1987 Amsterdam Avenue
Manhattan, NY 10032BBL 1-02108-0077Map
Owner of record: 1987-89 Amsterdam Ave H D F C
1987 Amsterdam Avenue is a walk-up apartment building built in 1910 in Manhattan, 10032. It has 22 residential units across 6 floors. The owner of record is 1987-89 Amsterdam Ave H D F C. HPD has recorded 212 housing violations here, most recently on April 29, 2026. 12 of the 50 most recent violations are still open.
- HPD violations
- 212
- DOB violations
- 12
- ECB violations
- 20
- HPD complaints
- 186
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 212
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection wasteline pipe at wash/basin in the bathroom located at apt 2, 2nd story, 2nd apartment from north at east
Mar 15, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet at wash/basin in the bathroom located at apt 2, 2nd story, 2nd apartment from north at east
Mar 15, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the bathroom located at apt 2, 2nd story, 2nd apartment from north at east
Mar 15, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling, north wall, and south wall in the private hallway located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, south wall, and west wall in the 4th room from east located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the south wall and west wall in the bathroom located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the grout in between ceramic wall tiles at east wall and south wall at bathtub in the bathroom located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixture at the ceiling in the bathroom located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the private hallway located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Trace and repair the source and abate the visible mold condition... at the south wall and west wall greater 10 square feet in the bathroom located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroom located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at in the entire apartment located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling, south wall, and west wall in the bathroom located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Replace the broken or defective wash basin in the bathroom located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic wall tiles at east wall and south wall in the bathroom located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling and all walls in the 2nd room from east located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 2nd room from east located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling and east wall in the 1st room from east located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and east wall in the 1st room from east located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective hardwood floors in the 4th room from east located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling, south wall, and west wall in the 4th room from east located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation metal riser in the 4th room from east located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation metal riser in the kitchen located at apt 2, 1st story, 2nd apartment from north at east
Sep 19, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling, south and west walls in the bathroom located at apt 22, 2nd story, 2nd apartment from east at south
Aug 25, 2025 · Apt 22
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south and west walls in the bathroom located at apt 22, 2nd story, 2nd apartment from east at south
Aug 25, 2025 · Apt 22
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at steam riser in the bathroom located at apt 22, 2nd story, 2nd apartment from east at south
Aug 25, 2025 · Apt 22
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 22, 2nd story, 2nd apartment from east at south
Aug 25, 2025 · Apt 22
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 22, 2nd story, 2nd apartment from east at south
Aug 25, 2025 · Apt 22
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at the ceiling south and west walls in the bathroom located at apt 22, 2nd story, 2nd apartment from east at south
Aug 25, 2025 · Apt 22
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 54, 5th story, 2nd apartment from south at west
Sep 3, 2024 · Apt 54
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north and west wall at public hall stairs, 4th story
Sep 3, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at fire door leading to west yard , 1st story
Sep 3, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall at public hall stairs, 5th story
Sep 3, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at bulkhead door leading to roof at public hall, 6th story
Sep 3, 2024
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 54, 5th story, 2nd apartment from south at west
Sep 3, 2024 · Apt 54
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 54, 5th story, 2nd apartment from south at west
Sep 3, 2024 · Apt 54
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 54, 5th story, 2nd apartment from south at west
Sep 3, 2024 · Apt 54
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north and west wall at public hall stairs, 4th story
Sep 3, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall stairs, 5th story
Sep 3, 2024
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department north wall in the foyer located at apt 2, 1st story, 2nd apartment from north at east
Aug 27, 2024 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of household items blocking window to fire escape in the 1st room from east located at apt 2, 1st story, 2nd apartment from north at east
Aug 27, 2024 · Apt 2
Closed — Violation dismissed - BHazardous
Replace with new the missing upper escutcheon plate at east riser pipe in the kitchen located at apt 2, 1st story, 2nd apartment from north at east
Aug 27, 2024 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation riser pipe at east in the kitchen located at apt 2, 1st story, 2nd apartment from north at east
Aug 27, 2024 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department north wall at public hall stairs, 5th story
Aug 27, 2024
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 1st story, 2nd apartment from north at east
Aug 27, 2024 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective metal support bracket under second tread from bottom up at public hall stairs, 6th story
Aug 27, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door to east yard at public hall, 1st story
Aug 27, 2024
Closed — Violation closed
DOB building violations · 12
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Construction other optional
A fire occurred in apartment 63 causing damage to 63 and 64 roof open, windows in both apartments and skylight broken at time of inspection
Mar 29, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 21, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 9, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 28, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - active - Immediate emergency anythingoptional
Provide 60 linear feet of construction fence along exposure#3 to sepeerate the collapsed retaining wall from the emergency egress pathway
Mar 3, 2020
Dob violation - dismissed - Construction other optional
Emergency work. owner is directed to immed retain a lic. structural eng'r and proceed with the emergency stabilization of the collasped r/w along exp 3(rear yard)design s/s sketches for the emergency stab to be submitted to the r/w unit by 3/9/20.emergency work to be performed under continuous supervison.file permits within 48 hrs
Mar 2, 2020
Dob violation - dismissed - Construction other optional
Emergency fence.ownder is directed to immed proceed with the erection of a 6ft construction fence. emergency fence should be installed along exp 3. separating the collapsed r/w from the emergency egress pathway fence to be instaleed no later that 3/7/20. file for all permits w/in 48 hrs of commenicing work. ensure emergency pathways is maintained
Mar 2, 2020
Dob violation - dismissed
Show 2 more ↓
- Construction other optional
Failure to maintain building in code compliant manner. at time of inspection noted retaining wall in rear yard fully collapsed, wall was approx. 6' high and 50' long. collapsed wall is blocking egress in rear yard. building management informed they need to provide 2 fireguards immediately who will be present 24/7 until egress is fully
Feb 26, 2020
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - active
ECB violations · 20
- Class - 2
Found hb smith 28a-6 oil fired boiler leaking water from beneath front section of boiler, cleanout doors on side of boiler need to be resealed.
Jul 5, 2024 · Penalty $625
Active - Class - 2
Corroded return line. pressure gauge defective. boiler jacket corroded. door open to egress. exsposed wires.
Oct 20, 2022 · Penalty $625
Active - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35555946h issued on 4/19/2021 and to file a certificated of correction pursuant to 28-201.1 and 1rcny 102-01.no cofc on file.remedy
Dec 17, 2021 · Penalty $5,000
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/v35555946h issued4/19/21 &to file c/c pursuant to28-201.1&1rcny102-01.for failure to maintain bldg in codecompliant manner comply w/commissioner's o
Oct 25, 2021 · Penalty $5,000
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35555946h issued on 4/19/2021 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain bld
Sep 1, 2021 · Penalty $5,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35555946h issued on 04/19/21 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a cert of c
Jul 23, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/v35555946h issued4/19/21 &to file c/c pursuant to28-201.1&1rcny102-01.no c/c on file.comply w/commissioner's order &/or file c/c.
Jun 8, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to maintain bldg in code compliant manner at rear or bldg a retaining wall collapsed & is being repaired. althrough a temporary construction fence has been installed the permit for it has expised. no ce
Apr 19, 2021 · Penalty $625
Active - Class - 1
Failure to comply w/commissioner's order contained in summons/v39018394k issued2/26/20&to file c/c pursuant to28-201.1&1rcny102-01.for work w/o permit.comply w/commissioner's order &/or file c/c.
Feb 26, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/v35502327j issued9/18/20&to file c/c pursuant to28-201.1&1rcny102-01.comply w/commissioner's order &/or file c/c.
Feb 26, 2021 · Penalty $1,250
Resolve
Show 10 more ↓
- Class - 1
Failure to comply w/ commissioner's order contained in summons/violation#39018394k issued on 2/26/20 & to file certificate of correction pursuant to 28-201.1&1rcny102-01.work w/o permit.comply w/ commissioner's
Jan 8, 2021 · Penalty $6,250
Resolve - Class - 2
Failure to comply w/ commissioner's order contained in summons/violation#35502327j issued on 9/18/20 & to file certificate of correction pursuant to 28-201.1&1rcny102-01.failure to maintain bldg in code complia
Jan 8, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/vio#35502327j issued on 9/18/2020 and to file a certificate of correctionpursuant to 28-201.1 and 1rcny 102-01. failure to maintain building in
Nov 9, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#39018394k issued on 02/26/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner
Nov 9, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in code-compliant manner noted:at time ofmy inspection i observed at exposure#3 at rear yard of building a retaining wall fully collaped.wall was approximately 6 feet in high and 50
Sep 18, 2020 · Penalty $3,125
Active - Class - 1
Unlawful acts. failure to comply w/ commissioners order. no certificate of correction filed for vio#39018394k w/ hearing date passed. vio#39018394k regarding fall collapse of retaining wall at exp#3. remedy:com
Sep 17, 2020 · Penalty $2,500
Resolve - Class - 2
Electrical work w/o permit.at time of inspection observed new a/c condensor connection lines and peder line from the beauty salon within thebuilding hallway on the ceiling and attached to the a/c unit on exteri
Jul 31, 2020 · Penalty $400
Active - Class - 1
Failure to maintain building in code compliant manner.lack of emergency lighting for exits,exit discharges and public corridors pepr bc1006.1,27-542.at time of inspection,observed and tested all emergency light
Jul 31, 2020 · Penalty $2,500
Active - Class - 1
Failure to maintain building in code compliant manner. at time of inspection observed retaining wall in rear yard of building fully collapsed, wall was approximately 6' high and 50' long. collapsed wall is bloc
Feb 26, 2020 · Penalty $1,250
Active - Non-hazardous
34a
Jun 28, 2004
Resolve
Complaints
- Plumbing
Basin/sink
Sep 26, 2025 · Apt 2
Close - Flooring/stairs
Floor
Sep 26, 2025 · Apt 2
Close - Paint/plaster
Ceiling
Sep 9, 2025 · Apt 2
Close - Flooring/stairs
Floor
Sep 9, 2025 · Apt 2
Close - Unsanitary condition
Mold
Aug 22, 2025 · Apt 22
Close - Water leak
Heavy flow
Jun 2, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Feb 21, 2025 · Apt 54
Close - Unsanitary condition
Pests
Aug 29, 2024 · Apt 31
Close - Flooring/stairs
Floor
Aug 29, 2024 · Apt 31
Close - Paint/plaster
Ceiling
Aug 29, 2024 · Apt 31
Close
Show 40 more ↓
- Unsanitary condition
Pests
Aug 29, 2024 · Apt 31
Close - Heat/hot water
Entire building
Jan 21, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2023 · Apt BLDG
Close - Plumbing
Basin/sink
Nov 26, 2023 · Apt 63
Close - Heat/hot water
Apartment only
Nov 26, 2023 · Apt 63
Close - Heat/hot water
Apartment only
Oct 18, 2023 · Apt 63
Close - Door/window
Door
Oct 18, 2023 · Apt 63
Close - Safety
Window guard broken/missing
Oct 18, 2023 · Apt 63
Close - Appliance
Electric/gas range
Oct 18, 2023 · Apt 63
Close - Plumbing
Radiator
Oct 18, 2023 · Apt 63
Close - Plumbing
Toilet
Oct 16, 2023 · Apt 63
Close - Plumbing
Basin/sink
Oct 16, 2023 · Apt 63
Close - Plumbing
Basin/sink
Oct 16, 2023 · Apt 63
Close - Safety
Window guard broken/missing
Oct 16, 2023 · Apt 63
Close - Plumbing
Water supply
Oct 16, 2023 · Apt 63
Close - General
Cooking gas
Oct 16, 2023 · Apt 63
Close - Plumbing
Bathtub/shower
Oct 16, 2023 · Apt 63
Close - Plumbing
Basin/sink
Oct 16, 2023 · Apt 63
Close - Heat/hot water
Entire building
Mar 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 11, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 26, 2022 · Apt 32
Close - Heat/hot water
Entire building
Nov 26, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 17, 2022 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 28, 2022 · Apt 2
Close - Unsanitary condition
Pests
Aug 1, 2022 · Apt 44
Close - Unsanitary condition
Pests
Aug 1, 2022 · Apt 44
Close - Unsanitary condition
Pests
Jul 25, 2022 · Apt 2
Close - Unsanitary condition
Pests
Jul 25, 2022 · Apt 2
Close - Unsanitary condition
Pests
Jul 25, 2022 · Apt 2
Close - Heat/hot water
Entire building
Feb 28, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 28, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 28, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 24, 2021 · Apt 61
Close - Paint/plaster
Wall
Dec 26, 2020 · Apt 21
Close - Paint/plaster
Ceiling
Dec 26, 2020 · Apt 21
Close - Paint/plaster
Ceiling
Dec 26, 2020 · Apt 21
Close - Water leak
Heavy flow
Dec 26, 2020 · Apt 21
Close - Electric
Wiring
Jul 30, 2020 · Apt 43
Close - Electric
Wiring
Jul 30, 2020 · Apt 43
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Jul 30, 2026 | $239,000 | Coops - walkup apartments | — |
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1910
- Floors
- 6
- Residential units
- 22
- Building area
- 17,466 ft²
- Lot area
- 4,240 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2108 / 77
- Assessed value
- $1,192,050
- Landmark / historic district
- No
HPD registration #114770, last renewed Sep 12, 2025.
Questions about 1987 Amsterdam Avenue
Who owns 1987 Amsterdam Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1987-89 Amsterdam Ave H D F C.
Does 1987 Amsterdam Avenue have violations?
Yes. NYC HPD has recorded 212 housing violations at this property.
Is 1987 Amsterdam Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1987 Amsterdam Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 1987 Amsterdam Avenue?
It has 22 residential units and 25 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.