425 West 162 Street
Manhattan, NY 10032BBL 1-02110-0041Map
Owner of record: Estate Of Joyce C. Duncan
425 West 162 Street is a walk-up apartment building built in 1896 in Manhattan, 10032. It has 3 residential units across 3 floors. The owner of record is Estate Of Joyce C. Duncan. HPD has recorded 511 housing violations here, most recently on September 10, 2026. 32 of the 50 most recent violations are still open.
- HPD violations
- 511
- DOB violations
- 2
- ECB violations
- 3
- HPD complaints
- 536
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 511
- CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Sep 10, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures at community bathroom, 3rd story
Sep 10, 2026
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 10, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Jul 6, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Jul 6, 2026 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective concrete tread 5th from bottom up at the building entrance , 1st story
Jul 1, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective concrete tread 4th from bottom up at the building entrance , 1st story
Jul 1, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective concrete tread 2nd from bottom up at the building entrance , 1st story
Jul 1, 2026
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective faucets at wash basin at community bathroom, 3rd story
May 9, 2026
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchenette located at b-room 3bb, 3rd story, 1st b-room from west at north
May 9, 2026 · Apt 3BB
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of mice in the kitchenette located at b-room 3bb, 3rd story, 1st b-room from west at north
May 9, 2026 · Apt 3BB
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the kitchenette located at b-room 3bb, 3rd story, 1st b-room from west at north
May 9, 2026 · Apt 3BB
Open — Notice of issuance sent to tenant - CImmediately hazardous
Repair the roof so that it will not leak over ceiling at scuttle ladder at public hall, 3rd story
May 9, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective 2nd concrete tread from the bottom up at the building entrance , 1st story
Mar 12, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door hinges in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Mar 12, 2026 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective 3rd concrete tread from the bottom up at the building entrance , 1st story
Mar 12, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a notice, written in english and in spanish, on the building entrance door or other conspicuous location in the building common area, stating that: (1) the building is in the alternative enforcement program, (2) that occupants may call 311 or the aep at 212-863-8262 to report housing maintenance complaints, (3) the name, telephone, and address of the owner, and, (4) the identity of any financial institution that holds a mortgage on the property. post at public hall, 1st story
Mar 12, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective 5th concrete tread from the bottom up at the building entrance , 1st story
Mar 12, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Mar 12, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Mar 12, 2026 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Feb 11, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 2nd room from east located at b-room 2, 2nd story, 1st b-room from south at west
Feb 11, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Provide place within the building for the storage of waste receptacles and disinfect same regularly.
Nov 6, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at building entrance door at public hall, 1st story
Aug 28, 2025
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement
Aug 11, 2025
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures at community bathroom, 2nd story
Aug 11, 2025
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement
Aug 7, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures at community bathroom
Aug 7, 2025
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all storeis at public hall
Aug 7, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement
Jul 31, 2025
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective connection at wastepipe at sink in the kitchenette located at b-room 3bb, 3rd story, 1st b-room from west at north
Jul 31, 2025 · Apt 3BB
Open — Not complied with - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling at public hall, 2nd story
Jul 31, 2025
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at west wall equal to 10 sq. feet in the kitchenette located at b-room 3bb, 3rd story, 1st b-room from west at north
Jul 31, 2025 · Apt 3BB
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north and south walls in the kitchenette located at b-room 3bb, 3rd story, 1st b-room from west at north
Jul 31, 2025 · Apt 3BB
Open — Not complied with - CImmediately hazardous
Remove all obstructions and repair all defects in wastepipe at wash basin at community bathroom, 3rd story
Jul 31, 2025
Open — Violation will be reinspected - ANon-hazardous
Refit entry door at community bathroom, 3rd story
Jul 31, 2025
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the room located at b-room 3bb, 3rd story, 1st b-room from west at north
Jul 31, 2025 · Apt 3BB
Open — Defect letter issued - CImmediately hazardous
Provide hot water at all hot water fixtures at community bathroom, 3rd story
Jul 31, 2025
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3bb, 3rd story, 2nd apartment from south at west
Jul 15, 2025 · Apt 3BB
Open — Not complied with - BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 3bb, 3rd story, 2nd apartment from south at west
Jul 15, 2025 · Apt 3BB
Open — Not complied with - BHazardous
Provide adequate lighting for 60 watts at public hall, 2nd story
Jul 15, 2025
Open — Not complied with - BHazardous
M/d law abate the nuisance consisting of extension cord running throughout in the entire apartment located at apt 3bb, 3rd story, 2nd apartment from south at west
Jul 15, 2025 · Apt 3BB
Open — Not complied with - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north located at apt 3bb, 3rd story, 2nd apartment from south at west
Jul 15, 2025 · Apt 3BB
Closed — Violation closed - CImmediately hazardous
Replace with new the missing one wood baluster at public hall stairs, 3rd story
Jul 15, 2025
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective connection waste line under sink in the kitchen located at apt 3bb, 3rd story, 2nd apartment from south at west
Jul 15, 2025 · Apt 3BB
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). in the entire apartment located at apt 3bb, 3rd story, 2nd apartment from south at west
Jul 15, 2025 · Apt 3BB
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 3bb, 3rd story, 2nd apartment from south at west
Jul 15, 2025 · Apt 3BB
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jul 15, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove all obstructions and repair all defects in wash basin at community bathroom, 3rd story
Jul 15, 2025
Closed — Violation closed
DOB building violations · 2
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - active
ECB violations · 3
- Class - 2
Failure to submit a certificate of correction of violation #35680697z issued on 05-02-2024 for failure to maintain building in code-complaint manner., file a certificate of correction
Aug 7, 2026 · Penalty $1,280
Active - Class - 1
Failure to maintain building in code-compliant manner. at time of inspection observed at 3rd floor of above building, construction work performed. disconnecting a stove in an apt., leaving gas pipe uncapped. al
May 2, 2024 · Penalty $6,250
Active - Class - 3
Failure to maintain building in code compliant manner. door hardware at main entrance door of building is defective with door knob completely removed from door at interior side of door. noted secondary locking
Oct 21, 2021 · Penalty $500
Active
Complaints
- Water leak
Heavy flow
Oct 11, 2026 · Apt 3FLOOR
Open - Heat/hot water
Entire building
Oct 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 30, 2026 · Apt 2F
Close - Heat/hot water
Entire building
Sep 30, 2026 · Apt 2F
Close - Heat/hot water
Entire building
Sep 29, 2026 · Apt 2F
Close - Heat/hot water
Entire building
Sep 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 23, 2026 · Apt BLDG
Close
Show 40 more ↓
- Electric
Power outage
Sep 4, 2026 · Apt 3BB
Close - Heat/hot water
Entire building
Sep 4, 2026 · Apt 3BB
Close - Electric
Power outage
Sep 2, 2026 · Apt 3BB
Close - Unsanitary condition
Garbage/recycling storage
Sep 2, 2026 · Apt 3BB
Close - Heat/hot water
Entire building
Sep 2, 2026 · Apt 3BB
Close - Electric
Power outage
Aug 12, 2026 · Apt APT3BB
Close - Electric
Power outage
Aug 8, 2026 · Apt BLDG
Close - Electric
Power outage
Aug 8, 2026 · Apt 3BBB
Close - Electric
Power outage
Aug 8, 2026 · Apt 3BBB
Close - Electric
Power outage
Aug 7, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 1, 2026 · Apt 2BGARB
Close - Unsanitary condition
Pests
Aug 1, 2026 · Apt 3BB
Close - Electric
Power outage
Aug 1, 2026 · Apt 3BB
Close - Unsanitary condition
Pests
Aug 1, 2026 · Apt 3BB
Close - Unsanitary condition
Pests
Aug 1, 2026 · Apt 3BB
Close - Unsanitary condition
Garbage/recycling storage
Jul 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 8, 2026 · Apt BUILDI
Close - Heat/hot water
Entire building
Jul 8, 2026 · Apt BUILDI
Close - Electric
Power outage
Jul 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 7, 2026 · Apt 2F
Close - Electric
Power outage
Jul 2, 2026 · Apt BLDG
Close - Electric
Power outage
Jul 2, 2026 · Apt 3BB
Close - Electric
Power outage
Jul 2, 2026 · Apt BLDG
Close - Electric
No lighting
Jul 2, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 2, 2026 · Apt 3BB
Close - Heat/hot water
Entire building
Jun 29, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jun 18, 2026 · Apt 2BAND3
Close - Unsanitary condition
Pests
Jun 18, 2026 · Apt 2BAND3
Close - Unsanitary condition
Garbage/recycling storage
Jun 18, 2026 · Apt 2BAND3
Close - Unsanitary condition
Garbage/recycling storage
Jun 18, 2026 · Apt 2
Close - Heat/hot water
Entire building
May 6, 2026 · Apt BUILDI
Close - Heat/hot water
Entire building
May 6, 2026 · Apt 3BB
Close - Electric
Power outage
May 4, 2026 · Apt 3BB
Close - Electric
No lighting
May 4, 2026 · Apt 3BB
Close - Unsanitary condition
Pests
Apr 24, 2026 · Apt 3BB
Close - Unsanitary condition
Pests
Apr 24, 2026 · Apt 3BB
Close - Heat/hot water
Entire building
Apr 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 19, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1896
- Floors
- 3
- Residential units
- 3
- Building area
- 3,952 ft²
- Lot area
- 2,138 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2110 / 41
- Assessed value
- $96,600
- Landmark / historic district
- Jumel Terrace Historic District
HPD registration #123692, last renewed Nov 6, 2025.
Questions about 425 West 162 Street
Who owns 425 West 162 Street?
The owner of record in NYC Department of City Planning PLUTO data is Estate Of Joyce C. Duncan.
Does 425 West 162 Street have violations?
Yes. NYC HPD has recorded 511 housing violations at this property.
Is 425 West 162 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 425 West 162 Street built?
City records list 1896 as the year it was built.
How many apartments are in 425 West 162 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.