipes, approximately 4 square feet at public hall, 2nd story
May 11, 2015
Closed — Violation closed - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling light fixure in the basement at public hall
May 11, 2015
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood flooring at entrance cellar door in the basement at public hall
May 11, 2015
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department public halls and stairs all walls and ceilings
May 11, 2015
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at skylight encasement at all walls at public hall, 3rd story
May 11, 2015
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of refrigerator and washing machine with doors attached at public hall, 1st story
May 11, 2015
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at lobby
May 11, 2015
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd story
May 11, 2015
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of free standing radiator at public hall, 1st story
May 11, 2015
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at all walls at public hall, 3rd story
May 11, 2015
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3f, 2nd story, 1st apartment from west at north
May 11, 2015 · Apt 3F
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3f, 2nd story, 1st apartment from west at north
May 11, 2015 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
May 11, 2015
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of free standing radiator at public hall, 1st story
May 11, 2015
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective 2nd tread up at public hall stairs
May 11, 2015
Closed — Violation closed - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at south wall in the kitchenette located at apt 3f, 2nd story, 1st apartment from west at north
May 11, 2015 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3f, 2nd story, 1st apartment from west at north
May 11, 2015 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures ... in the entire apartment located at apt 3f, 2nd story, 1st apartment from west at north
May 11, 2015 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at public areas
May 11, 2015
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective 12th wood tread up at public hall stairs, 2nd story
May 11, 2015
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood flooring at public hall, 2nd story
May 11, 2015
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at public hall in all stories.
May 7, 2015
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures .. in the entire apartment located at bsmt-apt bb, 1st bsmt-apt from east at south
Apr 28, 2015 · Apt BB
Closed — Violation closed
DOB building violations · 2
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2015
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 33
- Class - 2
3307.4.7- observed active work and construction material storage adjacent to the public sidewalk without required fencing, barriers, or debris netting separating the work/storage zone from pedestrians. work/sto
Jul 2, 2026 · Penalty $2,500
Resolve - Class - 2
3314.1. observed workers performing bricklaying from a pipe scaffold consisting of a single frame without required guardrails, midrails, end rails, toe boards, secured planking, or a safe means of access. scaff
Jul 2, 2026 · Penalty $2,500
Resolve - Class - 1
Failure to safeguard the public and property affected by construction operations. at time of inspection at exp #4, observed 17 story nb sitefound unsecured with entrance door open without security and accessibl
Jun 5, 2026 · Penalty $10,000
Resolve - Class - 2
Miscellaneous chapter 33 violations(3303.3 watch person). at time of inspection observed 17 story new building without a required watch person on duty during non working hours(ahv). failure to provide a compete
Jun 5, 2026 · Penalty $2,500
Resolve - Class - 2
Observed suspended scaffold installed on roof of jobsite @ expo 2&4 with tie backs tied installed to angles plates drill into roof/balcony concrete slab . upon request to see manufacturer spec for the suspended
Apr 7, 2026 · Penalty $1,250
Resolve - Class - 2
Observed 17 story nb with suspended scaffold installed @ expo 2&4. upon review of dob systems, it was shown that there is no notification provided to the department for the installation of a fix outrigger syste
Apr 7, 2026 · Penalty $800
Resolve - Class - 2
Atoi of a 16-stry new building, formwork erected between 2nd /3rd floor levels.no ohp or safeguards provided for adjoining property located less than 10 feet away.construction debris &concrete residue obs @exp
Feb 18, 2026 · Penalty $5,000
Resolve - Class - 2
At time of inspection, supported scaffold not erected per approved elevation drawings. approved plans indicate continuous full-frame configuration; however, field conditions show partial framing with interrupte
Feb 18, 2026
Resolve - Class - 2
17 story nb an active site observed a large file 12ft-h by 20 ft wide of debris/combustible materials at exp#3, creating a significant fire hazard. this condition poses a serious treat to both property and huma
Nov 21, 2025 · Penalty $1,280
Resolve - Class - 2
17 story nb an active jobsite observed unfinished concrete wall +/-60 f-l by 18 ft-h exposed rebars at the top at exp 3 without oh / const fence / netting unprotected. contrary to ssp-008.01. leaving adjacent p
Nov 21, 2025 · Penalty $1,280
Resolve
Show 23 more ↓
- Class - 2
Work after hours without a variance permit. at time of inspection observed an open site with ssm named silver kamberaj onsite. observed workers working at exposure#3 on supported scaffolding. upon review it was
Nov 9, 2025 · Penalty $3,125
Resolve - Class - 1
Site safety manager failed to immediately notify the department of conditions as required. at time of inspection observed an open site with ssm named silver kamberaj onsite. upon review it was noted no after-ho
Nov 9, 2025
Resolve - Class - 2
17 story nb active site.observed adjoining property chimney/vent in place at exp#4 648 west 158st abutted to new building less than 10 ft and not fully extended above nb 4 ft or offset to avoid backdraft/fire h
Sep 15, 2025 · Penalty $5,000
Resolve - Class - 2
17 story nb active site.sidewalk shed in place exp#1permit#m01126136 &overhead protection at rear exp#3.shed had 10 vertical post base mudsills members covered in 3 ft of dirt.exp#3 shed was missing parapet wal
Sep 15, 2025
Resolve - Class - 1
17 story nb active site.observed multiple missing/inadequate guardrails from 8 floor and above at exp#2,4.1 guardrail made with metal studs not wood on 5 fl exp#4.also missing guardrails at edge on opening at 1
Sep 15, 2025 · Penalty $12,500
Resolve - Class - 1
No site-specific forwwork design drawings per 3301.7. as noted at timeof my inspection at an active job observed foundation wall beam groundand footing on pile been found on egquiring for site-specific formwork
Feb 25, 2025 · Penalty $2,500
Resolve - Class - 1
Failure to obtain requested design professional evaluation prior to using encasting structure to support formwork foundation loads: as notedat time of my inspection observed foundation wall pour over to adjacen
Feb 25, 2025 · Penalty $5,000
Resolve - Class - 1
Work does not conform to approved construction document and/or amendments. as noted at time of inspection at an active jobsite observed workers on exposure #4 on footing 25ft long and 5ft wide however on review
Feb 25, 2025 · Penalty $2,500
Resolve - Class - 1
Active 17 stories nb jobsite under construction, i observed inadequate safety measures at multiple locations entire posing danger and unsafe for workers (3301.2)- debris netting installed near excavated pit wit
Feb 25, 2025
Resolve - Class - 2
Active 17 stories nb under construction, i observed use of a110 metal rib sheet form use as formwork for concrete operation exp-4. upon request for manufacturer specs as per 3301.1.3 and or rdp document indicat
Feb 25, 2025
Resolve - Class - 1
Working without after hour permit. noted: at the time of inspection observed workers preforming soe work using an excavator. upon further research no ahv permits were found in the dob records., obtain after hou
Dec 23, 2024 · Penalty $6,250
Resolve - Class - 2
At time of inspection i observed active on going construction work in progress currently at excavation phase upon search in dob now and bis systems both show that no soe permit was issued and no new building p
Aug 26, 2024
Resolve - Class - 2
Inactive demo site, observed construction fence with active permit installed at exp1. observed no construction fence installed at rear at exp3. no construction fence installed between adjoining properties at ex
Jul 5, 2024 · Penalty $1,000
Resolve - Class - 2
Observed inadequate demolition debris/ materials throughout interior & exterior of active demolition jobsite. large amounts of debris store on interior floors of the weak structure that can possible collapse. d
May 30, 2024 · Penalty $1,250
Resolve - Class - 2
3301.6 manufacturer specifications- observed debris chute installed expo of jobsite. chute is installed & secured w/ make shift connections, roped attachments to pipe scaffolding & loose members of structure u
May 30, 2024 · Penalty $1,250
Resolve - Class - 1
Observed debris chute 3rd floor level of demolition jobsite. upon review of approved plans provided, guard rails are to be installed around debris chute at exposure 3. none are provided at the time of inspectio
May 30, 2024 · Penalty $625
Resolve - Class - 1
3306.9.13 rodent extermination-observed rodents throughout active job site under demolition @ 636 west 158 street_123524944. forms received from nyc health self-certified that the location does have rodents. no
May 30, 2024
Resolve - Class - 2
3314.1 pipe scaffold- observed supported pipe scaffolding installed @ expos 1&3 of jobsite. scaffolding w/ makeshift base plates on stair case & debris chute not shown on approved plans. approved plans shows on
May 30, 2024 · Penalty $625
Resolve - Class - 1
Occupancy contrary to that allowed by the certificate of occupancy.c/o#44117 date:5/11/1955.class "b" rooms 1st story converted into class "a" apartment. remedy:discontinue illegal use or amend c/o.
Apr 28, 2015 · Penalty $2,400
Resolve - Class - 1
Failure to maintain building in code compliant manner. defects noted: concrete platform at front step is cracked and breaking apart created tripping hazard which puts public in danger. rmdy: maintain building.
Jul 8, 2013 · Penalty $2,500
Resolve - Class - 3
Failure to maintain.defect is section of rain leader ismissing at rear of bldg.remedy:repair defect.
Sep 6, 2011 · Penalty $250
Resolve - Non-hazardous
Altered building occupied without a valid certificate of occupancy altered building occupied without first obtaining a valid certificate of occupancy as required under alth221/89 remedy obtain a valid certifica
Aug 29, 1995 · Penalty $350
Resolve - Non-hazardous
Altered bldg. occupied without a valid certificate of occupancy. remedy: obtain a valid certificate of occupancy.
Jun 27, 1988 · Penalty $250
Resolve
Complaints
- Safety
Window guard broken/missing
Jul 27, 2026 · Apt 8F
Close - Safety
Carbon monoxide detector
Jul 27, 2026 · Apt 8F
Close - Electric
Lighting
Jul 27, 2026 · Apt 8F
Close - Plumbing
Water supply
Jul 27, 2026 · Apt 8F
Close - Flooring/stairs
Floor
Jul 27, 2026 · Apt 8F
Close - Plumbing
Water supply
Jul 27, 2026 · Apt 8F
Close - Safety
Smoke detector
Jul 27, 2026 · Apt 8F
Close - Plumbing
Bathtub/shower
Jul 27, 2026 · Apt 8F
Close - Flooring/stairs
Floor
Jul 25, 2026 · Apt 8F
Close - Flooring/stairs
Floor
Jul 10, 2023 · Apt B12NDF
Close
Show 40 more ↓
- Electric
Power outage
May 14, 2015 · Apt 4R
Close - Electric
Power outage
May 14, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
May 14, 2015 · Apt BLDG
Close - Plumbing
Water supply
May 14, 2015 · Apt 4R
Close - Heat/hot water
Entire building
May 9, 2015 · Apt 2
Close - Electric
Power outage
May 9, 2015 · Apt 2
Close - Electric
Power outage
May 5, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
May 5, 2015 · Apt BLDG
Close - Electric
Power outage
Apr 29, 2015 · Apt 2
Close - Heat/hot water
Entire building
Apr 28, 2015 · Apt 2
Close - Electric
Power outage
Apr 28, 2015 · Apt 2
Close - Electric
Power outage
Apr 26, 2015 · Apt 2
Close - Heat/hot water
Entire building
Apr 24, 2015 · Apt BLDG
Close - Electric
Power outage
Apr 24, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 24, 2015 · Apt 5R
Close - Electric
Power outage
Apr 24, 2015 · Apt 5R
Close - Electric
Power outage
Apr 23, 2015 · Apt 1
Close - Electric
Power outage
Apr 23, 2015 · Apt 5R
Close - Heat/hot water
Entire building
Apr 23, 2015 · Apt 2
Close - Electric
Power outage
Apr 23, 2015 · Apt 2
Close - Heat/hot water
Entire building
Apr 23, 2015 · Apt 2
Close - Heat/hot water
Entire building
Apr 23, 2015 · Apt 4F
Close - Electric
Power outage
Apr 23, 2015 · Apt 4F
Close - Heat/hot water
Entire building
Apr 23, 2015 · Apt 5R
Close - Heat/hot water
Entire building
Apr 23, 2015 · Apt 2
Close - Electric
Power outage
Apr 23, 2015 · Apt 2
Close - Electric
No lighting
Dec 10, 2014 · Apt ALL
Close - Unsanitary condition
Garbage/recycling storage
Aug 19, 2014 · Apt 1
Close - Nonconst
Rubbish
Apr 23, 2013 · Apt 2
Close - Nonconst
Vermin
Apr 23, 2013 · Apt 2
Close - Heating
Heat related
Apr 23, 2013 · Apt 2
Close - Electric
Electric-supply
Jan 24, 2013 · Apt 1FL
Close - Heating
Heat related
Jan 24, 2013 · Apt 1FL
Close - Electric
Electric-supply
Jan 24, 2013 · Apt 1FL
Close - Heating
Heat related
Jan 20, 2013 · Apt 2
Close - Electric
Electric-supply
Jan 20, 2013 · Apt 2
Close - Electric
Electric-supply
Jan 18, 2013 · Apt 1FL
Close - Heating
Heat related
Jan 18, 2013 · Apt 1FL
Close - General
Cooking gas
Jan 18, 2013 · Apt 1FL
Close - Electric
Electric-supply
Jan 17, 2013 · Apt 2
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Feb 3, 2026 | Non-market transfer | Rentals - elevator apartments | 121 |
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2025
- Floors
- 17
- Residential units
- 120
- Building area
- 268,776 ft²
- Lot area
- 18,622 ft²
- Zoning
- R8
- Community board
- 112
- Council district
- 7
- Block / lot
- 2134 / 154
- Assessed value
- $2,712,150
- Landmark / historic district
- No
HPD registration #116068, last renewed Sep 10, 2025.
Questions about 636 West 158 Street
Who owns 636 West 158 Street?
The owner of record in NYC Department of City Planning PLUTO data is West 158 Street Opportunity LLC.
Does 636 West 158 Street have violations?
Yes. NYC HPD has recorded 120 housing violations at this property.
Is 636 West 158 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 636 West 158 Street built?
City records list 2025 as the year it was built.
How many apartments are in 636 West 158 Street?
It has 120 residential units and 121 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.